Loading...
HomeMy WebLinkAboutS-332506i to C) w CV W (n ' O z o = cn z ,;r ii o Q � 0 U W 0 z Mulmmi • ' �® 1. ALL WORK MA TER/ALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST EDITION OF THE WSD T /APWA STANDARDS AND SPECIFICATIONS. 2. THE HOURS OF WORK IN THE STREET RIGHT OF- WA Y SHALL BE LIMI TED TO 8: 30 A.M. TO 3.30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES, PARTIAL, OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE. J. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND CITY OF RENTON STANDARD SPECIFICATIONS. 4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. 5. A PRE - CONSTRUCTION CONFERENCE AND A 24 HOURS NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILL ALL CONSTRUCTION. 6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS 9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS-BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OF LICENSED PROFESSIONAL SURVEYOR. 11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 81 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS. 13 DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S. 14. ALL DISTURBED AREAS SHALL BE SEEDED MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7-02.J(l) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE. 16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTV D 3034, SDR 35, OR DUCTILE IRON CLASS 50. 17 IN UN- IMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND MAXIMUM 18 INCH ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. 1/2'L-� E-- 118" RA /SE -112" WIDE BORDER 10" 9" 8 3/4" ■ 314" SPACES SPACED -314" 12" AS INDICATED-HT 1/8" FIBER JO PACKING 1" 1/8 CAST IRON RING AND COVER PIPE MA TERIAL A S SPECIFIED. ! PROPERTY LINE SIDE SEWER MAIN TO BUILDING SEWER c x o W _>7 3 N !j! 6 °' BLDG SEWER Cv o Q W 6" SIDE OUTLET TEE ?, "X4 " 2 STUD SERVICE A RKER z PAINT , UPPER PORTION WHITE w AND STENCIL ON SIDE WORD "SEWER" WITH 3" HIGH �" � Zt BLACK LETTERS. 6 " SIDE SEWER & BUILDING SEWER PLAN 2 ` N � • CONCRETE 60° ALLOWABLE MAX SIDE SEWER SHALL HA VE A BLOCKING FOR CAST OR MINIMUM 5' COVER AT PROPERTY UCTILE IRON M/�X PIPE. LINE OR 3 -5' LOWER THAN THE 6 "MIN 45° LOWEST HOUSE ELEVATION, WHICH- 25 A41N EVER IS LOWER. 6 "MIN HORIZONTAL = cn z ,;r ii o Q � 0 U W 0 z Mulmmi • ' �® 1. ALL WORK MA TER/ALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST EDITION OF THE WSD T /APWA STANDARDS AND SPECIFICATIONS. 2. THE HOURS OF WORK IN THE STREET RIGHT OF- WA Y SHALL BE LIMI TED TO 8: 30 A.M. TO 3.30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES, PARTIAL, OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE. J. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND CITY OF RENTON STANDARD SPECIFICATIONS. 4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. 5. A PRE - CONSTRUCTION CONFERENCE AND A 24 HOURS NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILL ALL CONSTRUCTION. 6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS 9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS-BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OF LICENSED PROFESSIONAL SURVEYOR. 11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 81 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS. 13 DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S. 14. ALL DISTURBED AREAS SHALL BE SEEDED MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7-02.J(l) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE. 16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTV D 3034, SDR 35, OR DUCTILE IRON CLASS 50. 17 IN UN- IMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND MAXIMUM 18 INCH ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. 1/2'L-� E-- 118" RA /SE -112" WIDE BORDER 10" 9" 8 3/4" ■ 314" SPACES SPACED -314" 12" AS INDICATED-HT 1/8" FIBER JO PACKING 1" 1/8 CAST IRON RING AND COVER PIPE MA TERIAL A S SPECIFIED. ! PROPERTY LINE SIDE SEWER MAIN TO BUILDING SEWER c x o W _>7 3 N !j! 6 °' BLDG SEWER Cv o Q W 6" SIDE OUTLET TEE ?, "X4 " 2 STUD SERVICE A RKER z PAINT , UPPER PORTION WHITE w AND STENCIL ON SIDE WORD "SEWER" WITH 3" HIGH �" � Zt BLACK LETTERS. 6 " SIDE SEWER & BUILDING SEWER PLAN 2 ` N � p a CONCRETE 60° ALLOWABLE MAX SIDE SEWER SHALL HA VE A BLOCKING FOR CAST OR MINIMUM 5' COVER AT PROPERTY = cn z ,;r ii o Q � 0 U W 0 z Mulmmi • ' �® 1. ALL WORK MA TER/ALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST EDITION OF THE WSD T /APWA STANDARDS AND SPECIFICATIONS. 2. THE HOURS OF WORK IN THE STREET RIGHT OF- WA Y SHALL BE LIMI TED TO 8: 30 A.M. TO 3.30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES, PARTIAL, OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE. J. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND CITY OF RENTON STANDARD SPECIFICATIONS. 4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. 5. A PRE - CONSTRUCTION CONFERENCE AND A 24 HOURS NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILL ALL CONSTRUCTION. 6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS 9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS-BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OF LICENSED PROFESSIONAL SURVEYOR. 11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 81 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS. 13 DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S. 14. ALL DISTURBED AREAS SHALL BE SEEDED MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7-02.J(l) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE. 16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTV D 3034, SDR 35, OR DUCTILE IRON CLASS 50. 17 IN UN- IMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND MAXIMUM 18 INCH ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. 1/2'L-� E-- 118" RA /SE -112" WIDE BORDER 10" 9" 8 3/4" ■ 314" SPACES SPACED -314" 12" AS INDICATED-HT 1/8" FIBER JO PACKING 1" 1/8 CAST IRON RING AND COVER PIPE MA TERIAL A S SPECIFIED. ! PROPERTY LINE SIDE SEWER MAIN TO BUILDING SEWER Q x ° ? _>7 !j! 6 °' BLDG SEWER Cv o 6" SIDE OUTLET TEE ?, "X4 " 2 STUD SERVICE A RKER z PAINT , UPPER PORTION WHITE = cn z ,;r ii o Q � 0 U W 0 z Mulmmi • ' �® 1. ALL WORK MA TER/ALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST EDITION OF THE WSD T /APWA STANDARDS AND SPECIFICATIONS. 2. THE HOURS OF WORK IN THE STREET RIGHT OF- WA Y SHALL BE LIMI TED TO 8: 30 A.M. TO 3.30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES, PARTIAL, OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE. J. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND CITY OF RENTON STANDARD SPECIFICATIONS. 4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. 5. A PRE - CONSTRUCTION CONFERENCE AND A 24 HOURS NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILL ALL CONSTRUCTION. 6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS 9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS-BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OF LICENSED PROFESSIONAL SURVEYOR. 11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 81 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS. 13 DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S. 14. ALL DISTURBED AREAS SHALL BE SEEDED MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7-02.J(l) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE. 16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTV D 3034, SDR 35, OR DUCTILE IRON CLASS 50. 17 IN UN- IMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND MAXIMUM 18 INCH ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. 1/2'L-� E-- 118" RA /SE -112" WIDE BORDER 10" 9" 8 3/4" ■ 314" SPACES SPACED -314" 12" AS INDICATED-HT 1/8" FIBER JO PACKING 1" 1/8 CAST IRON RING AND COVER PIPE MA TERIAL A S SPECIFIED. ! PROPERTY LINE SIDE SEWER MAIN TO BUILDING SEWER 4 3/4" PLUG TO BE SEALED IN SAME MANNER AS MAIN SEWER JOINTS. CLEAN -OUT DETAIL r 1/2 BLIND FLANGE AS DAM D.I.P. TEE CL.50 - ONE LENGTH OF DUCTILE IRON PIPE (CLASS 50) TO SOLID BEARING WHEN SPAN IS MORE THAN 4'. FLEXIBLE =\ JOINT BACKFILL WITH COMPACTED MATERIAL AS DIRECTED BY ENGINEER. x Z N t 25" I CASTING INLAND FlY OR EQUAL. P T#714 SEE DETAIL 5.1.4 ADJUSTMENT 4" MIDI. CONE MORTAR JOINTS STEPS -314" DEFO WED BAR STEPS SHALL BE 14CLUDED 6 1/2" CONRETE RISER BY PIPE INC. OR APPROVED EOA L MAX. PIPE SIZE —. " I. D, LADDER —STD. ALWINUM OR GAL VANIZED STEEL. CONCRETE SHELF MORTAR ILET PRECAST BASE SECTION OR CAST IN PLACE' 6" MIN. I ---I 6 " MIN. SANITARY MANHOLE TYPICAL DETAIL (N TS) TYP. SEE SH TS, 11 & 12 NOTES: 1. STEPS TO BE 3/4" 0 DEFORMED BAR GALVANIZED SAFTTY STEPS OR EQUAL 2. STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTI ❑NS ARE INSTALLED 3. CASTING TO BE OLYMPIC FOUNDRY MH30 WITH MH30 D/T OR EQUAL. PER DWG, BR29 4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE 5. OPENING SHOULD BE ON DOWNSTREAM SIDE. 6. ALL JOINTS SHALL BE GROUTED, 7. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR SURFACES, INCLUDING CHANNELING, COATED (SEALED) WITH A HIGH SOLIDS URETHANE COATING, WASSER MC- CONSEAL OR APPROVED EQUAL; r-6" MIN. COLOR OF COATING SHALL BE WHITE. 1/2 PLUG AS DAM TYPICAL TEE 2" MIN. MANHOLE 6" MIN. r R Q x ° ? FU TURF 6 " SEWER PIPE 6 °' BLDG SEWER Cv o 6" SIDE OUTLET TEE ?, "X4 " 2 STUD SERVICE A RKER PAINT , UPPER PORTION WHITE w AND STENCIL ON SIDE WORD "SEWER" WITH 3" HIGH BLACK LETTERS. 6 " SIDE SEWER & BUILDING SEWER PLAN 6" SIDE SEWER 1: J. 5 MIX NOTE: CONCRETE 60° ALLOWABLE MAX SIDE SEWER SHALL HA VE A BLOCKING FOR CAST OR MINIMUM 5' COVER AT PROPERTY UCTILE IRON M/�X PIPE. LINE OR 3 -5' LOWER THAN THE 6 "MIN 45° LOWEST HOUSE ELEVATION, WHICH- 25 A41N EVER IS LOWER. 6 "MIN HORIZONTAL 6" SIDE OUTLET TEE SEWER MAIN EXISTING SEWER MAIN CONC. BLOCKING ANGLE 1-6" SIDE SEWER OF TEE A T MAIN OVER 250 ELEVA TION " �� 6 "TEST TEE TO BE INSTALLED A T CONNECTION �1 ko OG NO TE: � op \� gip MAKE TAP THROUGH CAST IRON G PA SADDLE SECURED TO SEWER MAIN SCONNECTING ZH WHEN NEW SIDES SEWERS TO EXISTING MAIN. MIN SLOPE AL VITRIFIED CLAY, PLAIN & TYPICAL SIDE SEWER REINFORCED CONCRETE, Dl & C1 PIPE SEWER MAINS ARE TO ELEVA TI ON BE CORE DRILLED. SIDE SEWER SERVICE DETAIL_ 6" MIN. 7 4 3/4" PLUG TO BE SEALED IN SAME MANNER AS MAIN SEWER JOINTS. CLEAN -OUT DETAIL r 1/2 BLIND FLANGE AS DAM D.I.P. TEE CL.50 - ONE LENGTH OF DUCTILE IRON PIPE (CLASS 50) TO SOLID BEARING WHEN SPAN IS MORE THAN 4'. FLEXIBLE =\ JOINT BACKFILL WITH COMPACTED MATERIAL AS DIRECTED BY ENGINEER. x Z N t 25" I CASTING INLAND FlY OR EQUAL. P T#714 SEE DETAIL 5.1.4 ADJUSTMENT 4" MIDI. CONE MORTAR JOINTS STEPS -314" DEFO WED BAR STEPS SHALL BE 14CLUDED 6 1/2" CONRETE RISER BY PIPE INC. OR APPROVED EOA L MAX. PIPE SIZE —. " I. D, LADDER —STD. ALWINUM OR GAL VANIZED STEEL. CONCRETE SHELF MORTAR ILET PRECAST BASE SECTION OR CAST IN PLACE' 6" MIN. I ---I 6 " MIN. SANITARY MANHOLE TYPICAL DETAIL (N TS) TYP. SEE SH TS, 11 & 12 NOTES: 1. STEPS TO BE 3/4" 0 DEFORMED BAR GALVANIZED SAFTTY STEPS OR EQUAL 2. STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTI ❑NS ARE INSTALLED 3. CASTING TO BE OLYMPIC FOUNDRY MH30 WITH MH30 D/T OR EQUAL. PER DWG, BR29 4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE 5. OPENING SHOULD BE ON DOWNSTREAM SIDE. 6. ALL JOINTS SHALL BE GROUTED, 7. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR SURFACES, INCLUDING CHANNELING, COATED (SEALED) WITH A HIGH SOLIDS URETHANE COATING, WASSER MC- CONSEAL OR APPROVED EQUAL; r-6" MIN. COLOR OF COATING SHALL BE WHITE. 1/2 PLUG AS DAM TYPICAL TEE 2" MIN. MANHOLE 6" MIN. r R D.I.P. C1.50 6" MIN. Q ku WITH MIN. 4 SHACKLE RODS CEMENT CONCRETE CLASS C BLOCK POURED IN PLACE D.I.P. 90° BEND CL.50(MJ X PE) TYPICAL MANHOLE -� FOUNDATION CONSTRUCTION DUCTILE IRON DROP CONNECTION OUTSIDE DROP SSMH 1. ONE LENGTH OF DUCTILE IRON PIPE (CLASS 50) TO SOLID BEARING WHEN SPAN IS MORE THAN 4'. FLEXIBLE JOINT BACKFILL WITH COMPACTED MATERIAL AS DIRECTED BY ENGINEER. CEMENT CONCRETE CLASS C POURED IN PLACE 90° BEND RECOMMENDED (TYTON U -651) w FOR APPROVAL r BY DATE CONCRETE ENCASED BY DATE DROP CONNECTION BY DATE BY DATE BY DATE a Al" � -�3 "AS- BUILT" NOTE: "AS- BUILT IS BASED ON AACTUAL FIELD SURVEY BY TOUMA ENGINEERS ANDiNFORMATION SUPPLIED BY CONTRACTOR. .jLaa . `70 IONni. Iii Q x � Q 0 Cv o D.I.P. C1.50 6" MIN. Q ku WITH MIN. 4 SHACKLE RODS CEMENT CONCRETE CLASS C BLOCK POURED IN PLACE D.I.P. 90° BEND CL.50(MJ X PE) TYPICAL MANHOLE -� FOUNDATION CONSTRUCTION DUCTILE IRON DROP CONNECTION OUTSIDE DROP SSMH 1. ONE LENGTH OF DUCTILE IRON PIPE (CLASS 50) TO SOLID BEARING WHEN SPAN IS MORE THAN 4'. FLEXIBLE JOINT BACKFILL WITH COMPACTED MATERIAL AS DIRECTED BY ENGINEER. CEMENT CONCRETE CLASS C POURED IN PLACE 90° BEND RECOMMENDED (TYTON U -651) w FOR APPROVAL r BY DATE CONCRETE ENCASED BY DATE DROP CONNECTION BY DATE BY DATE BY DATE a Al" � -�3 "AS- BUILT" NOTE: "AS- BUILT IS BASED ON AACTUAL FIELD SURVEY BY TOUMA ENGINEERS ANDiNFORMATION SUPPLIED BY CONTRACTOR. .jLaa . `70 IONni. Iii