1. ALL WORK MA TER/ALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND
SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST
EDITION OF THE WSD T /APWA STANDARDS AND SPECIFICATIONS.
2. THE HOURS OF WORK IN THE STREET RIGHT OF- WA Y SHALL BE LIMI TED TO 8: 30
A.M. TO 3.30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY
THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES,
PARTIAL, OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24
HOURS IN ADVANCE. THE POLICE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24
HOURS IN ADVANCE.
J. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS
FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE
CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND
CITY OF RENTON STANDARD SPECIFICATIONS.
4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL
BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT
LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE.
5. A PRE - CONSTRUCTION CONFERENCE AND A 24 HOURS NOTICE SHALL BE REQUIRED
PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING
CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF
THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILL ALL
CONSTRUCTION.
6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF
CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE
CONSTRUCTION SITE.
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE
AND ANY RELATED PERMITS PRIOR TO ANY CONSTRUCTION.
8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE
PRECEDENCE OVER ALL OTHER PLANS
9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS-BUILT
DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND
SIGNED BY A LICENSED PROFESSIONAL ENGINEER OF LICENSED
PROFESSIONAL SURVEYOR.
11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS
WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 81 INCHES,
THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE
COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE
PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS HOT MIX PATCH SHALL BE
PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT
STANDARDS.
13 DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S.
14. ALL DISTURBED AREAS SHALL BE SEEDED MULCHED OR OTHERWISE STABILIZED TO
THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION
AFTER THE COMPLETION OF CONSTRUCTION.
15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED
FOUNDATION IN ACCORDANCE WITH SECTION 7-02.J(l) OF THE CURRENT STATE OF
WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF
THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED
BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE
WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING
SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE.
16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED
ASTV D 3034, SDR 35, OR DUCTILE IRON CLASS 50.
17 IN UN- IMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND MAXIMUM 18
INCH ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL
DIRECTIONS TO MATCH PAVING.
1/2'L-� E--
118" RA /SE -112" WIDE
BORDER
10"
9"
8 3/4"
■
314" SPACES SPACED -314" 12"
AS INDICATED-HT 1/8" FIBER JO
PACKING
1" 1/8
CAST IRON RING AND COVER PIPE MA TERIAL
A S SPECIFIED.
! PROPERTY LINE
SIDE SEWER MAIN TO BUILDING SEWER
c
x
o
W
_>7
3
N
!j!
6 °' BLDG SEWER
Cv
o
Q
W
6" SIDE OUTLET TEE ?,
"X4 "
2 STUD SERVICE A RKER
z
PAINT , UPPER PORTION WHITE
w
AND STENCIL ON SIDE WORD
"SEWER" WITH 3" HIGH
�"
�
Zt
BLACK LETTERS.
6 " SIDE SEWER & BUILDING SEWER
PLAN
2
`
N
�
•
CONCRETE 60° ALLOWABLE MAX
SIDE SEWER SHALL HA VE A
BLOCKING FOR CAST OR
MINIMUM 5' COVER AT PROPERTY
UCTILE IRON
M/�X
PIPE. LINE OR 3 -5' LOWER THAN THE
6 "MIN
45°
LOWEST HOUSE ELEVATION, WHICH-
25 A41N
EVER IS LOWER.
6 "MIN
HORIZONTAL
= cn z
,;r
ii
o
Q �
0
U
W
0
z
Mulmmi
• ' �®
1. ALL WORK MA TER/ALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND
SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST
EDITION OF THE WSD T /APWA STANDARDS AND SPECIFICATIONS.
2. THE HOURS OF WORK IN THE STREET RIGHT OF- WA Y SHALL BE LIMI TED TO 8: 30
A.M. TO 3.30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY
THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES,
PARTIAL, OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24
HOURS IN ADVANCE. THE POLICE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24
HOURS IN ADVANCE.
J. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS
FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE
CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND
CITY OF RENTON STANDARD SPECIFICATIONS.
4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL
BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT
LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE.
5. A PRE - CONSTRUCTION CONFERENCE AND A 24 HOURS NOTICE SHALL BE REQUIRED
PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING
CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF
THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILL ALL
CONSTRUCTION.
6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF
CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE
CONSTRUCTION SITE.
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE
AND ANY RELATED PERMITS PRIOR TO ANY CONSTRUCTION.
8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE
PRECEDENCE OVER ALL OTHER PLANS
9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS-BUILT
DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND
SIGNED BY A LICENSED PROFESSIONAL ENGINEER OF LICENSED
PROFESSIONAL SURVEYOR.
11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS
WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 81 INCHES,
THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE
COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE
PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS HOT MIX PATCH SHALL BE
PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT
STANDARDS.
13 DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S.
14. ALL DISTURBED AREAS SHALL BE SEEDED MULCHED OR OTHERWISE STABILIZED TO
THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION
AFTER THE COMPLETION OF CONSTRUCTION.
15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED
FOUNDATION IN ACCORDANCE WITH SECTION 7-02.J(l) OF THE CURRENT STATE OF
WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF
THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED
BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE
WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING
SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE.
16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED
ASTV D 3034, SDR 35, OR DUCTILE IRON CLASS 50.
17 IN UN- IMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND MAXIMUM 18
INCH ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL
DIRECTIONS TO MATCH PAVING.
1/2'L-� E--
118" RA /SE -112" WIDE
BORDER
10"
9"
8 3/4"
■
314" SPACES SPACED -314" 12"
AS INDICATED-HT 1/8" FIBER JO
PACKING
1" 1/8
CAST IRON RING AND COVER PIPE MA TERIAL
A S SPECIFIED.
! PROPERTY LINE
SIDE SEWER MAIN TO BUILDING SEWER
c
x
o
W
_>7
3
N
!j!
6 °' BLDG SEWER
Cv
o
Q
W
6" SIDE OUTLET TEE ?,
"X4 "
2 STUD SERVICE A RKER
z
PAINT , UPPER PORTION WHITE
w
AND STENCIL ON SIDE WORD
"SEWER" WITH 3" HIGH
�"
�
Zt
BLACK LETTERS.
6 " SIDE SEWER & BUILDING SEWER
PLAN
2
`
N
�
p
a
CONCRETE 60° ALLOWABLE MAX
SIDE SEWER SHALL HA VE A
BLOCKING FOR CAST OR
MINIMUM 5' COVER AT PROPERTY
= cn z
,;r
ii
o
Q �
0
U
W
0
z
Mulmmi
• ' �®
1. ALL WORK MA TER/ALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND
SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST
EDITION OF THE WSD T /APWA STANDARDS AND SPECIFICATIONS.
2. THE HOURS OF WORK IN THE STREET RIGHT OF- WA Y SHALL BE LIMI TED TO 8: 30
A.M. TO 3.30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY
THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES,
PARTIAL, OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24
HOURS IN ADVANCE. THE POLICE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24
HOURS IN ADVANCE.
J. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS
FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE
CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND
CITY OF RENTON STANDARD SPECIFICATIONS.
4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL
BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT
LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE.
5. A PRE - CONSTRUCTION CONFERENCE AND A 24 HOURS NOTICE SHALL BE REQUIRED
PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING
CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF
THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILL ALL
CONSTRUCTION.
6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF
CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE
CONSTRUCTION SITE.
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE
AND ANY RELATED PERMITS PRIOR TO ANY CONSTRUCTION.
8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE
PRECEDENCE OVER ALL OTHER PLANS
9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS-BUILT
DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND
SIGNED BY A LICENSED PROFESSIONAL ENGINEER OF LICENSED
PROFESSIONAL SURVEYOR.
11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS
WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 81 INCHES,
THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE
COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE
PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS HOT MIX PATCH SHALL BE
PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT
STANDARDS.
13 DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S.
14. ALL DISTURBED AREAS SHALL BE SEEDED MULCHED OR OTHERWISE STABILIZED TO
THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION
AFTER THE COMPLETION OF CONSTRUCTION.
15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED
FOUNDATION IN ACCORDANCE WITH SECTION 7-02.J(l) OF THE CURRENT STATE OF
WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF
THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED
BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE
WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING
SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE.
16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED
ASTV D 3034, SDR 35, OR DUCTILE IRON CLASS 50.
17 IN UN- IMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND MAXIMUM 18
INCH ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL
DIRECTIONS TO MATCH PAVING.
1/2'L-� E--
118" RA /SE -112" WIDE
BORDER
10"
9"
8 3/4"
■
314" SPACES SPACED -314" 12"
AS INDICATED-HT 1/8" FIBER JO
PACKING
1" 1/8
CAST IRON RING AND COVER PIPE MA TERIAL
A S SPECIFIED.
! PROPERTY LINE
SIDE SEWER MAIN TO BUILDING SEWER
Q
x
°
?
_>7
!j!
6 °' BLDG SEWER
Cv
o
6" SIDE OUTLET TEE ?,
"X4 "
2 STUD SERVICE A RKER
z
PAINT , UPPER PORTION WHITE
= cn z
,;r
ii
o
Q �
0
U
W
0
z
Mulmmi
• ' �®
1. ALL WORK MA TER/ALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND
SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LATEST
EDITION OF THE WSD T /APWA STANDARDS AND SPECIFICATIONS.
2. THE HOURS OF WORK IN THE STREET RIGHT OF- WA Y SHALL BE LIMI TED TO 8: 30
A.M. TO 3.30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY
THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES,
PARTIAL, OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24
HOURS IN ADVANCE. THE POLICE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24
HOURS IN ADVANCE.
J. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS
FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE
CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND
CITY OF RENTON STANDARD SPECIFICATIONS.
4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL
BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT
LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE.
5. A PRE - CONSTRUCTION CONFERENCE AND A 24 HOURS NOTICE SHALL BE REQUIRED
PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING
CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF
THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILL ALL
CONSTRUCTION.
6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF
CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE
CONSTRUCTION SITE.
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE
AND ANY RELATED PERMITS PRIOR TO ANY CONSTRUCTION.
8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL TAKE
PRECEDENCE OVER ALL OTHER PLANS
9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS-BUILT
DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND
SIGNED BY A LICENSED PROFESSIONAL ENGINEER OF LICENSED
PROFESSIONAL SURVEYOR.
11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS
WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 81 INCHES,
THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE
COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE
PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS HOT MIX PATCH SHALL BE
PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT
STANDARDS.
13 DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S.
14. ALL DISTURBED AREAS SHALL BE SEEDED MULCHED OR OTHERWISE STABILIZED TO
THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON -SITE EROSION
AFTER THE COMPLETION OF CONSTRUCTION.
15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED
FOUNDATION IN ACCORDANCE WITH SECTION 7-02.J(l) OF THE CURRENT STATE OF
WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF
THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED
BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE
WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING
SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE.
16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED
ASTV D 3034, SDR 35, OR DUCTILE IRON CLASS 50.
17 IN UN- IMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND MAXIMUM 18
INCH ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL
DIRECTIONS TO MATCH PAVING.
1/2'L-� E--
118" RA /SE -112" WIDE
BORDER
10"
9"
8 3/4"
■
314" SPACES SPACED -314" 12"
AS INDICATED-HT 1/8" FIBER JO
PACKING
1" 1/8
CAST IRON RING AND COVER PIPE MA TERIAL
A S SPECIFIED.
! PROPERTY LINE
SIDE SEWER MAIN TO BUILDING SEWER
4 3/4"
PLUG TO BE SEALED IN SAME
MANNER AS MAIN SEWER JOINTS.
CLEAN -OUT DETAIL
r
1/2 BLIND FLANGE AS DAM
D.I.P. TEE CL.50 -
ONE LENGTH OF DUCTILE IRON
PIPE (CLASS 50) TO SOLID
BEARING WHEN SPAN
IS MORE THAN 4'.
FLEXIBLE =\
JOINT
BACKFILL WITH
COMPACTED MATERIAL
AS DIRECTED BY
ENGINEER.
x
Z
N
t
25"
I
CASTING INLAND FlY
OR EQUAL. P T#714
SEE DETAIL 5.1.4
ADJUSTMENT 4" MIDI.
CONE
MORTAR JOINTS
STEPS -314" DEFO WED BAR
STEPS SHALL BE 14CLUDED
6 1/2"
CONRETE RISER BY PIPE INC.
OR APPROVED EOA L
MAX. PIPE SIZE —. " I. D,
LADDER —STD. ALWINUM
OR GAL VANIZED STEEL.
CONCRETE SHELF
MORTAR ILET
PRECAST BASE SECTION
OR CAST IN PLACE'
6" MIN.
I ---I 6 " MIN.
SANITARY MANHOLE TYPICAL DETAIL
(N TS)
TYP. SEE SH TS, 11 & 12
NOTES:
1. STEPS TO BE 3/4" 0 DEFORMED BAR GALVANIZED SAFTTY STEPS OR EQUAL
2. STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTI ❑NS ARE INSTALLED
3. CASTING TO BE OLYMPIC FOUNDRY MH30 WITH MH30 D/T OR EQUAL. PER DWG, BR29
4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE
5. OPENING SHOULD BE ON DOWNSTREAM SIDE.
6. ALL JOINTS SHALL BE GROUTED,
7. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR
SURFACES, INCLUDING CHANNELING, COATED (SEALED)
WITH A HIGH SOLIDS URETHANE COATING,
WASSER MC- CONSEAL OR APPROVED EQUAL;
r-6" MIN. COLOR OF COATING SHALL BE WHITE.
1/2 PLUG AS DAM
TYPICAL TEE 2" MIN.
MANHOLE
6" MIN.
r
R
Q
x
°
?
FU TURF
6 " SEWER PIPE
6 °' BLDG SEWER
Cv
o
6" SIDE OUTLET TEE ?,
"X4 "
2 STUD SERVICE A RKER
PAINT , UPPER PORTION WHITE
w
AND STENCIL ON SIDE WORD
"SEWER" WITH 3" HIGH
BLACK LETTERS.
6 " SIDE SEWER & BUILDING SEWER
PLAN
6" SIDE SEWER
1: J. 5 MIX
NOTE:
CONCRETE 60° ALLOWABLE MAX
SIDE SEWER SHALL HA VE A
BLOCKING FOR CAST OR
MINIMUM 5' COVER AT PROPERTY
UCTILE IRON
M/�X
PIPE. LINE OR 3 -5' LOWER THAN THE
6 "MIN
45°
LOWEST HOUSE ELEVATION, WHICH-
25 A41N
EVER IS LOWER.
6 "MIN
HORIZONTAL
6" SIDE OUTLET TEE
SEWER MAIN
EXISTING SEWER MAIN
CONC. BLOCKING ANGLE
1-6" SIDE SEWER
OF TEE A T MAIN OVER 250
ELEVA TION
" �� 6 "TEST TEE
TO BE INSTALLED
A T CONNECTION
�1 ko OG
NO TE:
� op
\� gip
MAKE TAP THROUGH CAST IRON
G
PA
SADDLE SECURED TO SEWER MAIN
SCONNECTING
ZH
WHEN NEW SIDES
SEWERS TO EXISTING MAIN.
MIN SLOPE
AL
VITRIFIED CLAY, PLAIN &
TYPICAL SIDE SEWER
REINFORCED CONCRETE, Dl &
C1 PIPE SEWER MAINS ARE TO
ELEVA TI ON
BE CORE DRILLED.
SIDE SEWER SERVICE DETAIL_
6" MIN. 7
4 3/4"
PLUG TO BE SEALED IN SAME
MANNER AS MAIN SEWER JOINTS.
CLEAN -OUT DETAIL
r
1/2 BLIND FLANGE AS DAM
D.I.P. TEE CL.50 -
ONE LENGTH OF DUCTILE IRON
PIPE (CLASS 50) TO SOLID
BEARING WHEN SPAN
IS MORE THAN 4'.
FLEXIBLE =\
JOINT
BACKFILL WITH
COMPACTED MATERIAL
AS DIRECTED BY
ENGINEER.
x
Z
N
t
25"
I
CASTING INLAND FlY
OR EQUAL. P T#714
SEE DETAIL 5.1.4
ADJUSTMENT 4" MIDI.
CONE
MORTAR JOINTS
STEPS -314" DEFO WED BAR
STEPS SHALL BE 14CLUDED
6 1/2"
CONRETE RISER BY PIPE INC.
OR APPROVED EOA L
MAX. PIPE SIZE —. " I. D,
LADDER —STD. ALWINUM
OR GAL VANIZED STEEL.
CONCRETE SHELF
MORTAR ILET
PRECAST BASE SECTION
OR CAST IN PLACE'
6" MIN.
I ---I 6 " MIN.
SANITARY MANHOLE TYPICAL DETAIL
(N TS)
TYP. SEE SH TS, 11 & 12
NOTES:
1. STEPS TO BE 3/4" 0 DEFORMED BAR GALVANIZED SAFTTY STEPS OR EQUAL
2. STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTI ❑NS ARE INSTALLED
3. CASTING TO BE OLYMPIC FOUNDRY MH30 WITH MH30 D/T OR EQUAL. PER DWG, BR29
4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE
5. OPENING SHOULD BE ON DOWNSTREAM SIDE.
6. ALL JOINTS SHALL BE GROUTED,
7. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR
SURFACES, INCLUDING CHANNELING, COATED (SEALED)
WITH A HIGH SOLIDS URETHANE COATING,
WASSER MC- CONSEAL OR APPROVED EQUAL;
r-6" MIN. COLOR OF COATING SHALL BE WHITE.
1/2 PLUG AS DAM
TYPICAL TEE 2" MIN.
MANHOLE
6" MIN.
r
R
D.I.P. C1.50 6" MIN. Q ku
WITH MIN. 4
SHACKLE RODS
CEMENT CONCRETE
CLASS C BLOCK
POURED IN PLACE
D.I.P. 90° BEND
CL.50(MJ X PE)
TYPICAL MANHOLE -�
FOUNDATION
CONSTRUCTION
DUCTILE IRON
DROP CONNECTION
OUTSIDE DROP SSMH
1.
ONE LENGTH OF DUCTILE IRON
PIPE (CLASS 50) TO SOLID
BEARING WHEN SPAN
IS MORE THAN 4'.
FLEXIBLE JOINT
BACKFILL WITH
COMPACTED MATERIAL
AS DIRECTED BY
ENGINEER.
CEMENT CONCRETE CLASS C POURED IN PLACE
90° BEND RECOMMENDED
(TYTON U -651)
w FOR APPROVAL
r
BY DATE
CONCRETE ENCASED BY DATE
DROP CONNECTION
BY DATE
BY DATE
BY DATE
a Al" � -�3
"AS- BUILT" NOTE:
"AS- BUILT IS BASED ON AACTUAL FIELD SURVEY
BY TOUMA ENGINEERS ANDiNFORMATION SUPPLIED
BY CONTRACTOR.
.jLaa .
`70
IONni.
Iii
Q
x
�
Q
0
Cv
o
D.I.P. C1.50 6" MIN. Q ku
WITH MIN. 4
SHACKLE RODS
CEMENT CONCRETE
CLASS C BLOCK
POURED IN PLACE
D.I.P. 90° BEND
CL.50(MJ X PE)
TYPICAL MANHOLE -�
FOUNDATION
CONSTRUCTION
DUCTILE IRON
DROP CONNECTION
OUTSIDE DROP SSMH
1.
ONE LENGTH OF DUCTILE IRON
PIPE (CLASS 50) TO SOLID
BEARING WHEN SPAN
IS MORE THAN 4'.
FLEXIBLE JOINT
BACKFILL WITH
COMPACTED MATERIAL
AS DIRECTED BY
ENGINEER.
CEMENT CONCRETE CLASS C POURED IN PLACE
90° BEND RECOMMENDED
(TYTON U -651)
w FOR APPROVAL
r
BY DATE
CONCRETE ENCASED BY DATE
DROP CONNECTION
BY DATE
BY DATE
BY DATE
a Al" � -�3
"AS- BUILT" NOTE:
"AS- BUILT IS BASED ON AACTUAL FIELD SURVEY
BY TOUMA ENGINEERS ANDiNFORMATION SUPPLIED
BY CONTRACTOR.
.jLaa .
`70
IONni.
Iii