HomeMy WebLinkAboutS-334801LEGEND
*<219 EXISTING TREE
0 10' 20' 40' 60'
SCALE: 1' - 20'
is o
NE 9th SIREET
S. LINE OF NW 1/4, SW 1/4, ;
NE 1/4 OF SEC i0, T 23 N, R 5 E
I I
i
m
SAN SEWER MH
TOP= 476.97
IE= 470.02 (S) �
FIRE
E= 469.92 (N) ;. a I - HYD
+
4) L N
R T.
D5'y301:„ 0
LU W
Zo
w
�I. +�� I Z w
HATER I -� ri �
PCIAL�wo Z 4 SF ENCES -�
- -- - --1 -- - a o
I j NI IC, I Q C
a^
4SEMENr_ I `(8 +J{
ESS. I I �. ' I 'T
_ N I SAN SEWER M
RI = - --
J 15' SAN t
z Z
W�RE FENCE S 8'19'OI;S� <bA �
J
r---
T ElgVC
60.00
5.05'
o LLI
i
2. % MIN (TYPICAL)
- - - --
0
a
I L---- - --LOTI I
,400 =4SIE 67•? I °f
; SHED ,BECK; �.
I r. '
F =472.0
I
MFF =471. 1.0 I
I I
I
*I - -- - - - - --
-------
IE =466.1
60. 0'
F - --
I
588'19'04
"E 135.n5'
NEW 3/4''
I_d I
METER I
STA 12 +85
o LOT o
Lt
6.7
5,400 S o
MFF =472.0 i rn
_____ MEE
IF _ _____
SAN SEWER MH
I I
I'
HOUSE 4' WATER
TOP= 475.33
IN
L - I I
rr'L�
i IEGRES
in
�
- - - - -- _
UTIL ,
YE CRS'- I
, r
i
m
O
Q 3
0
o
/
f
is o
NE 9th SIREET
S. LINE OF NW 1/4, SW 1/4, ;
NE 1/4 OF SEC i0, T 23 N, R 5 E
I I
i
m
SAN SEWER MH
TOP= 476.97
IE= 470.02 (S) �
FIRE
E= 469.92 (N) ;. a I - HYD
+
4) L N
R T.
D5'y301:„ 0
LU W
Zo
w
�I. +�� I Z w
HATER I -� ri �
PCIAL�wo Z 4 SF ENCES -�
- -- - --1 -- - a o
I j NI IC, I Q C
a^
4SEMENr_ I `(8 +J{
ESS. I I �. ' I 'T
_ N I SAN SEWER M
RI = - --
J 15' SAN t
q�78.
`_
- - -_WATER SEWE
r---
T ElgVC
tiARDEN -
�__'- - -
" S NSIDE SEWER I
i
2. % MIN (TYPICAL)
NEW IE= 464.66 (W)
SEE LOT)2�-I
I L---- - --LOTI I
,400 =4SIE 67•? I °f
I 6,754.5
F =472.0
I
MFF =471. 1.0 I
I I
I
I I
II I
----- - - - - --
I
I L - - - - - - - - - - - - - - j I I
IE =466.1
60. 0'
715,05' WOODFENCE
588'19'04
"E 135.n5'
4L T02305-9003
5 °90000 3
PITTMAN ENGINEERING
Civil Engineering and Consulting
John J. PltbneA P.E. 12819 SE 3881 street, #159
Bellewe, WA 98006
IRELA-ND SHORT PLAT
E 1/2 OF SECTION 10, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
STA 13 +87
PLAN
ASPEN WOODS
SAN. SEWER MH =
STA T3 +82 - PLAT
OF ASPEN WOODS
(SHT S- 325506)
TOP = 476.65
IE= 464.66 (N,S)
IE =464.56 (E)
ASPEN WOODS
/ I FOUND MONUMENT IN CASE
/ I 4X4 CONC W/1.5" BRASS
DISK W /PUNCH, 1.5' DOWN
9 1� -- 58820'03 "E 3272.04' -_ -- 1,-,-- _-- N88'20'02 "W 1987.04' 10 11
REVISED PER CITY COMMENTS
REVISED PER CITY COMMENTS
REVISED PER CITY COMMENTS
EXPIRES: 10/14/08 I NO. I REVISION I BY I DATE I APP
SANITARY SEWER NOTES AND SPECIFICATIONS
1. All work materials shall be in conformance with the standards and
specification of the City of Renton Utility Department and the latest edition
of the WSDOT /APWA Standards and Specifications.
2. All construction shall be in accordance with "Standard Specifications
for Municipal Public Works Construction" prepared by Washington State
Chapter American Public Works Association, latest edition (APWA) and City
of Renton Standard Specifications.
3. All locations of existing utilities shown are approximate and it shall be
the contractors responsibility to verify the true and correct location so as
to avoid damage or disturbance.
4. Contractor is solely responsible for the means, methods and sequences
of construction and for the safety of workers and others on the
construction site.
5. It shall be the responsibility of the contractor to obtain street use and
any other related permits prior to any construction.
6. Plans approved by the City of Renton, Public Works Department shall
take precedence over all other plans.
7. A copy of these approved plans must be on the job site whenever
construction is in progress.
8. The contractor shall provide the City of Renton with an as -built
drawing of the sanitary sewer system, which has been stamped and
signed by a licensed professional engineer or licensed professional
surveyor.
9. Backfill shall be place equally on both sides of the pipe in layers with
a loose average depth of 6 inches, maximum depth of 8 inches,
thoroughly tamping each layer to 95 percent of maximum density. These
compacted layers must extend for one pipe diameter on each side of the
pipe or to the side of the trench. Materials to complete the fill over
pipe shall be the same as described.
10. Open cut road crossings for utility trenches on existing traveled
roadway shall be backfilled with crushed rock and mechanically compacted
Cuts into the existing asphalt shall be neatline cut with saw in a
continuous line. A temporary mix patch must be placed immediately after
backfill and compaction. A permanent hot mix patch shall be ,placed
within 10 days and shall be per City of Renton current standards.
11. Datum. shall be City of Renton, 1988 NAVD.
12. All disturbed areas shall be seeded and mulched or otherwise
stabilized to the satisfaction of the Department for the prevention of on
site erosion after the completion of construction.
13. All pipe and appurtenances. shall be laid on a. properly prepared
foundation in accordance with Section 7 of the current State of
Washington Standard Specifications for Road and. Bridge Construction This
shall include necessary leveling.. of the trench bottom or the top of the
foundation material, as well as placement and compaction of required
bedding material, to uniform grade so that the entire length of the pipe
will be supported on a uniformly dense, unyielding base. Pipe bedding
shall be pea gravel 6 inches above and below the pipe.
14. Sanitary sewer pipe shall be polyvinyl chloride (PVC) rubber gasketed
ASTM D 3034, SDR 35, or ductile iron class 50.
15. In unimproved areas, manhole to extend minimum 6 inches and
maximum 12 inches above finished grade. IN paved area, cover must
slope in all directions to match paving.
PROPERTY LINE
;.,
vr;o
FUTURE
6" BUILDING SEWER PIPE BUILDING SEW P 45
w \
� `2 "z 4" STUD SERVICE MARKER PAINT
TEE WITH 6" SIDE OUTLET UPPER PORTION WHITE ANS STENCIL ON
SIDE WORDING "SEWER" WITH 3" HIGH
BLACK LEITERS. AND Q6 WIRE WRAPPED
AROUND THE STUD AND EXTENDED TO
THE TOP OF THE STUD.
6" SIDE SEWER AND BUILDING SEWER
UNLESS OTHERWISE APPROVED BY THE CITY, MAKE TAP THROUGH
CAST IRON SADDLE SECURED TO SEWER MAIN WITH STAINLESS
STEEL BANDS WHEN CONNECTING NEW SIDE SEWERS TO EXISTING
MAIN.
PLAIN AND REINFORCED CONCRETE, DI PIPE AND CI PIPE
SEWER. MAINS ARE TO BE CORE DRILLED.
VITRIFIED CLAY PIPE SHALL BE CUT AND HAVE A NEW TEE
SECTIONED IN.
60" ALLOWABLE MAX.
FOR CAST IRON PIPE OR
DUCTILE IRON PIPE.
1:3:5 MIX
CONCRETE
BLOCKING \� ,z5 PaGT,EevOGK
M oNCR
2% MIN SLOPE
6" SIDE OUTLET TEE HORIZONTAL
SEWER MAIN
6" MIN. SEWER MAIN
CONCRETE BLOCKING ANGLE
OF TEE AT MAIN OVER 25 ELEVATION TYPICAL SIDE SEWER ELEVATION
NOTE:
UNLESS OTHERWISE SHOWN ON PLAN. S1DE SEWER SHALL HAVE A
MINIMUM 2.5' COVER AT PROPERTY .LINE OR 3 -5' LOWER THAN THE
LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER.
NOTE:
ALL TRENCH RESTORATION SHALL BE PER
CURRENT CITY OF RENTON TRENCH
RESTORATION AND STREET OVERLAY DETAIL
BASIS OF BEARINGS
N 00'02'42" E BETWEEN THE MONUMENTS FOUND
AT THE EAST QUARTER AND THE NORTHEAST
SECTION CORNER.OF SECTION 10, TOWNSHIP 23
NORTH, RANGE 5 EAST, W.M.
DATUM
NAVD88 PER CITY OF RENTON
BENCHMARK
CITY OF RENTON POINT NO.1907, CHISELED
SQUARE IN SE CORNER CONCRETE MAILBOX BASE,
WEST SIDE' 142ND AVE SE,
OPPOSITE HOUSE NO. 12014
ELEV = 472.66 FEET.
STANDARD SIDE SEWER INSTALLATION CALL BEFORE YOU DO 1-800-424,5555
-
No SCALE RECOMMENDED CHECKED FOR COMPLIANCE
NOTE: FOR AP OVAL TO CITY STANDARDS gall
EXISTING UTILITY LOCATIONS SHOWN HEREON ARE APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S Date of
RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UNDERGROUND
UTILITIES PRIOR TO COMMENCING CONSTRUCTION. NO REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES BY Date
ARE SHOWN HEREON. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES Date
NOT SHOWN IN THEIR PROPER LOCATION. BY
BAIMA HOLMBERG 1 ° = 20' xoN¢oN1 NID 91991 +i >b 07/28/06
JJP so CITY OF IRELAND SHORT .PLAT
°^^ TLR RENTON 811 HOOUTAM AVENUE NE
aaam DATUM
JdP
AT Hill i Z. I Planning /Building /Public Works Dept. SANITARY SEWER PLAN
ONE INCH
R s< NNE. 4 4
CD %5- 3ykk0ol
WANNY �; lllM 8 2�Clf
isi= V
1
\ STA 0 +90.03 -- CENTER 142nd AVE -NE
_ .CENTER INGRESS, EGRESS AND UTILITY EASEMENT
I
+�
N
NEW IE= 464.66 (W)
v1 w
a
a
I¢
a
IT
II
I_d I
pry OTi of
STA 12 +85
PLAT OF
ASPEN WOODS
SAN SEWER MH
TOP= 475.33
IE= 465.38 (S)
IE= 465.28 (N)
in
4L 10230��9�4C�
3
m
/
f
/ I FOUND MONUMENT IN CASE
/ I 4X4 CONC W/1.5" BRASS
DISK W /PUNCH, 1.5' DOWN
9 1� -- 58820'03 "E 3272.04' -_ -- 1,-,-- _-- N88'20'02 "W 1987.04' 10 11
REVISED PER CITY COMMENTS
REVISED PER CITY COMMENTS
REVISED PER CITY COMMENTS
EXPIRES: 10/14/08 I NO. I REVISION I BY I DATE I APP
SANITARY SEWER NOTES AND SPECIFICATIONS
1. All work materials shall be in conformance with the standards and
specification of the City of Renton Utility Department and the latest edition
of the WSDOT /APWA Standards and Specifications.
2. All construction shall be in accordance with "Standard Specifications
for Municipal Public Works Construction" prepared by Washington State
Chapter American Public Works Association, latest edition (APWA) and City
of Renton Standard Specifications.
3. All locations of existing utilities shown are approximate and it shall be
the contractors responsibility to verify the true and correct location so as
to avoid damage or disturbance.
4. Contractor is solely responsible for the means, methods and sequences
of construction and for the safety of workers and others on the
construction site.
5. It shall be the responsibility of the contractor to obtain street use and
any other related permits prior to any construction.
6. Plans approved by the City of Renton, Public Works Department shall
take precedence over all other plans.
7. A copy of these approved plans must be on the job site whenever
construction is in progress.
8. The contractor shall provide the City of Renton with an as -built
drawing of the sanitary sewer system, which has been stamped and
signed by a licensed professional engineer or licensed professional
surveyor.
9. Backfill shall be place equally on both sides of the pipe in layers with
a loose average depth of 6 inches, maximum depth of 8 inches,
thoroughly tamping each layer to 95 percent of maximum density. These
compacted layers must extend for one pipe diameter on each side of the
pipe or to the side of the trench. Materials to complete the fill over
pipe shall be the same as described.
10. Open cut road crossings for utility trenches on existing traveled
roadway shall be backfilled with crushed rock and mechanically compacted
Cuts into the existing asphalt shall be neatline cut with saw in a
continuous line. A temporary mix patch must be placed immediately after
backfill and compaction. A permanent hot mix patch shall be ,placed
within 10 days and shall be per City of Renton current standards.
11. Datum. shall be City of Renton, 1988 NAVD.
12. All disturbed areas shall be seeded and mulched or otherwise
stabilized to the satisfaction of the Department for the prevention of on
site erosion after the completion of construction.
13. All pipe and appurtenances. shall be laid on a. properly prepared
foundation in accordance with Section 7 of the current State of
Washington Standard Specifications for Road and. Bridge Construction This
shall include necessary leveling.. of the trench bottom or the top of the
foundation material, as well as placement and compaction of required
bedding material, to uniform grade so that the entire length of the pipe
will be supported on a uniformly dense, unyielding base. Pipe bedding
shall be pea gravel 6 inches above and below the pipe.
14. Sanitary sewer pipe shall be polyvinyl chloride (PVC) rubber gasketed
ASTM D 3034, SDR 35, or ductile iron class 50.
15. In unimproved areas, manhole to extend minimum 6 inches and
maximum 12 inches above finished grade. IN paved area, cover must
slope in all directions to match paving.
PROPERTY LINE
;.,
vr;o
FUTURE
6" BUILDING SEWER PIPE BUILDING SEW P 45
w \
� `2 "z 4" STUD SERVICE MARKER PAINT
TEE WITH 6" SIDE OUTLET UPPER PORTION WHITE ANS STENCIL ON
SIDE WORDING "SEWER" WITH 3" HIGH
BLACK LEITERS. AND Q6 WIRE WRAPPED
AROUND THE STUD AND EXTENDED TO
THE TOP OF THE STUD.
6" SIDE SEWER AND BUILDING SEWER
UNLESS OTHERWISE APPROVED BY THE CITY, MAKE TAP THROUGH
CAST IRON SADDLE SECURED TO SEWER MAIN WITH STAINLESS
STEEL BANDS WHEN CONNECTING NEW SIDE SEWERS TO EXISTING
MAIN.
PLAIN AND REINFORCED CONCRETE, DI PIPE AND CI PIPE
SEWER. MAINS ARE TO BE CORE DRILLED.
VITRIFIED CLAY PIPE SHALL BE CUT AND HAVE A NEW TEE
SECTIONED IN.
60" ALLOWABLE MAX.
FOR CAST IRON PIPE OR
DUCTILE IRON PIPE.
1:3:5 MIX
CONCRETE
BLOCKING \� ,z5 PaGT,EevOGK
M oNCR
2% MIN SLOPE
6" SIDE OUTLET TEE HORIZONTAL
SEWER MAIN
6" MIN. SEWER MAIN
CONCRETE BLOCKING ANGLE
OF TEE AT MAIN OVER 25 ELEVATION TYPICAL SIDE SEWER ELEVATION
NOTE:
UNLESS OTHERWISE SHOWN ON PLAN. S1DE SEWER SHALL HAVE A
MINIMUM 2.5' COVER AT PROPERTY .LINE OR 3 -5' LOWER THAN THE
LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER.
NOTE:
ALL TRENCH RESTORATION SHALL BE PER
CURRENT CITY OF RENTON TRENCH
RESTORATION AND STREET OVERLAY DETAIL
BASIS OF BEARINGS
N 00'02'42" E BETWEEN THE MONUMENTS FOUND
AT THE EAST QUARTER AND THE NORTHEAST
SECTION CORNER.OF SECTION 10, TOWNSHIP 23
NORTH, RANGE 5 EAST, W.M.
DATUM
NAVD88 PER CITY OF RENTON
BENCHMARK
CITY OF RENTON POINT NO.1907, CHISELED
SQUARE IN SE CORNER CONCRETE MAILBOX BASE,
WEST SIDE' 142ND AVE SE,
OPPOSITE HOUSE NO. 12014
ELEV = 472.66 FEET.
STANDARD SIDE SEWER INSTALLATION CALL BEFORE YOU DO 1-800-424,5555
-
No SCALE RECOMMENDED CHECKED FOR COMPLIANCE
NOTE: FOR AP OVAL TO CITY STANDARDS gall
EXISTING UTILITY LOCATIONS SHOWN HEREON ARE APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S Date of
RESPONSIBILITY TO DETERMINE THE EXACT VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UNDERGROUND
UTILITIES PRIOR TO COMMENCING CONSTRUCTION. NO REPRESENTATION IS MADE THAT ALL EXISTING UTILITIES BY Date
ARE SHOWN HEREON. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR UTILITIES NOT SHOWN OR UTILITIES Date
NOT SHOWN IN THEIR PROPER LOCATION. BY
BAIMA HOLMBERG 1 ° = 20' xoN¢oN1 NID 91991 +i >b 07/28/06
JJP so CITY OF IRELAND SHORT .PLAT
°^^ TLR RENTON 811 HOOUTAM AVENUE NE
aaam DATUM
JdP
AT Hill i Z. I Planning /Building /Public Works Dept. SANITARY SEWER PLAN
ONE INCH
R s< NNE. 4 4
CD %5- 3ykk0ol
WANNY �; lllM 8 2�Clf
isi= V
1