Loading...
HomeMy WebLinkAboutS-336304M co (°T (h 1\ ELEV 42 C%j 121 INVERT 425.7 EXIST _8 WEST a z U W 0 Of ELI `fzv. JLS � 426.52E =XIST 8° _AST RT 425.851 MAIN CHANNEL (E & S) N SHALL MATCH CROWNS 2 SSMH #7 CHANNEUZATION /*-51 NO SCALE PAY LIMIT TRENCH BACKFILL 6' -0" FOR 12" SANITARY SEWER LINES 4' -0 FOR ALL WATER MAINS i 6" EXCA VA 77ON OF UNSUITABLE SOIL AND BACKFILL OF FOUNDA77ON MA7ERIAL (IF NECESSARY) DEP774 AS APPROVED BY ENGINEER. MATERIAL SHALL MEET SEC77ON 9 -03 9(1) BALLAST SAWCUT EXIS77NG ASPHALT (TYP) SAWCUT EXIS77NG ASPHALT (TYP) 6' MAX. 17' MAX. PAYLIMIT PAYLIMIT I 8° HMA \ \ \ \\ o U oU CLASS 112° Uo 4-16PG 64 -22 'M{N. - � MIN_ S FACING MW_ _ SURFACINGuTOP COURSE WATER MAIN WATER MAIN 5 f SEWER MAIN TRENCH BEDDING TRENCH BEDDING TRENCH BEDDING AND BACKFILL PAY AND BACKFILL PAY AND BACKFILL PAY LIMIT OF TRENCH LIMIT OF TRENCH LIMIT OF TRENCH EXIS77NG ASPHALT THICKNESS VARIES EXISTING ASPHALT THICKNESS VARIES WA TER MAIN TRENCH ONLY NOTES: 1. ALL TRENCHES IN ROADWAY AREAS SHALL BE BACKFILLED AND PATCHED PER SPECIAL PROVISION 5 -06.1 AT END OF EACH WORKDAY. THIS WORK IS INCIDENTAL TO ALL TRENCH RESTORATION WORK. 2. THE JOINTS FOR FINAL PATCHES SHALL BE A MINIMUM OF 1' BEYOND THE UNDISTURBED EDGE OF THE TRENCH. JOINTS SHALL BE SAW CUT AS DESCRIBED IN THE PATCH DETAILS UNLESS APPROVED BY THE ENGINEER. 3. ALL TEMPORARY PATCHES ON UTILITY TRENCHES SHALL BE PERMANENTLY PATCHED WITHIN TWO (2) WEEKS OF COMPLETION OF THE INSTALLATION OF THAT UTILITY WORK UNLESS APPROVED BY THE ENGINEER. THE ENGINEER WILL ALLOW PORTIONS OF TEMPORARY PATCHES TO REMAIN WHERE ADDITIONAL TRENCHING WILL BE REQUIRED FOR ANOTHER UTILITY. 4. THE FINAL PATCH SHALL BE 8" HMA CLASS 1/2° PG 64 -22. 5. ALL ASPHALT PATCH AREA OUTSIDE OF PAY LIMIT SHOWN SHALL BE CONSIDERED INCIDENTAL TO OTHER ITEMS OF WORK. 6. ASPHALT PATCH CONFIGURATION AT 8TH AND 10TH SHALL BE DETERMINED IN THE FIELD BY THE ENGINEER BASED UPON TRENCH I is d - 1' MIN. — 8" HMA CLASS 1/2° PG 64 -22 6° CRUSHED SURFACING TOP COURSE PARALLEL WA TER AND SEWER MAIN 7RENCHS ASPHALT CONCRETE PAVEMENT RESTORA 77ON DETAILS NTS REVISION EXISTING WATER 4't SEWER MAIN MAIN TRENCH PATCH TRENCH BEDDING AND BACKFILL PAY LIMIT OF TRENCH 6' SEWER MAIN TRENCH ONLY IA 1/2.. 1 -22 FD SE HORN v� DF WASy /2 e of `ham ss QNAL? (EXPIRES 8/21/09 I a� MAB ('ITS CITY OF DUVALL AVE NE 08 -14 -07 _ RENTON WATER/ SEWER PROJECT " DATUM JDH rror«Ee+cx Planning /Building /Public Works Dept. MISCELLANIOUS DETAILS S -3363 DATE APPR DMc / Ac a� ".a. X11 OF 11 xcutr 5 -3363 FhA ic: R -2 6�7-',-" c° r ro 0 a r N o � ran W NOTES. - SEE DETAIL FOR ASPHALT 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. CONCRET PAVEMENT RESTORATION REQUIREMENTS 2 HAND TAMP UNDER HAUNCHES 3. COMPACT PIPE ZONE MATERIAL TO 909 MINIMUM DENSITY EXCEPT DIRECTLY OVER PIPE WHERE COMPACTION WILL BE BACKFILL MATERIAL HAND TAMP ONLY NA77VE IF APPROVED BY ENGINEER OR IMPORT PER SEC77ON 9 -03.19 4. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE (SELECT BACKFILL) OF 7HE SPECIAL FLOW LINE IS MAINTAINED. PROVISIONS 5. ALL EXCAVATION AND BEDDING AND BACKFILL MATERIALS PROPOSED 12° SEWER PIPE BEYOND PAY LIMIT OF TRENCH SHALL BE INCLUDED WITHIN PROPOSED 16° WATER PIPE 7HE TRENCH EXCAVATION SAFETY SYSTEMS BID ITEM. FOR SEWER PIPE- PIPE ZONE MATERIAL PER SEC77ON 9- 0312(3) GRAVEL BACKFILL FOR PIPE ZONE BEDDING. FOR WATER PIPE PIPE ZONE MATERIAL SHALL BE NA77VE MATERIAL UNLESS DEEMED UNSUITABLE BY THE ENGINEER, 7HEN BANK RUN GRAVEL FOR ��{� �+ 7RENCH BACKRLL PER SECT70N 9 -03 19. SANITARY SEWER AND WA ER PIPES /TRENCH TYPICAL BEDDING AND BACKFILL EXCA VA 77ON OF UNSUITABLE SOIL AND BACKFILL OF FOUNDA77ON MA7ERIAL (IF NECESSARY) DEP774 AS APPROVED BY ENGINEER. MATERIAL SHALL MEET SEC77ON 9 -03 9(1) BALLAST SAWCUT EXIS77NG ASPHALT (TYP) SAWCUT EXIS77NG ASPHALT (TYP) 6' MAX. 17' MAX. PAYLIMIT PAYLIMIT I 8° HMA \ \ \ \\ o U oU CLASS 112° Uo 4-16PG 64 -22 'M{N. - � MIN_ S FACING MW_ _ SURFACINGuTOP COURSE WATER MAIN WATER MAIN 5 f SEWER MAIN TRENCH BEDDING TRENCH BEDDING TRENCH BEDDING AND BACKFILL PAY AND BACKFILL PAY AND BACKFILL PAY LIMIT OF TRENCH LIMIT OF TRENCH LIMIT OF TRENCH EXIS77NG ASPHALT THICKNESS VARIES EXISTING ASPHALT THICKNESS VARIES WA TER MAIN TRENCH ONLY NOTES: 1. ALL TRENCHES IN ROADWAY AREAS SHALL BE BACKFILLED AND PATCHED PER SPECIAL PROVISION 5 -06.1 AT END OF EACH WORKDAY. THIS WORK IS INCIDENTAL TO ALL TRENCH RESTORATION WORK. 2. THE JOINTS FOR FINAL PATCHES SHALL BE A MINIMUM OF 1' BEYOND THE UNDISTURBED EDGE OF THE TRENCH. JOINTS SHALL BE SAW CUT AS DESCRIBED IN THE PATCH DETAILS UNLESS APPROVED BY THE ENGINEER. 3. ALL TEMPORARY PATCHES ON UTILITY TRENCHES SHALL BE PERMANENTLY PATCHED WITHIN TWO (2) WEEKS OF COMPLETION OF THE INSTALLATION OF THAT UTILITY WORK UNLESS APPROVED BY THE ENGINEER. THE ENGINEER WILL ALLOW PORTIONS OF TEMPORARY PATCHES TO REMAIN WHERE ADDITIONAL TRENCHING WILL BE REQUIRED FOR ANOTHER UTILITY. 4. THE FINAL PATCH SHALL BE 8" HMA CLASS 1/2° PG 64 -22. 5. ALL ASPHALT PATCH AREA OUTSIDE OF PAY LIMIT SHOWN SHALL BE CONSIDERED INCIDENTAL TO OTHER ITEMS OF WORK. 6. ASPHALT PATCH CONFIGURATION AT 8TH AND 10TH SHALL BE DETERMINED IN THE FIELD BY THE ENGINEER BASED UPON TRENCH I is d - 1' MIN. — 8" HMA CLASS 1/2° PG 64 -22 6° CRUSHED SURFACING TOP COURSE PARALLEL WA TER AND SEWER MAIN 7RENCHS ASPHALT CONCRETE PAVEMENT RESTORA 77ON DETAILS NTS REVISION EXISTING WATER 4't SEWER MAIN MAIN TRENCH PATCH TRENCH BEDDING AND BACKFILL PAY LIMIT OF TRENCH 6' SEWER MAIN TRENCH ONLY IA 1/2.. 1 -22 FD SE HORN v� DF WASy /2 e of `ham ss QNAL? (EXPIRES 8/21/09 I a� MAB ('ITS CITY OF DUVALL AVE NE 08 -14 -07 _ RENTON WATER/ SEWER PROJECT " DATUM JDH rror«Ee+cx Planning /Building /Public Works Dept. MISCELLANIOUS DETAILS S -3363 DATE APPR DMc / Ac a� ".a. X11 OF 11 xcutr 5 -3363 FhA ic: R -2 6�7-',-" c° r ro 0 a r N o � ran W