Loading...
HomeMy WebLinkAboutS-3415070 G a N a a k t I n to AI X v z 5� 3 �1 e Y m 0 0 d Z 6 2» WJ °a° as r% ww 0= ag v F�� 066 iy ®sae V .� 0 0 °C) E-4 >_, 4 U E-4 w a 0 \ 0 m c •� c a a ma H3 0 �C z 'B' z Y ��s v w yo� 5 "MIN 24° MIN. 2 7" LD. 54" MH 54" � 5.5" MIN. 24° MIN. 24" I.D. fi0" MH w o 6° MIN. 42" MIN. COVER TO READ "SEWER" - w 6" z w cn 12,000 6,510 IN RAISED LETTERS 1,700 w O 15,100 NOTES: 5,880 3,020 10" 275 21,620 30,570 16,540 PER CITY OF RENTON TRENCH o w 250 m 1. IN UNIMPROVED AREAS POUR 1' -0" THICK 2' -D" SQUARE RESTORATION AND STREET OVERLAY 14" d 4 CONCRETE, CLASS 3000, PAD AROUND RING AND COVER. Y z RED'S 225 45,250 64,000 34,620 17,650 m o 'S 50,900 2. IN ASPHALT ROADWAYS RESTORE AROUND CLEANOUT RING 10,180 20" 200 62,840 AND COVER AS REQUIRED BY STANDARD DETAIL DRAWING BR36. 12,560 J 200 90,480 127,980 69,200 1 Z 6 2» WJ °a° as r% ww 0= ag v F�� 066 iy ®sae V .� 0 0 °C) E-4 >_, 4 U E-4 w a 0 \ 0 m c •� c a a ma H3 0 �C SURFACE RESTORATION- AS SPECIFIED MOUND 4" MIN "GRAVEL BORROW" PER - WSDOT STD SPEC 9 -03.14 COMPACT TO 90% OF MAX DENSITY BENCH AS NEEDED FOR SHORING OR TRENCH BOX (TYP) WHEN DEPTH IS 4' AND GREATER "BEDDING MATERIAL 3/4" SQUARES SPACED - 3/4" AS INDICATED - HT. 1/8 /� ❑ � _� 1/2" ❑ ❑❑ ❑❑ �- r ❑ RAISE -1/2" WIDE BORDER 1'• / SAWCUT (TYR) APPLY JOINT SEALANT AR4000W 12° TO TOP AND TACK COAT TO SIDES EXIST PAVEMENT _�� SURFACE o O O COMPACT TO 95% OF MAX SEE NOTE 1 ' DENSITY UNPAVED AREAS NOTES; MAXIMUM WIDTH OF TRENCH AT TOP OF PIPE ' 30° FOR PIPE UP TO AND INCLUDING 12° NOMINAL DIAMETER. OD PLUS 16" FOR PIPE URGER THAN 12" NOMINAL DIAMETER. WHERE TRENCH IS PERPENDICULAR TO TRAVELED LANES, BACKFILL FULL DEPTH WITH CRUSHED SURFACING -TOP COURSE. WHERE TRENCH IS PARALLEL TO TRAVELED LANES, BACKALL THE TOP 4' OF TRENCH TO SUBGRADE WITH CRUSHED SURFACING -TOP COURSE. SUITABLE EXCAVATED MATERIAL MAY BE USED PROVIDED 95% MAX. COMPACTION DENSITY CAN BE ACHIEVED. -r✓. ` 'NEAT-LINE TRENCH (TYP) WHEN DEPTH IS LESS THAN FT -�- "CRUSHED SURFACING -TOP MIN COURSE" PER WSOOT STD SPEC 9- 03.9(3). COMPACT TO 95% MAX DENSITY, SEE NOTE 2 GRAVEL BORROW" PER WSOOT STD SPEC 9-03.14. COMPACT TO 95% OF MAX DENSITY, SEE NOTE 2 PAVED AREAS NTS Utility Trench Section 5 12 "9 FIBER JC PLUG TO BE SEALED - IN SAME MANNER AS MAIN SEWER JOINTS. CONCRETE CLASS 3000 3/4" NIS Sanitary Sewer Cleanout - MANHOLE FRAME AND COVER SEE DRAWING BR29 6" (SP PAGE 8074) 12" MAX. 4" ADJUSTMENT (4" MIN.) CONE D. RUBBER GASKETED JOINTS IN ACCORDANCE WITH ASTM C -443 STEPS - 3/4° DEFORMED BAR STEPS SHALL BE INCLUDED T N. CONCRETE RISER BY PIPE INC., OR APPROVED EQUAL. 'A' --- -- 12" (TYP) MAX. PIPE SIZE - 'E' Z"�_ LADDER -STO. ALUMINUM OR GALVANIZED STEEL MORTAR FLLEi / 'Z'/-CGNCRETE SHELF 1% PRECAST BASE SECTION OR CAST IN SHELF. FA B, r, " 6" MIN. (TYP) SANITARY MANHOLE TYPICAL DETAIL NOT TO SCALE Pressure PSI 'B' z Y ��s 48" MH 48" yo� 5 "MIN 24° MIN. 2 7" LD. 54" MH 54" 8" MIN. SURFACE RESTORATION- AS SPECIFIED MOUND 4" MIN "GRAVEL BORROW" PER - WSDOT STD SPEC 9 -03.14 COMPACT TO 90% OF MAX DENSITY BENCH AS NEEDED FOR SHORING OR TRENCH BOX (TYP) WHEN DEPTH IS 4' AND GREATER "BEDDING MATERIAL 3/4" SQUARES SPACED - 3/4" AS INDICATED - HT. 1/8 /� ❑ � _� 1/2" ❑ ❑❑ ❑❑ �- r ❑ RAISE -1/2" WIDE BORDER 1'• / SAWCUT (TYR) APPLY JOINT SEALANT AR4000W 12° TO TOP AND TACK COAT TO SIDES EXIST PAVEMENT _�� SURFACE o O O COMPACT TO 95% OF MAX SEE NOTE 1 ' DENSITY UNPAVED AREAS NOTES; MAXIMUM WIDTH OF TRENCH AT TOP OF PIPE ' 30° FOR PIPE UP TO AND INCLUDING 12° NOMINAL DIAMETER. OD PLUS 16" FOR PIPE URGER THAN 12" NOMINAL DIAMETER. WHERE TRENCH IS PERPENDICULAR TO TRAVELED LANES, BACKFILL FULL DEPTH WITH CRUSHED SURFACING -TOP COURSE. WHERE TRENCH IS PARALLEL TO TRAVELED LANES, BACKALL THE TOP 4' OF TRENCH TO SUBGRADE WITH CRUSHED SURFACING -TOP COURSE. SUITABLE EXCAVATED MATERIAL MAY BE USED PROVIDED 95% MAX. COMPACTION DENSITY CAN BE ACHIEVED. -r✓. ` 'NEAT-LINE TRENCH (TYP) WHEN DEPTH IS LESS THAN FT -�- "CRUSHED SURFACING -TOP MIN COURSE" PER WSOOT STD SPEC 9- 03.9(3). COMPACT TO 95% MAX DENSITY, SEE NOTE 2 GRAVEL BORROW" PER WSOOT STD SPEC 9-03.14. COMPACT TO 95% OF MAX DENSITY, SEE NOTE 2 PAVED AREAS NTS Utility Trench Section 5 12 "9 FIBER JC PLUG TO BE SEALED - IN SAME MANNER AS MAIN SEWER JOINTS. CONCRETE CLASS 3000 3/4" NIS Sanitary Sewer Cleanout - MANHOLE FRAME AND COVER SEE DRAWING BR29 6" (SP PAGE 8074) 12" MAX. 4" ADJUSTMENT (4" MIN.) CONE D. RUBBER GASKETED JOINTS IN ACCORDANCE WITH ASTM C -443 STEPS - 3/4° DEFORMED BAR STEPS SHALL BE INCLUDED T N. CONCRETE RISER BY PIPE INC., OR APPROVED EQUAL. 'A' --- -- 12" (TYP) MAX. PIPE SIZE - 'E' Z"�_ LADDER -STO. ALUMINUM OR GALVANIZED STEEL MORTAR FLLEi / 'Z'/-CGNCRETE SHELF 1% PRECAST BASE SECTION OR CAST IN SHELF. FA B, r, " 6" MIN. (TYP) SANITARY MANHOLE TYPICAL DETAIL NOT TO SCALE Pressure PSI 'B' 'C' 'D' 22 -1/2" 48" MH 48" 6" MIN. 5 "MIN 24° MIN. 2 7" LD. 54" MH 54" 8" MIN. 5.5" MIN. 24° MIN. 24" I.D. fi0" MH 60" 8" MIN. 6° MIN. 42" MIN. 30" LD. 750 6" 300 8,500 12,000 6,510 3,320 1,700 w 300 15,100 REQUIRED PAVEMENT RESTORATION- 5,880 3,020 10" 275 21,620 30,570 16,540 PER CITY OF RENTON TRENCH 4,330 12" 250 33,930 48,000 25,950 13,260 RESTORATION AND STREET OVERLAY 14" d 46,200 M 18,030 9,240 RED'S SURFACE RESTORATION- AS SPECIFIED MOUND 4" MIN "GRAVEL BORROW" PER - WSDOT STD SPEC 9 -03.14 COMPACT TO 90% OF MAX DENSITY BENCH AS NEEDED FOR SHORING OR TRENCH BOX (TYP) WHEN DEPTH IS 4' AND GREATER "BEDDING MATERIAL 3/4" SQUARES SPACED - 3/4" AS INDICATED - HT. 1/8 /� ❑ � _� 1/2" ❑ ❑❑ ❑❑ �- r ❑ RAISE -1/2" WIDE BORDER 1'• / SAWCUT (TYR) APPLY JOINT SEALANT AR4000W 12° TO TOP AND TACK COAT TO SIDES EXIST PAVEMENT _�� SURFACE o O O COMPACT TO 95% OF MAX SEE NOTE 1 ' DENSITY UNPAVED AREAS NOTES; MAXIMUM WIDTH OF TRENCH AT TOP OF PIPE ' 30° FOR PIPE UP TO AND INCLUDING 12° NOMINAL DIAMETER. OD PLUS 16" FOR PIPE URGER THAN 12" NOMINAL DIAMETER. WHERE TRENCH IS PERPENDICULAR TO TRAVELED LANES, BACKFILL FULL DEPTH WITH CRUSHED SURFACING -TOP COURSE. WHERE TRENCH IS PARALLEL TO TRAVELED LANES, BACKALL THE TOP 4' OF TRENCH TO SUBGRADE WITH CRUSHED SURFACING -TOP COURSE. SUITABLE EXCAVATED MATERIAL MAY BE USED PROVIDED 95% MAX. COMPACTION DENSITY CAN BE ACHIEVED. -r✓. ` 'NEAT-LINE TRENCH (TYP) WHEN DEPTH IS LESS THAN FT -�- "CRUSHED SURFACING -TOP MIN COURSE" PER WSOOT STD SPEC 9- 03.9(3). COMPACT TO 95% MAX DENSITY, SEE NOTE 2 GRAVEL BORROW" PER WSOOT STD SPEC 9-03.14. COMPACT TO 95% OF MAX DENSITY, SEE NOTE 2 PAVED AREAS NTS Utility Trench Section 5 12 "9 FIBER JC PLUG TO BE SEALED - IN SAME MANNER AS MAIN SEWER JOINTS. CONCRETE CLASS 3000 3/4" NIS Sanitary Sewer Cleanout - MANHOLE FRAME AND COVER SEE DRAWING BR29 6" (SP PAGE 8074) 12" MAX. 4" ADJUSTMENT (4" MIN.) CONE D. RUBBER GASKETED JOINTS IN ACCORDANCE WITH ASTM C -443 STEPS - 3/4° DEFORMED BAR STEPS SHALL BE INCLUDED T N. CONCRETE RISER BY PIPE INC., OR APPROVED EQUAL. 'A' --- -- 12" (TYP) MAX. PIPE SIZE - 'E' Z"�_ LADDER -STO. ALUMINUM OR GALVANIZED STEEL MORTAR FLLEi / 'Z'/-CGNCRETE SHELF 1% PRECAST BASE SECTION OR CAST IN SHELF. FA B, r, " 6" MIN. (TYP) SANITARY MANHOLE TYPICAL DETAIL NOT TO SCALE NOTES: 1. STEPS TO BE 3/4° 0 DEFORMED BAR GALVANIZED SAFETY STEPS OR EQUAL. 2. STEPS ARE TO BE IN PUCE BEFORE MANHOLE SECTIONS ARE INSTALLED. 3. CASTING TO BE PER DRAWING BR29. 4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE. 5. ALL JOINTS SHALL BE GROUTED. 6. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR SURFACES, INCLUDING CHANNELING, COATED (SEALED) WITH HIGH SOLIDS URETHANE COATING; WASSER MC- AROSHIELD OR APPROVED EQUAL; COLOR OF COATING SHALL BE WHITE. 7. RUBBER GASKETED JOINTS SHALL BE IN CONFORMANCE WITH ASTM C -443, B. CHANNEL HEIGHT SHALL BE A MINIMUM OF 3/4 THE INSIDE DIAMETER OF THE LARGEST PIPE. 9. CONNECTIONS TO MANHOLE SHALL BE MADE USING GPK ADAPTOR, KOR -N -SEAL BOOTS OR APPROVED EQUAL 10. MANHOLES EQUAL TO AND GREATER THAN 20 FEET DEEP SHALL BE A MINIMUM 60" DIAMETER AND HAVE A 'SURETRACK" CLIMBING AND FALL PROTECTION SYSTEM INSTALLED. NTS Sanitary Sewer Manhole - 48.} 5- 341501 CONCRETE BLOCKING SIZING PROCEDURE A. GENERAL THE AMOUNT OF CONCRETE REQUIRED TO ANCHOR HORIZONTAL BENDS, TEES, AND DEAD ENDS DEPENDS ON THE STRENGTH OF THE SOIL THE METHODS OF PLACING CONCRETE TO KEEP THE JOINT ACCESSIBLE IS SHOWN IN FIGURE 1. THE AREA IN SQUARE FEET OF CONCRETE WHICH MUST BEAR AGAINST THE SIDE OF THE TRENCH IS FOUND BY DIVIDING THE THRUST IN POUNDS SHOWN IN TABLE 1 BY THE SAFE BEARING LOAD OF THE SOIL AS SHOWN IN TABLE 2. B. RC 1TERIA 1. THE SIZING PROCEDURE IS FOR HORIZONTAL OR DOWNWARD THRUST ONLY. 2, HEIGHT OF THE THRUST BLOCK MUST BE EQUAL TO OR LESS THAN 1/2 THE DEPTH FROM THE GROUND SURFACE TO THE BLOCK BASE. 3. THE THRUST BLOCK BEARING FACE IS APPROXIMATELY RECTANGULAR. 4. THE CONCRETE BLOCKING SHALL BE AS PER APWA SPECIFICATION 74 -2.14. C. SYMBOLS D = OUTSIDE DIAMETER OF PIPE IN FEET T = THRUST IN POUNDS AT THE FITTING (TABLE 1) SBL = SAFE BEARING LOAD IN POUNDS /SO. FT. (TABLE 2) H = DEPTH OF TRENCH IN FEET W = WIDTH OF TRENCH IN FEET A = AREA OF CONCRETE WHICH MUST BEAR AGAINST THE SIDE OF THE TRENCH IN SQ. FE HM = MAXIMUM HEIGHT OF THE THRUST BLOCK IN FEET DC = DEPTH OF THE CONCRETE THRUST BLOCK TO BEARING SURFACE IN FEET LM = MAXIMUM LENGTH OF THE THRUST BLOCK IN FEET h GROUND Hm h 2 + BLOCK BASE, I` DC VV -' D. CALCULATION EQUATIONS 1. Area of Concrete (A) = Thrust AL Pounds _ T Safe Bearing Load in Pounds Sq.. R.) SBL 2. Maximum Height of Thrust Block (Hm) = Depth of Trench m Feet =_h 2 2 (Width of Trench in Feet) - 3. Depth of Concrete Thrust Block - (Outside Diameter of Pipe in Feet) = W -d 2 2 T. Maximum Length of Thrust Block (Lm) = Area of Concrete = A Maximum Height Hm 5. Required Amount of Concrete (Cu. Yd.)_ Height x Depth x Length) x 0.03704 - Hm x Lm x Dc) x 003704 E. EXAMPLE 1. Problem: Calculation of the amount of concrete required to block a 90' bend in an 8" C.I. water main; the normal operating pressure in the pipe will be 65 psi and the soil condition in the area indicates sand and gravel. 2. Solution; -- Maximum testing pressure (See Table 1) = 300 psi. - Outside diameter of 8" pipe = 9.05 in. = 9.05/12 - Go to Table 1: The testing pressure of 300 psi, we see that the thrust on a 90' bend is 21,360 pounds. Pressure PSI 'B' 'C' 'D' 22 -1/2" 48" MH 48" 6" MIN. 5 "MIN 24° MIN. 2 7" LD. 54" MH 54" 8" MIN. 5.5" MIN. 24° MIN. 24" I.D. fi0" MH 60" 8" MIN. 6° MIN. 42" MIN. 30" LD. NOTES: 1. STEPS TO BE 3/4° 0 DEFORMED BAR GALVANIZED SAFETY STEPS OR EQUAL. 2. STEPS ARE TO BE IN PUCE BEFORE MANHOLE SECTIONS ARE INSTALLED. 3. CASTING TO BE PER DRAWING BR29. 4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE. 5. ALL JOINTS SHALL BE GROUTED. 6. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR SURFACES, INCLUDING CHANNELING, COATED (SEALED) WITH HIGH SOLIDS URETHANE COATING; WASSER MC- AROSHIELD OR APPROVED EQUAL; COLOR OF COATING SHALL BE WHITE. 7. RUBBER GASKETED JOINTS SHALL BE IN CONFORMANCE WITH ASTM C -443, B. CHANNEL HEIGHT SHALL BE A MINIMUM OF 3/4 THE INSIDE DIAMETER OF THE LARGEST PIPE. 9. CONNECTIONS TO MANHOLE SHALL BE MADE USING GPK ADAPTOR, KOR -N -SEAL BOOTS OR APPROVED EQUAL 10. MANHOLES EQUAL TO AND GREATER THAN 20 FEET DEEP SHALL BE A MINIMUM 60" DIAMETER AND HAVE A 'SURETRACK" CLIMBING AND FALL PROTECTION SYSTEM INSTALLED. NTS Sanitary Sewer Manhole - 48.} 5- 341501 CONCRETE BLOCKING SIZING PROCEDURE A. GENERAL THE AMOUNT OF CONCRETE REQUIRED TO ANCHOR HORIZONTAL BENDS, TEES, AND DEAD ENDS DEPENDS ON THE STRENGTH OF THE SOIL THE METHODS OF PLACING CONCRETE TO KEEP THE JOINT ACCESSIBLE IS SHOWN IN FIGURE 1. THE AREA IN SQUARE FEET OF CONCRETE WHICH MUST BEAR AGAINST THE SIDE OF THE TRENCH IS FOUND BY DIVIDING THE THRUST IN POUNDS SHOWN IN TABLE 1 BY THE SAFE BEARING LOAD OF THE SOIL AS SHOWN IN TABLE 2. B. RC 1TERIA 1. THE SIZING PROCEDURE IS FOR HORIZONTAL OR DOWNWARD THRUST ONLY. 2, HEIGHT OF THE THRUST BLOCK MUST BE EQUAL TO OR LESS THAN 1/2 THE DEPTH FROM THE GROUND SURFACE TO THE BLOCK BASE. 3. THE THRUST BLOCK BEARING FACE IS APPROXIMATELY RECTANGULAR. 4. THE CONCRETE BLOCKING SHALL BE AS PER APWA SPECIFICATION 74 -2.14. C. SYMBOLS D = OUTSIDE DIAMETER OF PIPE IN FEET T = THRUST IN POUNDS AT THE FITTING (TABLE 1) SBL = SAFE BEARING LOAD IN POUNDS /SO. FT. (TABLE 2) H = DEPTH OF TRENCH IN FEET W = WIDTH OF TRENCH IN FEET A = AREA OF CONCRETE WHICH MUST BEAR AGAINST THE SIDE OF THE TRENCH IN SQ. FE HM = MAXIMUM HEIGHT OF THE THRUST BLOCK IN FEET DC = DEPTH OF THE CONCRETE THRUST BLOCK TO BEARING SURFACE IN FEET LM = MAXIMUM LENGTH OF THE THRUST BLOCK IN FEET h GROUND Hm h 2 + BLOCK BASE, I` DC VV -' D. CALCULATION EQUATIONS 1. Area of Concrete (A) = Thrust AL Pounds _ T Safe Bearing Load in Pounds Sq.. R.) SBL 2. Maximum Height of Thrust Block (Hm) = Depth of Trench m Feet =_h 2 2 (Width of Trench in Feet) - 3. Depth of Concrete Thrust Block - (Outside Diameter of Pipe in Feet) = W -d 2 2 T. Maximum Length of Thrust Block (Lm) = Area of Concrete = A Maximum Height Hm 5. Required Amount of Concrete (Cu. Yd.)_ Height x Depth x Length) x 0.03704 - Hm x Lm x Dc) x 003704 E. EXAMPLE 1. Problem: Calculation of the amount of concrete required to block a 90' bend in an 8" C.I. water main; the normal operating pressure in the pipe will be 65 psi and the soil condition in the area indicates sand and gravel. 2. Solution; -- Maximum testing pressure (See Table 1) = 300 psi. - Outside diameter of 8" pipe = 9.05 in. = 9.05/12 - Go to Table 1: The testing pressure of 300 psi, we see that the thrust on a 90' bend is 21,360 pounds. CAP 22 -1/2' COUGHLIN PORTERLUNDEEN A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION 413 PINE STREET - SUITE 300 P: 206/343 -0460 SEATTLE, WA 98101 F: 206/343 -5691 TEE EXPIRES 45' BEND 1.4 N.E. 114 SEC. 25, T.23N., R.4E., W.M. - Go to Table 2: Table 2 gives the safe bearing load for sand and gravel: 3,000 lbs. /sq. ft. - Go to Figure 1: figure 1 indicates the position of the concrete for blocking the 90' bend. - Go to the specifications of the project and find depth of trench (h) = 4 feet -Width of trench (W) = 3 feet With the above assembled information, we proceed to the final calculations: - Area of Concrete (A) = Thrust = 7.1 360= 7,12 sq ft. Safe Bearing Load 3,000 Depth of Trench is Feet 2 - Maximum Height of Thrust Block (Hm) _ h =4= 2,0 ft. 2 2 Depth of Concrete Thrust Block (Oc) Width of Trench in Feet fW) - Outside Diameter of Pioe (d =3:- 0.75= 1.13 ft. 2 2 Area of Concrete - Maximum Length of Thrust Block (Lm) _ Height of Concrete A = 7.12 =3.56 ft. Hm 2.D - Required Amount of Concrete = Height x Depth x Length) x 0.03704 = To x Lou x Dc) x 0.03704 = 2.0 x 3.56 x 1.13) x 0.03704 = 0.30 cu. yd. TABLE 1 Size Pressure PSI -EA Tees 99 45' 22 -1/2" CAP 22 -1/2' COUGHLIN PORTERLUNDEEN A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION 413 PINE STREET - SUITE 300 P: 206/343 -0460 SEATTLE, WA 98101 F: 206/343 -5691 TEE EXPIRES 45' BEND 1.4 N.E. 114 SEC. 25, T.23N., R.4E., W.M. - Go to Table 2: Table 2 gives the safe bearing load for sand and gravel: 3,000 lbs. /sq. ft. - Go to Figure 1: figure 1 indicates the position of the concrete for blocking the 90' bend. - Go to the specifications of the project and find depth of trench (h) = 4 feet -Width of trench (W) = 3 feet With the above assembled information, we proceed to the final calculations: - Area of Concrete (A) = Thrust = 7.1 360= 7,12 sq ft. Safe Bearing Load 3,000 Depth of Trench is Feet 2 - Maximum Height of Thrust Block (Hm) _ h =4= 2,0 ft. 2 2 Depth of Concrete Thrust Block (Oc) Width of Trench in Feet fW) - Outside Diameter of Pioe (d =3:- 0.75= 1.13 ft. 2 2 Area of Concrete - Maximum Length of Thrust Block (Lm) _ Height of Concrete A = 7.12 =3.56 ft. Hm 2.D - Required Amount of Concrete = Height x Depth x Length) x 0.03704 = To x Lou x Dc) x 0.03704 = 2.0 x 3.56 x 1.13) x 0.03704 = 0.30 cu. yd. TABLE 1 Size Pressure PSI Thrust at Fittings in Pounds Tees 99 45' 22 -1/2" 11 -1/4" cover over the pipe exceeds 2 feet. Dead Ends Bend Bend Bend Bend 3" 300 2,120 3,000 1,630 830 430 4° 300 3,780 5,370 2,910 1,470 750 6" 300 8,500 12,000 6,510 3,320 1,700 B" 300 15,100 21,360 11,550 5,880 3,020 10" 275 21,620 30,570 16,540 8,430 4,330 12" 250 33,930 48,000 25,950 13,260 6,780 14" 250 46,200 65,370 35,340 18,030 9,240 16" 225 45,250 64,000 34,620 17,650 9,050 18" 200 50,900 72,000 38,940 19,860 10,180 20" 200 62,840 88,900 48,080 24,520 12,560 24" 200 90,480 127,980 69,200 35,320 18,100 30" 200 141,370 199,960 108,150 55,140 28,280 36" 200 203,580 1 287,950 1 155,740 79,400 1 40,720 TABLE 2 Safe Bearing Loads in Lb./Sq. Ft. The safe bearing loads given in the following table are for horizontal thrusts when the depth of cover over the pipe exceeds 2 feet. Safe Bearing Load SOIL Lb per SQ. Ft 'Muck, peat, etc. 0 Soft Clay 1,000 Send 2,000 Sand and Gravel 3,000 Bond and Gravel Cemented with Clay 4,000 Hord Shale 10,000 "in muck or peat, all thrusts shall be restrained by piles or tie rods to solid foundations or by removal of muck or peat and replacement with ballast of sufficient stability to resist thrusts. 44L3 11 -i/4' FIGURE i NOTE: FOR CONVEX VERTICAL BENDS BLOCKING SEE APWA STANDARD PLAN NO. 73. I Western Washington DPC Renton, We WATER AND SEWER DETAILS RS Concrete Blocking Sizing Procedure Checked for Compliance to City Standards SHEET X3.11