Loading...
HomeMy WebLinkAboutS-341802Myy> 0 E 1 4 � h a' I-- i I- WITHIN THE SW 1/4 SEC 11, T 23 N, R 5 E, WM m ! I N I n CONNECT TO EXISTING SSMH PER C.O.R. ST0.5 - - I I VII STA 1- 0487501'RT(THIS PROJECT)_ �` _ - STA 2 +37, S RT (C.O.R PROJECT NO.53327) = F rn SPACE ON WEST FACE n CONTRACTOR SHALL POTHOLEAND VtR1FY 0l SHIN - 1_L PRIOR TO CONSTRUCTION NOP.FYENGMEERAT.'D ' _ OF POWER POLE UP 7.0' Z CITY IF OTHER THAN SHOWN ON THESE DRAWINGS. ((� -- - ;. I = I II EL 518.97' (� Z H - CL z O I 6 °1E= 5122' 6 ' 1E=1�123 6'IE =5724 i 6 'IE =5131' SAWCUT LI i \ NE (IYPJ .. LLJ =-•ljC 0'. _ OP -OT � OP OT P U GP -OT o X --I( -� I O,. 111 -.()T' OP -❑ UP -PT- W LLJ _ .. .._ —5_ '�� SL- .._.__. ... SC, S SD `S S 5., —SD Sly --- � - S S 5�7— L1) ___ Of (n I I STA 1+00.00 BASIS OF STATIONING '.\ `. - \m . \ •\ \, ��, \ \ \�` - \� \ �\ \� •\ ® \\ T� \ -' \ \m \ j. \ ...\ V :..��E \\ \ y w CINTERSECTION NE 6TH ST(SE 124TH ST) 1 \� \\ \ \• \ \ ` \ E\ �\ s155M AVE SE v v a wy- �� v �� ` \' �� v'w a �v4 au v _ _ -- I i •��C \ J, I� �`cs \ `\ \ \_'�� \\ \\ \\ \_\ a...�.•. \\ '�\ \ \ \ �_ \�L� ,\ iR \may LLJ ry e Q \ Q n iQ SSMH # 1 _ I STA. 4+50.23,5.00- RT. - -� I- SIDE S GRAVEL IN ND (TYP.) EWER Q 2 %MIN. KIND 6 "IE= 571.9' p PER DETAIL,SHELTT3. (71'P.) 6 "IE 51 f.5' 6 °IE =511.5 RESTORE THE TRENCH WITH _ ? 5 - MINIMUM OF 6.5 INCHES OF CRUSHED SURFACING MATERIAL AND HMA THE ® ®® I SAME THICKNESS AS ME EXISTING NOTE. F7- 1 2411 ASPHALTPAVEMENT ORA MINIMUM OF FILL AND COMPACT w A ! Plt:nq,�O`; 21NCHES, WHICHEVER IS THE GREATER ROADWA t Y PRISM PRIOR TO CC ,IIG PAVEMENT SHALL THEN BE OVERLAID EXCAVATION FOR THE FULL WIDTH WITH MINIMUM OF I.5 SANITARY SEWER. 0 a a 0 i 0 i — / V 03 1 mm iws 'T T SHADOW AVE NE 14 1 moll 5-1 ST Q- �� a M =1 II a y= :tl cI _ 3 -ate T D. a 525 o_ m 520 515 z 510 >O W —j -- ----1520 I - - 505 INCHES COMPACTED HMA AY AV GRAPHIC SCALE 20 U 10 20 I" = 20' 'a NE 10TH ST IlSE 116TH S<) W N �SE 124TH ST) a COALFIELD PARK 30 5 t JO NE 4-ST w BE 128TH ST) w VICINITY MAP (NOT TO SCALE) BENCHMARKAND DATUM." VERTICAL DATUM. NAVD'88 ELEVATION.' 167.01' TEMPORARYBENCHMARK.' RAILROAD SPIKE UP 1.0'ON THE WEST SIDE OF POWER POLELOCATED AT THE SOUTHWEST CORNER OF LOT 3. ELEVATION: 136.04' I., Call 2 Working Days Before You Dig 1 -800 -424 -5555 Utilities Underground Location Center ID MT ND OR,WA CAUTION: LOCATION OF EXISTING UTILITIES SHOWN IS APPROMMATE AND MAY NOT BE ACCURATE ORALLINCLUSNE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY LOCATION AND DEPTH OF LMUT E' PRIOR TO PROCEEDING WITH CONSTRUCTION. SURVEY NOTE: EXISTING SURVEY FEATURES, BOUNDARY AND TOPOGRAPHIC DATA SHOWN ON THESE DRAWINGS HAS BEEN PREPARED, IN PART, BASED UPON INFORMATION FURNISHED BY OTHERS: WHILE. THIS INFORMATION IS BELIEVED TO BE RELIABLE ME CANNOT ENSURE THE ACCURACY AND THUS IS NOT RESPONSIBLE FOR THE ACCURACY OF THAT INFORMATION OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO THESE DRAWINGS AS A RESULT. 525 t JO —j -- ----1520 I - - -- 04 — — — , f -- - - - -�— —�� __. - - --i 515 8 342 �BroNeL � I Zsclbl ' _ 2170 i EXPIRES 07/14/08 1-95 6 "I E50Z87 - JC S S= 0.0858 S I T 510 1 I I RECOMMENDED FOR APPROVAL 1 +g8, s•IE59765 2.1 6 "IE508.36 SSMH #1 HISPROJEC BY , y 3OcJ a7 STA. 4 +5023 5.00'RT 1.505 RIM c fE /0UD -- 508-54 {N) BYj�+✓�� 16 Q By DA . BY DATE. 3 +00 4 +00 5 +00 BY DATE., 155TH AVE. SE SCALE: V= 20' HORIZ. IMAM BY DATE 1" = 5' VERT. SS1HC1001 NAVD '88 S1fT 2 OF 4 C01534180Z , Mow °a4:1'LetiT PR _ � r - - -}