Loading...
HomeMy WebLinkAboutS-3418040 3 a z 0 z w w cn J � Q iaJ �- 3: W W Ln (n w J cn w CD Ire In @'9 ra �a milli M2 S� 4$ � �? O 5= V) Z �o� • • • BACKFILL MATERIAL W (SEE (SEE NOTE 5) t!!!!1!♦ ♦!.!!!!!. ................ ............l.... CONCRETE Oi!!i!i!ili�� �!QOJilOOi DESIGN) (SEE NOTE 8) -OUNDATION LEVEL (CLASS A NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL 2. HAND TAMP UNDER HAUNCHES. 3. COMPACT BEDDING MATERIAL TO 957 MAX. DENSITY EXCEPT DIRECTLY OVER PIPE. HAND TAMP ONLY. 4. SEE "EXCAVATION AND PREPARATION OF TRENCH" IN THE SANITARY SEWERS SECTION OF THE STANDARD SPECIFICTATIONS FOR TRENCH WIDTH "W"• AND TRENCHING OPTIONS. THE PIPE ZONE WILL BE THE ACTUAL TRENCH WIDTH. EXCEPT FOR CLASS A BEDDING. THE MINIMUM CONCRETE WIDTH SHALL BE 1 -1/2 I.D. + 18••. W (SEE NOTE 4) LIMITS OF PIPE ZONE 5. TRENCH BACKFILL SHALL CONFORM TO "BACKFIWNG SEWER TRENCHES' IN THE SANITARY SEWERS SECTION OF THE STANDARD SPECIFICAiI0N5, EXCEPT THAT ROCKS BACKFILL MATERIAL OR LUMPS LARGER THAN 1" PER FOOT OF PIPE DIAMETER SHALL NOT BE USED IN THE (SEE NOTE 5) BACKFILL MATERIAL. BEDDING MATERIAL 6. SEE "BEDDING MATERIAL FOR RIGID PIPE" IN THE AGGREGATES SECTION OF THE FOR RIGID PIPE STANDARD SPECIFICATIONS FOR THE MATERIAL SPECIFICATIONS_ C I (SEE NOTE 6) L 7. SEE "BEDDING MATERIAL FOR FLEXIBLE PIPE" IN THE AGGREGATES SECTIO< B STANDARD SPECIFICATION FOR THE MATERIAL SPECIFICATIONS. FOUNDATION LEVEL r 8. PIPE MUST BE ANCHORED IN SUCH A MANER AS TO ENSURE FLOW LINE IS MAINTAINED. (CLASS B, C, D, DESIGN) BEDDING FOR RIGID PIPE W (SEE NOTE 4) LIMITS OF PIPE ZONE T.' 0., BEDDING MATERIAL FOR FI FXIBLE PIPE iJ e (SEE NOTE 7) FOUNDATION LEVEL A (CLASS F DESIGN) BEDDING FOR FLEXIBLE PIPE PIPEBEDDING FOR SANITARY SEWER NOT TO SCALE (CO.R. STD. DETAIL 8077) BEDDING CLASS DESIGN DIMENSION CLASS A CLASS B I CLASS D CLASS F cn 4" MIN. 1/4 I.D. 12" MAX. 6" MIN i EL a_ ZERO n B 1/4 O.D. v. v M < a 1 3/4 O.D. 1/2 O.D. 1/8 O.D. � m F � G' y a a a 0 3 a z 0 z w w cn J � Q iaJ �- 3: W W Ln (n w J cn w CD Ire In @'9 ra �a milli M2 S� 4$ � �? O 5= V) Z �o� • • • BACKFILL MATERIAL W (SEE (SEE NOTE 5) t!!!!1!♦ ♦!.!!!!!. ................ ............l.... CONCRETE Oi!!i!i!ili�� �!QOJilOOi DESIGN) (SEE NOTE 8) -OUNDATION LEVEL (CLASS A NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL 2. HAND TAMP UNDER HAUNCHES. 3. COMPACT BEDDING MATERIAL TO 957 MAX. DENSITY EXCEPT DIRECTLY OVER PIPE. HAND TAMP ONLY. 4. SEE "EXCAVATION AND PREPARATION OF TRENCH" IN THE SANITARY SEWERS SECTION OF THE STANDARD SPECIFICTATIONS FOR TRENCH WIDTH "W"• AND TRENCHING OPTIONS. THE PIPE ZONE WILL BE THE ACTUAL TRENCH WIDTH. EXCEPT FOR CLASS A BEDDING. THE MINIMUM CONCRETE WIDTH SHALL BE 1 -1/2 I.D. + 18••. W (SEE NOTE 4) LIMITS OF PIPE ZONE 5. TRENCH BACKFILL SHALL CONFORM TO "BACKFIWNG SEWER TRENCHES' IN THE SANITARY SEWERS SECTION OF THE STANDARD SPECIFICAiI0N5, EXCEPT THAT ROCKS BACKFILL MATERIAL OR LUMPS LARGER THAN 1" PER FOOT OF PIPE DIAMETER SHALL NOT BE USED IN THE (SEE NOTE 5) BACKFILL MATERIAL. BEDDING MATERIAL 6. SEE "BEDDING MATERIAL FOR RIGID PIPE" IN THE AGGREGATES SECTION OF THE FOR RIGID PIPE STANDARD SPECIFICATIONS FOR THE MATERIAL SPECIFICATIONS_ C I (SEE NOTE 6) L 7. SEE "BEDDING MATERIAL FOR FLEXIBLE PIPE" IN THE AGGREGATES SECTIO< B STANDARD SPECIFICATION FOR THE MATERIAL SPECIFICATIONS. FOUNDATION LEVEL r 8. PIPE MUST BE ANCHORED IN SUCH A MANER AS TO ENSURE FLOW LINE IS MAINTAINED. (CLASS B, C, D, DESIGN) BEDDING FOR RIGID PIPE W (SEE NOTE 4) LIMITS OF PIPE ZONE T.' 0., BEDDING MATERIAL FOR FI FXIBLE PIPE iJ e (SEE NOTE 7) FOUNDATION LEVEL A (CLASS F DESIGN) BEDDING FOR FLEXIBLE PIPE PIPEBEDDING FOR SANITARY SEWER NOT TO SCALE (CO.R. STD. DETAIL 8077) y , • SANITARY SEWER NOTES & SPECIFICATIONS 3. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. 4. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 5. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 6. PLANS APPROVED BY THE CITY OF RENTON. PUBLIC WORKS DEPARTMENT SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS. 7. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 8. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT DRAWING OF THE SANITARY SEWER SYSTEM, WHICH HAS BEEN STAMPED AND SIGNED BY LICENSED PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR. 9. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED. 10. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAY SHALL BE BACKFILLED WITH CRUSHED ROCK AND MECHANICALLY COMPACTED. CUTS INTO THE EXISTING ASPHALT SHALL BE NEATLINE CUT WITH SAW IN A CONTINUOUS LINE. A TEMPORARY MIX PATCH MUST BE PLACED IMMEDIATELY AFTER BACKFILL AND COMPACTION. A PERMANENT HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS. 11. DATUM SHALL BE CITY OF RENTON, 1988 NAVD. 12. ALL DISTURBED AREAS SHALL BESE ,-DED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ONSITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 13. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7 OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL, TO UNIFORM GRADE 80 THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6 INCHES ABOVE AND BELOW THE PIPE. 14. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50. 15. IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 61NCHES AND MAXIMUM 12 INCHES ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. gZR J. JO oY wAS L m 3834 WOfST EXPIRES 07/14/08(/ �/ l RECOMMENDED FOR APPROVAL BY DATE.• BY DA BY DATE: BY DATE.• BY DATE: NAVD '88 SHT 4 OF e BEDDING CLASS DESIGN DIMENSION CLASS A CLASS B CLASS C CLASS D CLASS F A 4" MIN. 1/4 I.D. 12" MAX. 6" MIN 6" MIN ZERO G" MIN B 1/4 O.D. 1/2 O.D. 1/8 O.D. ZERO O.D. C 3/4 O.D. 1/2 O.D. 1/8 O.D. TO .D. — y , • SANITARY SEWER NOTES & SPECIFICATIONS 3. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. 4. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 5. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 6. PLANS APPROVED BY THE CITY OF RENTON. PUBLIC WORKS DEPARTMENT SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS. 7. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 8. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS -BUILT DRAWING OF THE SANITARY SEWER SYSTEM, WHICH HAS BEEN STAMPED AND SIGNED BY LICENSED PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR. 9. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED. 10. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAY SHALL BE BACKFILLED WITH CRUSHED ROCK AND MECHANICALLY COMPACTED. CUTS INTO THE EXISTING ASPHALT SHALL BE NEATLINE CUT WITH SAW IN A CONTINUOUS LINE. A TEMPORARY MIX PATCH MUST BE PLACED IMMEDIATELY AFTER BACKFILL AND COMPACTION. A PERMANENT HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS. 11. DATUM SHALL BE CITY OF RENTON, 1988 NAVD. 12. ALL DISTURBED AREAS SHALL BESE ,-DED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ONSITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 13. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7 OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL, TO UNIFORM GRADE 80 THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6 INCHES ABOVE AND BELOW THE PIPE. 14. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50. 15. IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 61NCHES AND MAXIMUM 12 INCHES ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. gZR J. JO oY wAS L m 3834 WOfST EXPIRES 07/14/08(/ �/ l RECOMMENDED FOR APPROVAL BY DATE.• BY DA BY DATE: BY DATE.• BY DATE: NAVD '88 SHT 4 OF e