NOTES:
1. SANDBAG SEDIMENT DAMS SHALL BE
PLACED IN DRAINAGE DITCHES 4 FEET
UPSTREAM OF THE DOWNSTREAM
CULVERTS THAT ARE ADJACENT TO
CURRENT CONSTRUCTION OR AS DIRECTED
BY THE ENGINEER /INSPECTOR.
2. SEDIMENT TRAPS SHALL BE INSPECTED
WEEKLY DURING DRY WEATHER AND DAILY
DURING WET WEATHER. SEDIMENT SHALL
BE REMOVED WEEKLY OR AT THE DIRECTION
OF THE ENGINEER /INSPECTOR.
3. SEDIMENT TRAPS SHALL BE REMOVED FROM
A DITCH ONCE THE ADJACENT CONSTRUCTION
HAS BEEN COMPLETED.
4. FILTER FABRIC FENCE SHALL BE PLACE ALONG
DRAINAGE DITCHES WHILE CONSTRUCTION IS
TAKING PLACE ADJACENT TO THEM. THESE
FENCES SHALL BE REMOVED ONCE CONSTRUCTION
ADJACENT TO THEM HAS BEEN COMPLETED.
5. CATCH BASIN "EROSION SOCKS" SHALL BE INSTALLED
IN ALL CATCH BASINS THAT ARE ADJACENT TO THE
CONSTRUCTION ZONE. THE SOCKS SHALL BE INSPECTED
WEEKLY DURING DRY WEATHER AND DAILY DURING WET
WEATHER. SOCKS SHALL BE CLEANED OR REPLACED
AT THE DIRECTION OF THE ENGINEER /INSPECTOR.
[`T A Vf'[l
FILTER FABRIC FENCE
e�r7r�
FILTER FABRIC —\
SAND BAGS FILLE
WITH PEA GRAVE
OR WASHED DRAT
EXPIRES 8/21/09
m
STAKE
REVISION
SANDBAGS SHALL BE FILLED -
WITH PEA GRAVEL OR WASHED
DRAIN ROCK.
SANDBAG SEDIMENT DAM
SHALL BE THE GREATER
OF 4 THE DEPTH OF
DITCH OR 1' DEEP (MIN.).
I,-
1 " =20'
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
4
VERTICAL NAVD 1888
HORIZONTAL• NAD 1983/1991
DATUM
INSTALL FIL TER FABRIC FENCE
(TYPICAL)
0
ct
CITY OF WHITE FENCE RANCH FlEIDBA 2008
REN TON SANITARY SEWER EXTENSION -DM NO.
Planning /Building /Public Works Dept. EROSION CONTROL PLAN S -1
s "EEC. 14 OR 15
S 1 -3432