Loading...
HomeMy WebLinkAboutS-3443021 0 A 1 Q z 0 Q U G .� F SST v NA L d► o5 CALL BEFORE YOU DIG: 4 a' Cp w �• 0 1 :,. J "� i � � ..,j _.. � S83'3841"W 173.5 ` ,� \, ZZ w IT ENTON UTILITY CONFLICT NOTE: vv r Lco co o CAUTIONS `�` �q RECOMMENDED FOR APPROVAL 3: z THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH O w ? o! v OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POT HOLING THE By: Date: z cn o a a UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. Do w o n a- THIS SHALL INCLUDE CALLING UTILITY LOCATE ® 1- 800 - 424 -5555 AND THEN POT HOLING 3 BID RELEASE AJ IH 03/31/08 m ui cn I ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY By: Date: HPG 0 Q uof, VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE 2 REVISED DRIVE —THRU AJ IH 03/18/08 DESIGNED 1/31/08 DATE FILE NO. LUA 03- 0° °- PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. RAwN CRJ CD w IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT BARGHAUSEN By: Date 1 REVISED PER CfTY COMMENT LETTER DATED 2 /19/08 AJ IH 03/10/08 HPG °o Z o CONSULTING ENGINEERS, INC. TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH - PRE- APPLICATION MEETING AJ IH 01/02/08 CHECKED. SCALE 1 =20 FIELD BOOK PAGE_ W � CONSTRUCTION. B Date No. REVISION 9Y APPR. DATE a�ROVED HPG 1 L` y' DIRECTOR OF PUBLIC WORKS SHEET C7 OF l� GIB Is �LL�