HomeMy WebLinkAboutS-3443021 0
A
1
Q
z
0
Q
U
G .�
F SST
v
NA L d► o5
CALL BEFORE YOU DIG: 4
a' Cp
w �•
0 1 :,.
J "�
i
� � ..,j _.. � S83'3841"W 173.5
` ,� \,
ZZ
w
IT ENTON
UTILITY CONFLICT NOTE: vv r Lco
co
o CAUTIONS `�` �q
RECOMMENDED FOR APPROVAL
3: z THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH O
w ? o! v OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POT HOLING THE By: Date: z cn
o a a UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION.
Do
w o n a- THIS SHALL INCLUDE CALLING UTILITY LOCATE ® 1- 800 - 424 -5555 AND THEN POT HOLING 3 BID RELEASE AJ IH 03/31/08 m
ui cn I ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY By: Date: HPG 0
Q uof, VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE 2 REVISED DRIVE —THRU AJ IH 03/18/08 DESIGNED 1/31/08
DATE FILE NO. LUA 03-
0° °- PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. RAwN CRJ CD
w IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT BARGHAUSEN By: Date 1 REVISED PER CfTY COMMENT LETTER DATED 2 /19/08 AJ IH 03/10/08 HPG °o
Z o CONSULTING ENGINEERS, INC. TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH - PRE- APPLICATION MEETING AJ IH 01/02/08 CHECKED. SCALE 1 =20 FIELD BOOK PAGE_ W �
CONSTRUCTION. B Date No. REVISION 9Y APPR. DATE a�ROVED HPG 1
L` y' DIRECTOR OF PUBLIC WORKS SHEET C7 OF
l�
GIB Is
�LL�