HomeMy WebLinkAboutS-345702s am-, 111 I SANITARY SEWER NOT PECIFICA TIONS 1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LA TEST EDITION OF THE WSD T /APWA STANDARDS AND SPECIFICA TONS 2. THE HOURS OF WORK IN THE STREET RIGHT -OF -WAY SHALL BE LIM1 TED TO 8:30 A. M. TO 3 °30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WR /TING BY THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES, PARTIAL, OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE. J. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND` CITY OF RENTON STANDARD SPECIFICATIONS. 4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE 5. A PRE - CONSTRUCTION CONFERENCE AND A 24 HOURS NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKF/LL ALL CONSTRUCTION. 6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 7 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL ,TAKE PRECEDENCE OVER ALL 0 THER PLANS 9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB S17E WHENEVER CONSTRUCTION IS IN PROGRESS 10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS- BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OF LICENSED PROFESSIONAL SURVEYOR. 11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 81 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS 13 DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S. 14. ALL DISTURBED AREAS SHALL BE SEEDED MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON —SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7- 02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE. 16, SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50. 17 IN UN— IMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND MAXIMUM 18 INCH ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. 1/2" 1/8" RAISE -112" WIDE BORDER 10" 9" 8 3/4 'J CAST IRON RING AND COVER 1" 314" SPACES SPACED -314" AS /ND/CA TED —HT. 1/8" '-) 7n 0 12"0 — FIBER JOIN T PACKING PIPE MA TERIAL AS SPECIFIED. s . s • O 1 ! � N o BY SIDE SEWER MAIN TO BUILDING SEWER DATE i DATE ?N • ° 6" SEWER PIPE �' ? o W � 6" SIDE OUTLET TEE ?, 2"X4*" STUD SERVICE A RKER s am-, 111 I SANITARY SEWER NOT PECIFICA TIONS 1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LA TEST EDITION OF THE WSD T /APWA STANDARDS AND SPECIFICA TONS 2. THE HOURS OF WORK IN THE STREET RIGHT -OF -WAY SHALL BE LIM1 TED TO 8:30 A. M. TO 3 °30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WR /TING BY THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES, PARTIAL, OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE. J. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND` CITY OF RENTON STANDARD SPECIFICATIONS. 4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE 5. A PRE - CONSTRUCTION CONFERENCE AND A 24 HOURS NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKF/LL ALL CONSTRUCTION. 6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 7 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL ,TAKE PRECEDENCE OVER ALL 0 THER PLANS 9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB S17E WHENEVER CONSTRUCTION IS IN PROGRESS 10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS- BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OF LICENSED PROFESSIONAL SURVEYOR. 11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 81 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS 13 DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S. 14. ALL DISTURBED AREAS SHALL BE SEEDED MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON —SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7- 02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE. 16, SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50. 17 IN UN— IMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND MAXIMUM 18 INCH ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. 1/2" 1/8" RAISE -112" WIDE BORDER 10" 9" 8 3/4 'J CAST IRON RING AND COVER 1" 314" SPACES SPACED -314" AS /ND/CA TED —HT. 1/8" '-) 7n 0 12"0 — FIBER JOIN T PACKING PIPE MA TERIAL AS SPECIFIED. s . s • O 1 ! � N o BY SIDE SEWER MAIN TO BUILDING SEWER DATE BY DATE ?N FUTURE ° 0 BLDG SEWER ° 6" SEWER PIPE �' ? o W � 6" SIDE OUTLET TEE ?, 2"X4*" STUD SERVICE A RKER i PAINT R PORTION WHITE w AND S TEN CI ON SIDE WORD "SE WER " WI TH 3 " HI GH a BLACK LETTERS. 6" SIDE SEWER & BUILDING SEWER PLAN ti l: J. 5 MIX NOTE: CONCRETE 60` ALLOWABLE MAX SIDE SEWER SHALL HAVE A BLOCKING FOR CAST OR MINIMUM 5' COVER AT PROPERTY UCT/LE IRON Mp,X s am-, 111 I SANITARY SEWER NOT PECIFICA TIONS 1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON UTILITY DEPARTMENT AND THE LA TEST EDITION OF THE WSD T /APWA STANDARDS AND SPECIFICA TONS 2. THE HOURS OF WORK IN THE STREET RIGHT -OF -WAY SHALL BE LIM1 TED TO 8:30 A. M. TO 3 °30 P.M. ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WR /TING BY THE DEPARTMENT OF PUBLIC WORKS AT 235 -2620. ALL STREET CLOSURES, PARTIAL, OR FULL, SHALL BE APPROVED BY THE DEPARTMENT OF PUBLIC WORKS 24 HOURS IN ADVANCE. THE POLICE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24 HOURS IN ADVANCE. J. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, LATEST EDITION (APWA) AND` CITY OF RENTON STANDARD SPECIFICATIONS. 4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE 5. A PRE - CONSTRUCTION CONFERENCE AND A 24 HOURS NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKF/LL ALL CONSTRUCTION. 6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 7 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 8. PLANS APPROVED BY THE CITY OF RENTON, PUBLIC WORKS DEPARTMENT SHALL ,TAKE PRECEDENCE OVER ALL 0 THER PLANS 9. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB S17E WHENEVER CONSTRUCTION IS IN PROGRESS 10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN AS- BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OF LICENSED PROFESSIONAL SURVEYOR. 11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 81 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND SHALL BE PER CITY OF RENTON CURRENT STANDARDS 13 DATUM SHALL BE CITY OF RENTON, U.S.C. AND G.S. 14. ALL DISTURBED AREAS SHALL BE SEEDED MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR THE PREVENTION OF ON —SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. 15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7- 02.3(1) OF THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE. 16, SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50. 17 IN UN— IMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND MAXIMUM 18 INCH ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST SLOPE IN ALL DIRECTIONS TO MATCH PAVING. 1/2" 1/8" RAISE -112" WIDE BORDER 10" 9" 8 3/4 'J CAST IRON RING AND COVER 1" 314" SPACES SPACED -314" AS /ND/CA TED —HT. 1/8" '-) 7n 0 12"0 — FIBER JOIN T PACKING PIPE MA TERIAL AS SPECIFIED. s . s • O 1 6 "MIN HORIZONTAL 6" SIDE OUTLET TEE SEWER MAIN CONC. BLOCKING ANGLE OF TEE A T MAIN OVER 25* ELEVA TION \A0 G L� o�0G�` Z25* "0G�, % MIN SLOPE HORIZ_ ON TAL TYPICAL SIDE SEWER EL E VA TI ON �-- 4 3/4" PLUG TO BE SEALED IN SAME MANNER AS MAIN SEWER JOINTS. CLEAN -OUT DETAIL EXISTING SEWER MAIN ,I__6" SIDE SEWER 6 "TES T TEE TO BE INSTALLED A T CONNECTION NO TE: MAKE TAP THROUGH CAST IRON SADDLE SECURED TO SEWER MAIN W17H STAINLESS STEEL BANDS WHEN CONNECTING NEW 'SIDE SEWERS TO EXISTING MAIN. VITRIFIED CLAY, PLAIN & REINFORCED CONCRETE, Dl & Cl PIPE SEWER MAINS ARE TO BE CORE DRILLED. SIDE E SERVICE T I Lm TYP. SEE SH TS. 15 & 16 Ir r- -'� t - il 121t.L01104 4" MIN. Z J9 11 CASTING INLAND FDRY OR EQUAL. P T#714 SEE DETAIL 5.1.4 ADJUSTMENT 4" MIN. CONE MORTAR JOINTS / 1 6 1/2" CONRETE RISER BY PIPE INC. OR APPROVED EQUAL MAX. PIPE SIZE -21 " 1. D. LADDER —STD. ALUMINUM OR GAL VANIZED STEEL. /- CONCRETE SHELF MOR TAR F LET PRECAST BASE SECTION OR CAST IN PLACE 6" MIN. I ::� �-- 6" MIN. SANITARY MANHOLE TYPICAL DETAIL (NTS) TYP. SEE SH TS. 15 & 16 NOTES: 1. STEPS TO BE 3/4" 0 DEFORMED BAR GALVANIZED SAFTEY STEPS OR EQUAL 2, STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTIONS ARE INSTALLED 3. CASTING TO BE OLYMPIC FOUNDRY MH30 WITH MH30 D/T OR EQUAL, PER DWG. BR29 4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE 5. OPENING SHOULD BE ON DOWNSTREAM SIDE, 6. ALL JOINTS SHALL BE GROUTED, 7. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR SURFACES, INCLUDING CHANNELING, COATED (SEALED) WITH A HIGH SOLIDS URETHANE COATING; WASSER MC- CONSEAL OR APPROVED EQUAL; COLOR OF COATING SHALL BE WHITE, M&I mm, BY22Z ! PROPERTY LINE DATE BY SIDE SEWER MAIN TO BUILDING SEWER DATE BY DATE FUTURE ° 0 BLDG SEWER ° 6" SEWER PIPE �' ? �c 6" SIDE OUTLET TEE ?, 2"X4*" STUD SERVICE A RKER i PAINT R PORTION WHITE w AND S TEN CI ON SIDE WORD "SE WER " WI TH 3 " HI GH a BLACK LETTERS. 6" SIDE SEWER & BUILDING SEWER PLAN 6" SIDE SEWER l: J. 5 MIX NOTE: CONCRETE 60` ALLOWABLE MAX SIDE SEWER SHALL HAVE A BLOCKING FOR CAST OR MINIMUM 5' COVER AT PROPERTY UCT/LE IRON Mp,X PIPE. LINE OR 3 -5' LOWER THAN THE 6 7MIN 4�> LOWEST HOUSE ELEVATION, WHICH- 1 25' MIN EVER IS LOWER. 6 "MIN HORIZONTAL 6" SIDE OUTLET TEE SEWER MAIN CONC. BLOCKING ANGLE OF TEE A T MAIN OVER 25* ELEVA TION \A0 G L� o�0G�` Z25* "0G�, % MIN SLOPE HORIZ_ ON TAL TYPICAL SIDE SEWER EL E VA TI ON �-- 4 3/4" PLUG TO BE SEALED IN SAME MANNER AS MAIN SEWER JOINTS. CLEAN -OUT DETAIL EXISTING SEWER MAIN ,I__6" SIDE SEWER 6 "TES T TEE TO BE INSTALLED A T CONNECTION NO TE: MAKE TAP THROUGH CAST IRON SADDLE SECURED TO SEWER MAIN W17H STAINLESS STEEL BANDS WHEN CONNECTING NEW 'SIDE SEWERS TO EXISTING MAIN. VITRIFIED CLAY, PLAIN & REINFORCED CONCRETE, Dl & Cl PIPE SEWER MAINS ARE TO BE CORE DRILLED. SIDE E SERVICE T I Lm TYP. SEE SH TS. 15 & 16 Ir r- -'� t - il 121t.L01104 4" MIN. Z J9 11 CASTING INLAND FDRY OR EQUAL. P T#714 SEE DETAIL 5.1.4 ADJUSTMENT 4" MIN. CONE MORTAR JOINTS / 1 6 1/2" CONRETE RISER BY PIPE INC. OR APPROVED EQUAL MAX. PIPE SIZE -21 " 1. D. LADDER —STD. ALUMINUM OR GAL VANIZED STEEL. /- CONCRETE SHELF MOR TAR F LET PRECAST BASE SECTION OR CAST IN PLACE 6" MIN. I ::� �-- 6" MIN. SANITARY MANHOLE TYPICAL DETAIL (NTS) TYP. SEE SH TS. 15 & 16 NOTES: 1. STEPS TO BE 3/4" 0 DEFORMED BAR GALVANIZED SAFTEY STEPS OR EQUAL 2, STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTIONS ARE INSTALLED 3. CASTING TO BE OLYMPIC FOUNDRY MH30 WITH MH30 D/T OR EQUAL, PER DWG. BR29 4. MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE 5. OPENING SHOULD BE ON DOWNSTREAM SIDE, 6. ALL JOINTS SHALL BE GROUTED, 7. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR SURFACES, INCLUDING CHANNELING, COATED (SEALED) WITH A HIGH SOLIDS URETHANE COATING; WASSER MC- CONSEAL OR APPROVED EQUAL; COLOR OF COATING SHALL BE WHITE, M&I mm, BY22Z DATE BY DATE BY DATE BY DATE BY DATE