a .. I� CONCRETE BLOCKING SIZING PROCEDURE
o 3/4" SQUARES SPACED - 3/4"
x AS INDICATED - HL 1/8" CONCRETE A GENE - Go to Table 2: Table 2 gives the safe bearing load for
o CLASS 3000 THE AMOUNT OF CONCRETE REQUIRED TO ANCHOR HORIZONTAL BENDS, sand and gravel: 3,000 lbs. /sq. ft.
w TEES, AND DEAD ENDS DEPENDS ON THE STRENGTH OF THE SOIL THE
❑ - Go to Figure 1: figure t indicates the ositi>n
a ❑ ❑ 1'_0" METHODS FIGURE PLACING CONCRETE TO KEEP THE JOINT ACCESSIBLE IS of the conete for blocking the SO bend•
❑ ❑ ❑ 1/2" SHOWN IN FIGURE t. E S AREA IN SQUARE FEET FO CONCRETE WHICH - Go to the specifications of the project and find
❑ ❑ ❑ I MUST BEAR AGAINST THE SIDE OF THE TRENCH IS FOUND BY DIVIDING ❑ ❑ ❑ �- THE THRUST IN POUNDS SHOWN IN TABLE 1 BY THE SAFE BEARING LOAD depth of trench (h) = 4 feet
❑ ❑ 1" I�- 4 -3/4" OF THE SOIL AS SHOWN IN TABLE 2. -Width of trench (W) = 3 feet
00
W w z ° 12 "6
B. CRTIERIA With the above assembled information,
� w FO z 1. THE SIZING PROCEDURE IS FOR HORIZONTAL OR DOWNWARD we proceed to the final calculations:
o COVER TO READ 'SEW RAISE -1/2" FIBER JOINT PACKING THRUST ONLY.
WIDE BORDER 2. HEIGHT OF THE THRUST BLOCK MUST BE EQUAL TO OR LESS
z = IN RAISED LETTERS THAN 7 2 THE DEPTH FROM THE GROUND SURFACE TO THE BLOCK Thrust 6
C5 0 NOTES:
1 / Area of Concrete (A) _ _Q= 7.12 sq ft.
BASF. Safe Bearing Loaf 3,000
c.o w 1. IN UNIMPROVED AREAS POUR 1' -0" THICK 2' -0" SQUARE 3. THE THRUST BLOCK BEARING FACE IS APPROXIMATELY e
z O C/) CONCRETE, CLASS 3000, PAD AROUND RING AND COVER. 10" RECTANGULAR. S P th of Tench in Feet 2
PIPE MATERIAL = PVC SDR 35 45' (1/8) BEND 4. THE CONCRETE BLOCKING SHALL BE AS PER APWA - Maximum Height of Thrust Block (Hm) _ _;h_4
z z w 2. IN ASPHALT ROADWAYS RESTORE AROUND CLEANOUT RING g" SPECIFICATION 74 -2.14. = 2.0 ft.
U a AND COVER AS REQUIRED BY STANDARD DETAIL DRAWING BR36. C. SYMBO l� 'I 2
8-3/4" D = OUTSIDE DIAMETER OF PIPE IN FEET
T = THRUST IN POUNDS AT THE FITTING (TABLE 1) - Depth of Concrete Thrust Block (De)
1 -1 /4 "� 11/2^ p" 5/8" SBL = SAFE BEARING LOAD IN POUNDS /SQ. FT. (TABLE 2) = Width of Trench in Feet (W) - Outside Dia' meter of Pipe (d)
H = DEPTH OF TRENCH IN FEET
Z € $" I �� 0 A = AREA OFF CONCRETE WHICH MUST BEAR AGAINST ° 3 - 0'2 = 1.13 ft. 2
w c $� 1 Alga of Concrete
C3 Maximum Length of Thrust Block (lm) = -,9
THE SIDE OF THE TRENCH IN SD. FT. Hpi ht of Concrete
° aLL T HM = MAXIMUM HEIGHT OF THE THRUST BLOCK IN FEET A = 7•�2 = 3.56 ft.
p DC = DEPTH OF THE CONCRETE THRUST BLOCK TO Trr 2.0
BEARING SURFACE IN FEET
ce fi 7 -3 4 _ - Required Amount of Concrete = (Height x Dnpth x Length) x 0.03704
LM = MAXIMUM LENGTH OF THE THRUST BLOCK IN FEET ((
8" �I I 6 0
x1) 00
13)
PLUG TO BE SEALED - 2.0 x 3.5 0.03704
O --�-)- IN SAME MANNER AS = 0.30 cu. yd
MAIN SEWER JOINTS. NITS
~ ° CAST IRON RING AND COVER - Santa Sealer Clean ®Ut GROUND SURFACE
_ $ ' 7 TABLE 1
�/
V <:9 TOP ELEVATION= SEE TABLE F F 1r
OILI WATER SEPARATOR NOTE h d
HOLD -DOWN o THE OIL WATER SEPARATOR SHALL BE UTILITY VAULT 577 CPS OR APPROVED EQUAL I Hm h
m o FOR COALESCING MEDIA j - p j +
o y WITH THE FOLLOWING SPECIFICATIONS:`
G4 Z m'0 ` r 1
DESIGN FLOW 0.363 CFS BLOCK BASE
3 RISERS PROJECTED PLATE AREA 590 SO FT DC
Hy ¢ (SEE TABLE) DESIGN TEMPERATURE 39' F LTV
Hz aw SPECIFIC GRAVITY OF OIL .85 gm /cc
W a o o MINIMUM OIL PARTICLE SIZE REMOVED 60 MICRONS
P4 0
c a 6" INLET _ _ _ _ � '���o 6" OUTLET DO NOT PAVE OR CAST UNTIL AFTER SEPARATOR MODULE HAS BEEN INSTALLED.
IE= SEE TABLE' = IE= (SEE TABLE) ALL WITH CLEAN WATER PRIOR TO START UP. D. CALCULATION
Area of Concrete (A)S=
( ) Th t In Pounds =1
Size
Pressure
PSI
Thrust at Fittings in Pounds
Tees
90'
45'
22 -1/2"
11 -1/4"
INLET IE
29.72
Dead Ends
Beml
Bend
Bend
Bend
3"
300
2,120
311, 00(:
1,630
830
430
4"
300
3,780
5,37(
2,910
1,470
750
6"
300
8,500
12,000
6,510
31320
1,700
8°
300
15,100
21,360
11,550
5,880
3,020
10"
275
21,620
30,510
16,540
8,430
4,330
12°
250
33,930
48,0(0
25,950
13,260
6,780
14°
250
46,200
65,310
35,340
18,030
9,240
16"
225
45,250
64,0(0
34,620
17,650
9,050
18"
200
50,900
72,0(0
38,940
19,860
10,180
20"
200
62,840
889(0
48,080
24,520
12,560
24"
200
90,480
127,980 -
69,200
35,320
18,100
30"
200
141,370
199,960
108,150
55,140
28,280
36"
200
203,580
287,150
155,740
79,400
40,720
m' E _ Safe Bearing Load In Pounds /Sq. Ft.) SBL
WITH SAMPLING TEE OIL WATER SEPARATOR SHALL BE UMY VAULT 577 CPS COALESCING PLATE STORM Depth of Trench in Feet =D.
INLET PIPE "'��� `�v BY 0THERS WATER SEPARATOR MODEL 577 -M OR APPROVED EQUAL 2. Maximum Height of Thrust Block (Hm) = 2 2 Safe Bearina Loads in Lb. /So. Ft.
o a> WITH SAMPLING TEE _ _ _ _ _ _ The safe bearing loads given in the following bible are for
s !< ®�+ C.I. water main; the normal operating pressure in the pipe will be 65 psi "In muck or peat, all thrusts shall be restrained by piles or
®g
a W ULT 577 -CPS and the soil condition in the area indicates sand and gravel. tie rods to solid foundations or by removal of muck
NTS z� SEDIMENT WEIR COALESCING MEDIA IL RETAINING `4 -1/2° or peat and replacement with ballast of suffici:nt
`r 2. / lu io . stability to resist thrusts.
BAFFLE Sand 0)l S
spar ator - Maximum testing pressure (See Table i) = 300 psi.
- Outside diameter of 8° pipe = 9.05 in. = 9.05/12
- Go to Table 1: The testing pressure of 300 psi, we see
a that the thrust on a 90' bend is 21,360 pounds.
n
s 8 °x8° VERTICAL CROSSING (MJxFL) -
1 8" BLIND FLANGE
(((1 8" BLIND FLANGE W/ 2" TAP & 2" PLUG
W/ TEMP PLUG
BLOCKING / 2° TAP &BLOW OFF a 11 -1/4' 90' BEND
w
REMOVE CLEANING 'POLY-PIG" CAP
0 22-1/7
FIGURE 1
} EXISTING 12" DI WATER I WATER NOTE: FOR CONVEX VERTICAL BENDS BLOCKING
SEE APWA STANDARD PLAN N0. 73.
AFTER ALL TESTING, CLEANING, 12 °x8" TEE (FLxFL) - -
AND DISINFECTING REMOVE TEMP 2 12° GATE VALVES (FLxMJ)
BLOCKING & BLOW OFF AND CONNECT 1 8" GATE VALVE (FLxMJ)
WITH 8" SLEEVE (MJ) & 8" SPOOL 2 12" SLEEVES (MJ)
z 2 8" SPOOLS MJ)
g 1 8" PLUG (MJJ 45' BEND .
FMAI. �TAL T DE1'AL W/ 2° TAP & TEMP BLOW OFF TEE �° G% ®�
Ckf W/ THRUST BLOCKING / TUTS B
1 rG)
MAL A Concrete Blocking Sizing Procedure
0o(
C. A� iltC$ton .School District SHEET
WAS
qoe a, Trans ortation Center
C G LI PORTERL EE P
w y �° 1
A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION
413 PINE STREET -SUITE 300 P: 2061343 -0460 26577
TUTS SEATTLE, WA 98101 F: 206/343 -5691 srER� s
z Water Testing and Connection Detail 1 '�sS70MAC 6�i ilo8 DETARS
IXRR601 /23/2010 c'p; -34590 y- S -3 S�o,3'
STORMWATER
0/W SEP
BUS WASH
0/W SEP
SERVICE BLDG
0/W SEP
TOP EL
34.85
37.27
35.90
INLET IE
29.72
28.64
30.27
OUTLET IE
29.72
28.64
30.27
RISERS
(1) 12"
(1) 18"
(3) 24"
1
(1) 12"
1 (1) 24"
s !< ®�+ C.I. water main; the normal operating pressure in the pipe will be 65 psi "In muck or peat, all thrusts shall be restrained by piles or
®g
a W ULT 577 -CPS and the soil condition in the area indicates sand and gravel. tie rods to solid foundations or by removal of muck
NTS z� SEDIMENT WEIR COALESCING MEDIA IL RETAINING `4 -1/2° or peat and replacement with ballast of suffici:nt
`r 2. / lu io . stability to resist thrusts.
BAFFLE Sand 0)l S
spar ator - Maximum testing pressure (See Table i) = 300 psi.
- Outside diameter of 8° pipe = 9.05 in. = 9.05/12
- Go to Table 1: The testing pressure of 300 psi, we see
a that the thrust on a 90' bend is 21,360 pounds.
n
s 8 °x8° VERTICAL CROSSING (MJxFL) -
1 8" BLIND FLANGE
(((1 8" BLIND FLANGE W/ 2" TAP & 2" PLUG
W/ TEMP PLUG
BLOCKING / 2° TAP &BLOW OFF a 11 -1/4' 90' BEND
w
REMOVE CLEANING 'POLY-PIG" CAP
0 22-1/7
FIGURE 1
} EXISTING 12" DI WATER I WATER NOTE: FOR CONVEX VERTICAL BENDS BLOCKING
SEE APWA STANDARD PLAN N0. 73.
AFTER ALL TESTING, CLEANING, 12 °x8" TEE (FLxFL) - -
AND DISINFECTING REMOVE TEMP 2 12° GATE VALVES (FLxMJ)
BLOCKING & BLOW OFF AND CONNECT 1 8" GATE VALVE (FLxMJ)
WITH 8" SLEEVE (MJ) & 8" SPOOL 2 12" SLEEVES (MJ)
z 2 8" SPOOLS MJ)
g 1 8" PLUG (MJJ 45' BEND .
FMAI. �TAL T DE1'AL W/ 2° TAP & TEMP BLOW OFF TEE �° G% ®�
Ckf W/ THRUST BLOCKING / TUTS B
1 rG)
MAL A Concrete Blocking Sizing Procedure
0o(
C. A� iltC$ton .School District SHEET
WAS
qoe a, Trans ortation Center
C G LI PORTERL EE P
w y �° 1
A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION
413 PINE STREET -SUITE 300 P: 2061343 -0460 26577
TUTS SEATTLE, WA 98101 F: 206/343 -5691 srER� s
z Water Testing and Connection Detail 1 '�sS70MAC 6�i ilo8 DETARS
IXRR601 /23/2010 c'p; -34590 y- S -3 S�o,3'
(Width of Trench in Feet) -
(Outside Diameter of Pipe in Feet)-W-4
horizontal thrusts when the depth of cover ova, ' the pipe
3. Depth of Concrete Thrust Block =
2 y
exceeds 2 feet.
4. Maximum Length of Thrust Block (Lm) = Area of Concrete - A
Maximum Height Nm
Sat Bearing Load
Lb per Sq. Ft.
*Muck, peat, etc.
0'.
d. - Height x Depth x Length) x 0.03704
5. Required Amount of Concrete Yd.)-
q (Cu. ( )_ �Hm
Soft Clay
Sand
LIDO
2,11DO
x Lm x Dc) x 0.03704
Sand and Gravel
3,ODO
E PLL
Sand and Gravel Cemented with Clay
4,0DO
Hard Shale
10,000
t Problem.
Calculation of the amount of concrete uired to block a 90' bend in an 8°
s !< ®�+ C.I. water main; the normal operating pressure in the pipe will be 65 psi "In muck or peat, all thrusts shall be restrained by piles or
®g
a W ULT 577 -CPS and the soil condition in the area indicates sand and gravel. tie rods to solid foundations or by removal of muck
NTS z� SEDIMENT WEIR COALESCING MEDIA IL RETAINING `4 -1/2° or peat and replacement with ballast of suffici:nt
`r 2. / lu io . stability to resist thrusts.
BAFFLE Sand 0)l S
spar ator - Maximum testing pressure (See Table i) = 300 psi.
- Outside diameter of 8° pipe = 9.05 in. = 9.05/12
- Go to Table 1: The testing pressure of 300 psi, we see
a that the thrust on a 90' bend is 21,360 pounds.
n
s 8 °x8° VERTICAL CROSSING (MJxFL) -
1 8" BLIND FLANGE
(((1 8" BLIND FLANGE W/ 2" TAP & 2" PLUG
W/ TEMP PLUG
BLOCKING / 2° TAP &BLOW OFF a 11 -1/4' 90' BEND
w
REMOVE CLEANING 'POLY-PIG" CAP
0 22-1/7
FIGURE 1
} EXISTING 12" DI WATER I WATER NOTE: FOR CONVEX VERTICAL BENDS BLOCKING
SEE APWA STANDARD PLAN N0. 73.
AFTER ALL TESTING, CLEANING, 12 °x8" TEE (FLxFL) - -
AND DISINFECTING REMOVE TEMP 2 12° GATE VALVES (FLxMJ)
BLOCKING & BLOW OFF AND CONNECT 1 8" GATE VALVE (FLxMJ)
WITH 8" SLEEVE (MJ) & 8" SPOOL 2 12" SLEEVES (MJ)
z 2 8" SPOOLS MJ)
g 1 8" PLUG (MJJ 45' BEND .
FMAI. �TAL T DE1'AL W/ 2° TAP & TEMP BLOW OFF TEE �° G% ®�
Ckf W/ THRUST BLOCKING / TUTS B
1 rG)
MAL A Concrete Blocking Sizing Procedure
0o(
C. A� iltC$ton .School District SHEET
WAS
qoe a, Trans ortation Center
C G LI PORTERL EE P
w y �° 1
A CONSULTING STRUCTURAL AND CIVIL ENGINEERING CORPORATION
413 PINE STREET -SUITE 300 P: 2061343 -0460 26577
TUTS SEATTLE, WA 98101 F: 206/343 -5691 srER� s
z Water Testing and Connection Detail 1 '�sS70MAC 6�i ilo8 DETARS