Loading...
HomeMy WebLinkAboutS-347335NE 3 -23 -5 mr�lvn rvur I vvrvo'Rvvlr_u - ---v 1. 11P ROADWAY TO EXISTING ADD SIGN: — w---- W---- W - - - -W— ASPHALT ELEVATION. SEAL "RIGHT LANE MUST --- W- - - -w -- —W_ — JO)JJT WITH AR4000W — w--- -W - - -_ TURN RIGHT" PER TAP£R w -- 3 -7R w R 4 - -- -W- - --W—MUTCD - -W -- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ------' - --- - - - -- ---- -- - - - - -- ASP LT RAMP TRANSITIONS BET _ TOP OF SIDEWALK AND EX. GROUND AT MIN. 4:1 SLOP / SEE CDR DRIVEWAY ENTRANCE DETAIL 104.1 I I NEW TRANSFORMER J Ik N m 10 0 10 20 _I rn SCALE IN FEET i 0 0 LEGEND: 0 0 F ROAD CONSTRUCTION SAWCUT, REMOVE, AND RECONSTRUCT W 0 0 z 0 N K W a H `I FIHILL aF wASxYN�yl C� 2 7847 Q o} �1 I 1 OVERFLOW STORAGE VAULT 1 1 I iw_ LANDSCAPING I - -- I VALVE II � VAULT H I I _ i 8" HMA CLASS 1/2" PG 64 -22 000000000 6 "CSTC �— GRAVEL BORROW AS REQUIRED NILE AVE. PAVING SECTION r vQy-�01F "A$xj P 45 45274 . z Roth Hill, LLC Te1425.869.9448 www. rothhill .corrl�F��E'CISTERF'�NZC�'�F�; �'crsTERw "N SSIONAL ERG SSIONAL ERG 0 11130 NE 33rd Place, Suite 200 Bellevue, WA 98004 No. REVISION a EX. DOUBLE YELLOW STRIPE SOLID WHITE LINE PER - COR DETAIL H008 w---- w-- - -W- -- — SEE COR SIDEWALK Ex WATER FAIN- - -W' -- —w -- fDETAIL F005. r6. TYP• —W--- ° • '5- TYP, h 4 ........ t.BOC=325.O P, ... .. .............. P\ TAPES PQ OS SIDEWALK TI �A MATCH NG 4'WIDE ARBOR WITH y I 5 "CE "STONEGATE SIGN° � EX. UTILITY BOX TO BE J L RELOCATED BEHIND x] SIDEWALK (SEE SHT. C7) I 1„- I w w I DOUBLE YELLOW STRIPE PROVIDE TURN =I � I ARROWS PER CDR 3 ♦ DETAIL H008 ♦ ♦ I WV(2)1 - - -- ---- w - - - I I -w — wv ' —w RDO- COM - -- MJLwnru: w,w lore AS NOTED °@°" "D1B°71B°' ii CITY OF ELB/LDS RENT 0 N MIi MM:1VW 01E °1O1 DATUM CNEp� • *wu. srx� Planning /Building /Public Works Dept. P xo* o"c rsx BY �' I ♦ i ♦ � 0 0/ Jr RS' S� ♦ a ♦ ♦ ♦ 't ay wasq\ 2 37947 FOR CONSTRUCTION RECORDS ONLY REVISED TO INDICATE CONSTRUCTION RECORDS REVISED BY: TERRY VAN WECHEL DATE: JULY 20, 2012 CONTRACTOR: SHORELINE CONSTRUCTION THESE CONSTRUCTION RECORD DOCUMENTS HAVE BEEN PREPARED BY ROTH HILL, LLC. MOST FIELD INFORMATION PROVIDED BY OTHERS. ROTH HILL HAS NOT VERIFIED THE ACCURACY AND/OR COMPLETENESS OF INFORMATION PROVIDED BY OTHERS AND SHALL NOT BE RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY BE INCORPORATED AS A RESULT OF ERRONEOUS INFORMATION PROVIDED BY OTHERS. STONEGATE LIFT STATION REPLACEMENT NILE AVE NE ROAD AND SIDEWALK IMPROVEMENTS AND DETAILS �rQ:S `t73� 6/25/2010 P 1101 PROVIDE TURN =I � I ARROWS PER CDR DETAIL H008 N Wi I ; Z - - -- ---- w - - - I I -w — wv ' —w � 1 I 1 11, 3 I I MJLwnru: w,w lore AS NOTED °@°" "D1B°71B°' ii CITY OF ELB/LDS RENT 0 N MIi MM:1VW 01E °1O1 DATUM CNEp� • *wu. srx� Planning /Building /Public Works Dept. P xo* o"c rsx BY �' I ♦ i ♦ � 0 0/ Jr RS' S� ♦ a ♦ ♦ ♦ 't ay wasq\ 2 37947 FOR CONSTRUCTION RECORDS ONLY REVISED TO INDICATE CONSTRUCTION RECORDS REVISED BY: TERRY VAN WECHEL DATE: JULY 20, 2012 CONTRACTOR: SHORELINE CONSTRUCTION THESE CONSTRUCTION RECORD DOCUMENTS HAVE BEEN PREPARED BY ROTH HILL, LLC. MOST FIELD INFORMATION PROVIDED BY OTHERS. ROTH HILL HAS NOT VERIFIED THE ACCURACY AND/OR COMPLETENESS OF INFORMATION PROVIDED BY OTHERS AND SHALL NOT BE RESPONSIBLE FOR ANY ERRORS OR OMISSIONS THAT MAY BE INCORPORATED AS A RESULT OF ERRONEOUS INFORMATION PROVIDED BY OTHERS. STONEGATE LIFT STATION REPLACEMENT NILE AVE NE ROAD AND SIDEWALK IMPROVEMENTS AND DETAILS �rQ:S `t73� 6/25/2010 P 1101