HomeMy WebLinkAboutS-348502L.I
a
z
F-
0
Ld
O
ry
n
1 2 a
VA
MORTAR
FILLET
FFSITE SANITA,.IHY SEWE Ex i ENS ON DETAILS
JON AND KIRA HAMILTON
CITY F RENTON, KING COUN lY, WASHINGTON
MANHOLE FRAME AND COVER
SEE DRAWING BR29
(SP PAGE B074)
ADJUSTMENT (4" MIN.)
CONE
RUBBER GASKETED JOINTS IN
ACCORDANCE WITH ASTM C -443
STEPS - 3/4" DEFORMED BAR
STEPS SHALL BE INCLUDED
CONCRETE RISER BY PIPE INC.,
OR APPROVED EQUAL.
MAX. PIPE SIZE - 'E'
LADDER -STD. ALUMINUM
OR GALVANIZED STEEL
CONCRETE SHELF
PRECAST BASE SECTION
OR CAST IN SHELF.
SANITARY MANHOLE TYPICAL DETAIL
NOT TO SCALE
NOTES:
1. STEPS TO BE 3/4" 0 DEFORMED BAR GALVANIZED SAFETY STEPS OR EQUAL.
2. STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTIONS ARE INSTALLED.
3. CASTING TO BE PER DRAWING BR29.
4' MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE,
5. ALL JOINTS SHALL BE GROUTED.
6. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR SURFACES, INCLUDING CHANNELING,
COATED (SEALED) WITH A HIGH SOLIDS URETHANE COATING; WASSER MC- AROSHIELD OR
APPROVED EQUAL; COLOR OF COATING SHALL BE WHITE.
7. RUBBER GASKETED JOINTS SHALL BE IN CONFORMANCE WITH ASTM C -443.
S. CHANNEL HEIGHT SHALL BE A MINIMUM OF 3/4 THE INSIDE DIAMETER OF THE LARGEST PIPE.
9. CONNECTIONS TO MANHOLE SHALL BE MADE USING GPK ADAPTOR, KOR -N -SEAL BOOTS OR
APPROVED EQUAL.
10. MANHOLES EQUAL TO AND GREATER THAN 20 FEET DEEP SHALL BE A MINIMUM 60" DIAMETER
AND HAVE A "SURETRACK" CLIMBING AND FALL PROTECTION SYSTEM INSTALLED.
• i'
ORIENT
AND COVER
OF •
MANHOLE SANITARY SEWER
LOCATE 6.00'
AND wr 00'07'00"
OF DOT •
WA DOT
MONUMENT,
vL -CL
SPECIFY
LETTERIN
NOTES:
1. ALL COVERS SHALL BE LOCKING LID PER EAST JORDAN IRON WORKS.
INC. No. 3705 (LOCKING) OR EQUAL.
2. FRAME AND COVER SHALL BE A WATER TIGHT ASSEMBLY.
3. USE FRAME AND COVER FOR STORM (SPECIFY "DRAIN" ON COVER),
SANITARY (SPECIFY "SEWER"). OR WATER (SPECIFY "WATER ").
um
71 1
_" ®. R.:•' aye
DWG. NWE: 4 SP P 74 1
2. WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY IT IS THE CONTRACTOR'S
EXPIRES: 11 /10/09 RESPONSIBILITY TO FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY. EITHER THROUGH POTHOLING OR ALTERNATIVE METHOD. REPORT
INFORMATION TO THE ENGINEER PRIOR TO CONSTRUCTION.
NOTES: GENERAL SANITARY SEWER
1. ALL SANITARY SEWER CONSTRUCTION SHALL CONFORM TO THE CITY STANDARDS AND SPECIFICATIONS,
LATEST REVISIONS THEREOF.
2. ALL SEWER MAINS SHALL BE PVC, ASTM D -3034, SDR 35 OR APPROVED EQUAL. ALL SEWER MAIN
SIZE IS 8 INCHES IN DIAMETER UNLESS OTHERWISE NOTED.
3. SEWER RIM ELEVATIONS SHOWN ARE APPROXIMATE ONLY AND ARE NOT TO BE TAKEN AS FINAL
ELEVATIONS. RING AND COVER SHALL BE SET IN CENTERED CONCRETE RINGS WITH RAM -NECK FOR
ADJUSTMENT TO MATCH FINAL PAVEMENT ELEVATIONS.
4. THE CONTRACTOR AND SURVEY CREW SHALL VERIFY ELAVATIONS OF EXISTING SEWER LINES AND
MANHOLES TO BE TIED TO PRIOR TO CONSTRUCTION OR STAKING OF SANITARY SEWER.
5. NO UNDERDRAIN SYSTEM WILL BE ALLOWED TO BE PLACED IN MAINLINE OR SEWER SERVICE TRENCHES.
6. SEWER SERVICE TEES FOR EACH UNIT SHALL BE STAKED BY A SURVEY CREW AND FURNISHED AND
INSTALLED BY THE CONTRACTOR. THE CONTRACTOR SHALL FURNISH TO THE ENGINEER "AS
CONSTRUCTED" LOCATION OF TEES. SEWER WYES SHALL BE USED RATHER THAN TEES.
7. ALL MANHOLES SHALL BE 48- INCHES IN DIAMETER WITH 24 -INCH RING AND COVER, ECCENTRIC CONE
UNLESS OTHERWISE SPECIFIED.
8. PIPE BEDDING SHALL BE CLASS "B" AND CONFORM TO SECTION 9 -03.19 OF THE WASHINGTON STATE
DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
CONSTRUCTION, 2008, AND IN ACCORDANCE TO CITY STANDARD SPECIFICATIONS AND STANDARD DRAWING
B077.
9. ALL PIPE LENGTHS ARE APPROXIMATE.
10. THE CONTRACTOR SHALL HAVE IN HIS POSSESSION AT ALL TIMES ONE (1) SIGNED COPY OF THE PLANS
WHICH HAVE BEEN APPROVED BY THE CITY.
11. ALL MANHOLES SHALL HAVE SHAPED INVERTS.
12. ALL SEWER LINES SHALL BE TESTED IN ACCORDANCE WITH CITY STANDARDS AND SPECIFICATIONS PRIOR
TO ACCEPTANCE OR ANY CONNECTION TO AN EXISTING SEWER LINE.
A. FOUR INCHES (4 ") AT A TWO PERCENT (2X) SLOPE (1/4" PER FOOT) FOR SINGLE- FAMILY OR DUPLEX RESIDENTIAL, OR
B. SIX INCHES (6 ") AT A TWO PERCENT (27) SLOPE (1/4" PER FOOT) FOR MULTI- FAMILY, COMMERCIAL OR INDUSTRIAL.
IN NO EVENT SHALL THE DIAMETER OF THE SIDE SEWER STUB BE LESS THAN SIX INCHES (6 ").
THE UTILITY MAY ALLOW, UNDER CERTAIN CIRCUMSTANCES, A SIX INCH (6') SIDE SEWER TO BE LAID AT NO LESS THAN ONE
PERCENT (1 X) (1/8" PER FOOT). A GRADE RELEASE HOLDING THE CITY HARMLESS FOR THE FLATTER SLOPE WILL BE REQUIRED.
WHENEVER POSSIBLE, THE BUILDING SEWER SHALL BE BROUGHT TO THE BUILDING AT AN ELEVATION BELOW THE BASEMENT FLOOR.
NO BUILDING SEWER SHALL BE LAID PARALLEL TO OR WITHIN THREE FEET (3') OF ANY BEARING WALL, WHICH MIGHT THEREBY BE
WEAKENED. THE DEPTH SHALL BE SUFFICIENT TO AFFORD PROTECTION FROM FROST. THE BUILDING SEWER SHALL BE LAID AT
UNIFORM GRADE AND IN STRAIGHT ALIGNMENT INSOFAR AS POSSIBLE. CHANGES IN DIRECTION SHALL BE MADE WITH PROPER FITTINGS
PER CITY STANDARDS. THE WASTEWATER UTILITY MAY ALLOW, AT ITS DISCRETION, THE INSTALLATION OF A SIX INCH (6 ") BUILDING
SEWER PROPERLY CURVED NOT TO EXCEED ONE- HALF(1 /2) OF MANUFACTURER'S SPECIFICATIONS.
IN ALL BUILDINGS IN WHICH ANY BUILDING DRAIN IS TOO LOW TO PERMIT GRAVITY FLOW TO THE PUBLIC SEWER, SANITARY SEWAGE
CARRIED BY SUCH DRAIN SHALL BE LIFTED BY APPROVED ARTIFICIAL MEANS AND DISCHARGED TO THE BUILDING SEWER.
ALL EXCAVATIONS REQUIRED FOR THE INSTALLATION OF A BUILDING SEWER SHALL BE OPEN TRENCH WORK UNLESS OTHERWISE
APPROVED BY THE UTILITIES ENGINEER. PIPE LAYING AND BACKFILL SHALL BE PERFORMED IN ACCORDANCE WITH ASTM SPEC.
C12 -L9 AND APWA SPEC. SEC. 60 EXCEPT THAT NO BACKFILL SHALL BE PLACED UNTIL THE WORK HAS BEEN INSPECTED.
PRIOR TO THE START OF CONSTRUCTION ACTIVITIES, TELEPHONE:
425 - 430 -7203
A MINIMUM OF 24 HOURS IN ADVANCE OF REQUIRED INSPECTIONS.
INSPECTION REQUESTS FOR THE FOLLOWING WORK DAY MUST BE RECEIVED NO LATER THAN 3 :00 PM.
UPON DIALING, YOU WILL RECEIVE A RECORDED MESSAGE ASKING FOR YOUR INSPECTION REQUEST. AT THE TONE,
RELAY YOUR REQUEST INCLUDING THE FOLLOWING INFORMATION:
1. YOUR PERMIT NUMBER (IE C- 000000) OR, IN CASES OF CITY PROJECT, THE PROJECT
IDENTIFICATION. (INSPECTIONS WILL NOT BE SCHEDULED WITHOUT PROPER IDENTIFICATION).
2. LOCATION OF REQUESTED INSPECTION. (STREET ADDRESS, STREET INTERSECTION, ETC.)
3. TYPE OF INSPECTION REQUESTED. (CONCRETE, EARTHWORK, DRAINAGE, SEWER, FIELD MEETING, ETC.)
4. NAME OF PERSON TO CONTACT AND DAY -TIME PHONE NUMBER.
5. APPROXIMATE TIME OF REQUESTED INSPECTION - AM OR PM. (DUE TO A VARIABLE WORKLOAD,
INSPECTIONS CANNOT BE SCHEDULED FOR SPECIFIC HOURS. THE ONLY EXCEPTION IS INSPECTIONS
THAT REQUIRE THE SCHEDULING OF SPECIAL TESTING PERSONNEL, OBSERVING CONSULTANTS, OR
OTHER TIME - RESTRAINING FACTORS APPROVED BY THE INSPECTOR IN ADVANCE. INSPECTIONS WILL
BE SCHEDULED IN THE ORDER RECEIVED TO THE LIMIT OF AVAILABLE MAN HOURS.
NOTE: THE ONLY EXCEPTION TO THE 24 HOUR MINIMUM SCHEDULING REQUIREMENT IS IN CASES OF 81ONAFIDE
EMERGENCIES. IN CASES OF TRUE EMERGENCIES (BROKEN UTILITIES, URGENT TRAFFIC CONTROL PROBLEMS, ETC.),
TELEPHONE:
425- 430 -7200
AND ASK TO SPEAK TO THE ASSIGNED INSPECTOR (BY NAME IF POSSIBLE). AN ATTEMPT WILL BE MADE TO CONTACT
THE INSPECTOR OR, IF THAT INSPECTOR IS UNAVAILABLE, TO ASSIGN AN EMERGENCY INSPECTOR TO HANDLE THE
PROBLEM. NOTE: THIS PROCEDURE IS TO BE USED FOR REAL EMERGENCIES ONLY. YOUR FAILURE TO ADEQUATELY
SCHEDULE YOUR OPERATIONS TO ALLOW FOR ADVANCE REQUESTS DOES NOT CONSTITUTE AN EMERGENCY!!
YOU WILL BE CHARGED FOR THE INSPECTOR'S TIME IF THE PROBLEM IS NOT AN EMERGENCY!
miw CITY OF
R EN TON
Planning /Building /Public Works Dept.
a
ummil
0 -17 -08
FIELDSOOK:
PAGE:
SHEET: OF:
2 3
'A'
'B'
'C'
'D'
'E'
48" MH
48"
6" MIN.
5 "MIN
24" MIN.
21" I.D.
54" MH
54"
8" MIN.
5.5" MIN.
24" MIN.
24" I.D.
60" MH
60"
8" MIN.
6" MIN.
42" MIN.
30" I.D.
NOTES:
1. STEPS TO BE 3/4" 0 DEFORMED BAR GALVANIZED SAFETY STEPS OR EQUAL.
2. STEPS ARE TO BE IN PLACE BEFORE MANHOLE SECTIONS ARE INSTALLED.
3. CASTING TO BE PER DRAWING BR29.
4' MANHOLE SECTIONS TO BE OF REINFORCED PRECAST CONCRETE,
5. ALL JOINTS SHALL BE GROUTED.
6. SANITARY SEWER MANHOLES SHALL HAVE ALL INTERIOR SURFACES, INCLUDING CHANNELING,
COATED (SEALED) WITH A HIGH SOLIDS URETHANE COATING; WASSER MC- AROSHIELD OR
APPROVED EQUAL; COLOR OF COATING SHALL BE WHITE.
7. RUBBER GASKETED JOINTS SHALL BE IN CONFORMANCE WITH ASTM C -443.
S. CHANNEL HEIGHT SHALL BE A MINIMUM OF 3/4 THE INSIDE DIAMETER OF THE LARGEST PIPE.
9. CONNECTIONS TO MANHOLE SHALL BE MADE USING GPK ADAPTOR, KOR -N -SEAL BOOTS OR
APPROVED EQUAL.
10. MANHOLES EQUAL TO AND GREATER THAN 20 FEET DEEP SHALL BE A MINIMUM 60" DIAMETER
AND HAVE A "SURETRACK" CLIMBING AND FALL PROTECTION SYSTEM INSTALLED.
• i'
ORIENT
AND COVER
OF •
MANHOLE SANITARY SEWER
LOCATE 6.00'
AND wr 00'07'00"
OF DOT •
WA DOT
MONUMENT,
vL -CL
SPECIFY
LETTERIN
NOTES:
1. ALL COVERS SHALL BE LOCKING LID PER EAST JORDAN IRON WORKS.
INC. No. 3705 (LOCKING) OR EQUAL.
2. FRAME AND COVER SHALL BE A WATER TIGHT ASSEMBLY.
3. USE FRAME AND COVER FOR STORM (SPECIFY "DRAIN" ON COVER),
SANITARY (SPECIFY "SEWER"). OR WATER (SPECIFY "WATER ").
um
71 1
_" ®. R.:•' aye
DWG. NWE: 4 SP P 74 1
2. WHERE A PROPOSED UTILITY CROSSES AN EXISTING UTILITY IT IS THE CONTRACTOR'S
EXPIRES: 11 /10/09 RESPONSIBILITY TO FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF SUCH
EXISTING UTILITY. EITHER THROUGH POTHOLING OR ALTERNATIVE METHOD. REPORT
INFORMATION TO THE ENGINEER PRIOR TO CONSTRUCTION.
NOTES: GENERAL SANITARY SEWER
1. ALL SANITARY SEWER CONSTRUCTION SHALL CONFORM TO THE CITY STANDARDS AND SPECIFICATIONS,
LATEST REVISIONS THEREOF.
2. ALL SEWER MAINS SHALL BE PVC, ASTM D -3034, SDR 35 OR APPROVED EQUAL. ALL SEWER MAIN
SIZE IS 8 INCHES IN DIAMETER UNLESS OTHERWISE NOTED.
3. SEWER RIM ELEVATIONS SHOWN ARE APPROXIMATE ONLY AND ARE NOT TO BE TAKEN AS FINAL
ELEVATIONS. RING AND COVER SHALL BE SET IN CENTERED CONCRETE RINGS WITH RAM -NECK FOR
ADJUSTMENT TO MATCH FINAL PAVEMENT ELEVATIONS.
4. THE CONTRACTOR AND SURVEY CREW SHALL VERIFY ELAVATIONS OF EXISTING SEWER LINES AND
MANHOLES TO BE TIED TO PRIOR TO CONSTRUCTION OR STAKING OF SANITARY SEWER.
5. NO UNDERDRAIN SYSTEM WILL BE ALLOWED TO BE PLACED IN MAINLINE OR SEWER SERVICE TRENCHES.
6. SEWER SERVICE TEES FOR EACH UNIT SHALL BE STAKED BY A SURVEY CREW AND FURNISHED AND
INSTALLED BY THE CONTRACTOR. THE CONTRACTOR SHALL FURNISH TO THE ENGINEER "AS
CONSTRUCTED" LOCATION OF TEES. SEWER WYES SHALL BE USED RATHER THAN TEES.
7. ALL MANHOLES SHALL BE 48- INCHES IN DIAMETER WITH 24 -INCH RING AND COVER, ECCENTRIC CONE
UNLESS OTHERWISE SPECIFIED.
8. PIPE BEDDING SHALL BE CLASS "B" AND CONFORM TO SECTION 9 -03.19 OF THE WASHINGTON STATE
DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
CONSTRUCTION, 2008, AND IN ACCORDANCE TO CITY STANDARD SPECIFICATIONS AND STANDARD DRAWING
B077.
9. ALL PIPE LENGTHS ARE APPROXIMATE.
10. THE CONTRACTOR SHALL HAVE IN HIS POSSESSION AT ALL TIMES ONE (1) SIGNED COPY OF THE PLANS
WHICH HAVE BEEN APPROVED BY THE CITY.
11. ALL MANHOLES SHALL HAVE SHAPED INVERTS.
12. ALL SEWER LINES SHALL BE TESTED IN ACCORDANCE WITH CITY STANDARDS AND SPECIFICATIONS PRIOR
TO ACCEPTANCE OR ANY CONNECTION TO AN EXISTING SEWER LINE.
A. FOUR INCHES (4 ") AT A TWO PERCENT (2X) SLOPE (1/4" PER FOOT) FOR SINGLE- FAMILY OR DUPLEX RESIDENTIAL, OR
B. SIX INCHES (6 ") AT A TWO PERCENT (27) SLOPE (1/4" PER FOOT) FOR MULTI- FAMILY, COMMERCIAL OR INDUSTRIAL.
IN NO EVENT SHALL THE DIAMETER OF THE SIDE SEWER STUB BE LESS THAN SIX INCHES (6 ").
THE UTILITY MAY ALLOW, UNDER CERTAIN CIRCUMSTANCES, A SIX INCH (6') SIDE SEWER TO BE LAID AT NO LESS THAN ONE
PERCENT (1 X) (1/8" PER FOOT). A GRADE RELEASE HOLDING THE CITY HARMLESS FOR THE FLATTER SLOPE WILL BE REQUIRED.
WHENEVER POSSIBLE, THE BUILDING SEWER SHALL BE BROUGHT TO THE BUILDING AT AN ELEVATION BELOW THE BASEMENT FLOOR.
NO BUILDING SEWER SHALL BE LAID PARALLEL TO OR WITHIN THREE FEET (3') OF ANY BEARING WALL, WHICH MIGHT THEREBY BE
WEAKENED. THE DEPTH SHALL BE SUFFICIENT TO AFFORD PROTECTION FROM FROST. THE BUILDING SEWER SHALL BE LAID AT
UNIFORM GRADE AND IN STRAIGHT ALIGNMENT INSOFAR AS POSSIBLE. CHANGES IN DIRECTION SHALL BE MADE WITH PROPER FITTINGS
PER CITY STANDARDS. THE WASTEWATER UTILITY MAY ALLOW, AT ITS DISCRETION, THE INSTALLATION OF A SIX INCH (6 ") BUILDING
SEWER PROPERLY CURVED NOT TO EXCEED ONE- HALF(1 /2) OF MANUFACTURER'S SPECIFICATIONS.
IN ALL BUILDINGS IN WHICH ANY BUILDING DRAIN IS TOO LOW TO PERMIT GRAVITY FLOW TO THE PUBLIC SEWER, SANITARY SEWAGE
CARRIED BY SUCH DRAIN SHALL BE LIFTED BY APPROVED ARTIFICIAL MEANS AND DISCHARGED TO THE BUILDING SEWER.
ALL EXCAVATIONS REQUIRED FOR THE INSTALLATION OF A BUILDING SEWER SHALL BE OPEN TRENCH WORK UNLESS OTHERWISE
APPROVED BY THE UTILITIES ENGINEER. PIPE LAYING AND BACKFILL SHALL BE PERFORMED IN ACCORDANCE WITH ASTM SPEC.
C12 -L9 AND APWA SPEC. SEC. 60 EXCEPT THAT NO BACKFILL SHALL BE PLACED UNTIL THE WORK HAS BEEN INSPECTED.
PRIOR TO THE START OF CONSTRUCTION ACTIVITIES, TELEPHONE:
425 - 430 -7203
A MINIMUM OF 24 HOURS IN ADVANCE OF REQUIRED INSPECTIONS.
INSPECTION REQUESTS FOR THE FOLLOWING WORK DAY MUST BE RECEIVED NO LATER THAN 3 :00 PM.
UPON DIALING, YOU WILL RECEIVE A RECORDED MESSAGE ASKING FOR YOUR INSPECTION REQUEST. AT THE TONE,
RELAY YOUR REQUEST INCLUDING THE FOLLOWING INFORMATION:
1. YOUR PERMIT NUMBER (IE C- 000000) OR, IN CASES OF CITY PROJECT, THE PROJECT
IDENTIFICATION. (INSPECTIONS WILL NOT BE SCHEDULED WITHOUT PROPER IDENTIFICATION).
2. LOCATION OF REQUESTED INSPECTION. (STREET ADDRESS, STREET INTERSECTION, ETC.)
3. TYPE OF INSPECTION REQUESTED. (CONCRETE, EARTHWORK, DRAINAGE, SEWER, FIELD MEETING, ETC.)
4. NAME OF PERSON TO CONTACT AND DAY -TIME PHONE NUMBER.
5. APPROXIMATE TIME OF REQUESTED INSPECTION - AM OR PM. (DUE TO A VARIABLE WORKLOAD,
INSPECTIONS CANNOT BE SCHEDULED FOR SPECIFIC HOURS. THE ONLY EXCEPTION IS INSPECTIONS
THAT REQUIRE THE SCHEDULING OF SPECIAL TESTING PERSONNEL, OBSERVING CONSULTANTS, OR
OTHER TIME - RESTRAINING FACTORS APPROVED BY THE INSPECTOR IN ADVANCE. INSPECTIONS WILL
BE SCHEDULED IN THE ORDER RECEIVED TO THE LIMIT OF AVAILABLE MAN HOURS.
NOTE: THE ONLY EXCEPTION TO THE 24 HOUR MINIMUM SCHEDULING REQUIREMENT IS IN CASES OF 81ONAFIDE
EMERGENCIES. IN CASES OF TRUE EMERGENCIES (BROKEN UTILITIES, URGENT TRAFFIC CONTROL PROBLEMS, ETC.),
TELEPHONE:
425- 430 -7200
AND ASK TO SPEAK TO THE ASSIGNED INSPECTOR (BY NAME IF POSSIBLE). AN ATTEMPT WILL BE MADE TO CONTACT
THE INSPECTOR OR, IF THAT INSPECTOR IS UNAVAILABLE, TO ASSIGN AN EMERGENCY INSPECTOR TO HANDLE THE
PROBLEM. NOTE: THIS PROCEDURE IS TO BE USED FOR REAL EMERGENCIES ONLY. YOUR FAILURE TO ADEQUATELY
SCHEDULE YOUR OPERATIONS TO ALLOW FOR ADVANCE REQUESTS DOES NOT CONSTITUTE AN EMERGENCY!!
YOU WILL BE CHARGED FOR THE INSPECTOR'S TIME IF THE PROBLEM IS NOT AN EMERGENCY!
miw CITY OF
R EN TON
Planning /Building /Public Works Dept.
a
ummil
0 -17 -08
FIELDSOOK:
PAGE:
SHEET: OF:
2 3