SHALL PROVIDE AND INSTALL PRIMARY POWER SERVICE CONDUCTORS.
(800) 720-8052
RH2 PROJECT NO.
ESM 1 10.052
SIGNED:
01/19/11
NO.
PROPOSED SEWER
ELECTRICAL SITE PLAN
1" = 40'
REVISION
BY I DATE I APPR
rvn Irvin MLLMUVry Vr rnvrwm vnvu.
SEE PHOTO A THIS SHEET FOR MORE
INFORMATION.
PROPOSED UNDERGROUND PRIMARY POWER SERVICE.
MAINTAIN SEPARATION TO OTHER UTILITIES PER PSE
REQUIREMENTS.
INSTALL BOLLARDS AROUND TRANSFORMER AS
NECESSARY PER PSE STANDARDS AND REQUIREMENTS
FOR PROTECTION OF PAD -MOUNT TRANSFORMER.
PROPOSFO SFWFR PUMP STATION SITF. SFF
PROPOSED ELECTRICAL
BUILDING
PROPOSED STANDBY GENERATOR
EXISTING OVERHEAD
PRIMARY POWER SERVICE
APPROXIMATE LOCATION OF PROPOSED
PRIMARY POWER PULL VAULT. VAULT SHALL
BE INSTALLED PARTIALLY IN SIDEWALK AND
GRASS AREA. CONTRACTOR SHALL RESTORE
BOTH THE SIDEWALK /CURB AND GRASS AREA
TO EXISTING OR BETTER CONDITION AFTER
INSTALLATION OF PROPOSED VAULT. VAULT
LID SHALL BE FLUSH WITH SIDEWALK.
PRIMARY POWER PULL VAULT LOCATION
NO SCALE
5. 357613
ELECTRICAL NOTES
i�
1. EXISTING UTILITY POLE. PUGET SOUND ENERGY SHALL PROVIDE PRIMARY SERVICE
dz CITY OF
CONNECTION AT TOP OF POLE.
CMR
2. PROPOSED PRIMARY UNDERGROUND POWER SERVICE. CONTRACTOR SHALL PROVIDE
TRENCHING, BACKFILL AND RESTORATION PER PUGET SOUND ENERGY REQUIREMENTS.
PUGET SOUND ENERGY. SHALL PROVIDE AND INSTALL CONDUIT. PUGET SOUND ENERGY
SHALL PROVIDE AND INSTALL PRIMARY POWER SERVICE CONDUCTORS.
3. PROPOSED PAD -MOUNT TRANSFORMER. CONTRACTOR SHALL PROVIDE EXCAVATION
Mw6
AND RESTORATION FOR INSTALLATION OF TRANSFORMER VAULT AND TRANSFORMER PER
PUGET SOUND ENERGY REQUIREMENTS. PUGET SOUND ENERGY SHALL PROVIDE AND
INSTALL TRANSFORMER VAULT AND PAD -MOUNT TRANSFORMER. PUGET SOUND
DATUM
ENERGY SHALL TERMINATE CONDUCTORS ON BOTH PRIMARY AND SECONDARY SIDE OF
CNEp` '
TRANSFORMER. TRANSFORMER FRONT SHALL FACE WEST. TRANSFORMER SHALL HAVE
10' OF CLEARANCE IN FRONT OF TRANSFORMER AND 3' OF CLEARANCE ON SIDES AND
REAR OF THE TRANSFORMER.
Tp�O;
4. PROPOSED SECONDARY POWER SERVICE, CPI, . CONTRACTOR SHALL PROVIDE
TRENCHING, BACKFILL AND RESTORATION. CONTRACTOR SHALL PROVIDE AND INSTALL
CONDUITS AND CONDUCTORS FOR SECONDARY POWER SERVICE.
5. PROPOSED REDUCED BACKFLOW PREVENTER WITH INSULATED ENCLOSURE AND HEAT
TRACE CABLE.
(XXX
6. SEE DWG NO. Ell FOR CONDUIT /CONDUCTOR SCHEDULES.
ISSAQUAH SCHOOL DISTRICT 2010 -09
LIBERTY HIGH SCHOOL PUMP STATION
ELECTRICAL SITE PLAN E03
m: t3 ar:
C'. 5 - -3576 r
SHOWN
xomxOrrtu: xn ,8� ,��
`�`"
dz CITY OF
CMR
rlt RENTON
Mw6
DATUM
Planning /Building /Public Works Dept.
CNEp` '
�Ixa, __�
A,.__ l scut
IF OT WIE OKM
scut ♦croxaxrxr
Tp�O;
ISSAQUAH SCHOOL DISTRICT 2010 -09
LIBERTY HIGH SCHOOL PUMP STATION
ELECTRICAL SITE PLAN E03