Loading...
HomeMy WebLinkAboutS-357613w a z z 0 U W O a � 0_ IZ J 0 0 U (A 2 _0 cr- 2 } H W m J BOTHELL i� EAST WENATCHEE dz CITY OF TACOMA CMR BELLINGHAM E N G I N E E R S SILVERDALE PLANNERS RICHLAND SCIENTISTS SHALL PROVIDE AND INSTALL PRIMARY POWER SERVICE CONDUCTORS. (800) 720-8052 RH2 PROJECT NO. ESM 1 10.052 SIGNED: 01/19/11 NO. PROPOSED SEWER ELECTRICAL SITE PLAN 1" = 40' REVISION BY I DATE I APPR rvn Irvin MLLMUVry Vr rnvrwm vnvu. SEE PHOTO A THIS SHEET FOR MORE INFORMATION. PROPOSED UNDERGROUND PRIMARY POWER SERVICE. MAINTAIN SEPARATION TO OTHER UTILITIES PER PSE REQUIREMENTS. INSTALL BOLLARDS AROUND TRANSFORMER AS NECESSARY PER PSE STANDARDS AND REQUIREMENTS FOR PROTECTION OF PAD -MOUNT TRANSFORMER. PROPOSFO SFWFR PUMP STATION SITF. SFF PROPOSED ELECTRICAL BUILDING PROPOSED STANDBY GENERATOR EXISTING OVERHEAD PRIMARY POWER SERVICE APPROXIMATE LOCATION OF PROPOSED PRIMARY POWER PULL VAULT. VAULT SHALL BE INSTALLED PARTIALLY IN SIDEWALK AND GRASS AREA. CONTRACTOR SHALL RESTORE BOTH THE SIDEWALK /CURB AND GRASS AREA TO EXISTING OR BETTER CONDITION AFTER INSTALLATION OF PROPOSED VAULT. VAULT LID SHALL BE FLUSH WITH SIDEWALK. PRIMARY POWER PULL VAULT LOCATION NO SCALE 5. 357613 ELECTRICAL NOTES i� 1. EXISTING UTILITY POLE. PUGET SOUND ENERGY SHALL PROVIDE PRIMARY SERVICE dz CITY OF CONNECTION AT TOP OF POLE. CMR 2. PROPOSED PRIMARY UNDERGROUND POWER SERVICE. CONTRACTOR SHALL PROVIDE TRENCHING, BACKFILL AND RESTORATION PER PUGET SOUND ENERGY REQUIREMENTS. PUGET SOUND ENERGY. SHALL PROVIDE AND INSTALL CONDUIT. PUGET SOUND ENERGY SHALL PROVIDE AND INSTALL PRIMARY POWER SERVICE CONDUCTORS. 3. PROPOSED PAD -MOUNT TRANSFORMER. CONTRACTOR SHALL PROVIDE EXCAVATION Mw6 AND RESTORATION FOR INSTALLATION OF TRANSFORMER VAULT AND TRANSFORMER PER PUGET SOUND ENERGY REQUIREMENTS. PUGET SOUND ENERGY SHALL PROVIDE AND INSTALL TRANSFORMER VAULT AND PAD -MOUNT TRANSFORMER. PUGET SOUND DATUM ENERGY SHALL TERMINATE CONDUCTORS ON BOTH PRIMARY AND SECONDARY SIDE OF CNEp` ' TRANSFORMER. TRANSFORMER FRONT SHALL FACE WEST. TRANSFORMER SHALL HAVE 10' OF CLEARANCE IN FRONT OF TRANSFORMER AND 3' OF CLEARANCE ON SIDES AND REAR OF THE TRANSFORMER. Tp�O; 4. PROPOSED SECONDARY POWER SERVICE, CPI, . CONTRACTOR SHALL PROVIDE TRENCHING, BACKFILL AND RESTORATION. CONTRACTOR SHALL PROVIDE AND INSTALL CONDUITS AND CONDUCTORS FOR SECONDARY POWER SERVICE. 5. PROPOSED REDUCED BACKFLOW PREVENTER WITH INSULATED ENCLOSURE AND HEAT TRACE CABLE. (XXX 6. SEE DWG NO. Ell FOR CONDUIT /CONDUCTOR SCHEDULES. ISSAQUAH SCHOOL DISTRICT 2010 -09 LIBERTY HIGH SCHOOL PUMP STATION ELECTRICAL SITE PLAN E03 m: t3 ar: C'. 5 - -3576 r SHOWN xomxOrrtu: xn ,8� ,�� `�`" dz CITY OF CMR rlt RENTON Mw6 DATUM Planning /Building /Public Works Dept. CNEp` ' �Ixa, __� A,.__ l scut IF OT WIE OKM scut ♦croxaxrxr Tp�O; ISSAQUAH SCHOOL DISTRICT 2010 -09 LIBERTY HIGH SCHOOL PUMP STATION ELECTRICAL SITE PLAN E03 m: t3 ar: C'. 5 - -3576 r