Loading...
HomeMy WebLinkAboutS-3587090 N ul N 1�1 O a O C7 O QOO 0 ry � gz J O j �l- z Uo J W ry J O Q ° Nf 0C 0 1 E.. E--4 d c m 0) c a t=m c � v o_ 00 BACKFILL MATERIAL (SEE NOTE 5) - 1 CONCRETE CLASS C (SEE NOTE 8) FOUNDATION LEVEL- BACKFILL MATERIAL (SEE NOTE 5)- BEDDING MATERIAL FOR RIGID PIPE (SEE NOTE 6)- FOUNDATION LEVEL W (SEE NOTE 4) (CLASS A DESIGN) LIMITS OF PIPE ZONE U W (SEE NOTE 4) -J,,- LIMITS OF PIPE ZONE BEDDING FOR • OF • NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL. 2. HAND TAMP UNDER HAUNCHES. 3. COMPACT BEDDING MATERIAL TO 95% MAX. DENSITY EXCEPT DIRECTLY OVER PIPE. HAND TAMP ONLY. 4. SEE "EXCAVATION AND PREPARATION OF TRENCH" IN THE SANITARY SEWERS SECTION OF THE STANDARD SPECIFICTATIONS FOR TRENCH WIDTH "W" AND TRENCHING OPTIONS. THE PIPE ZONE WILL BE THE ACTUAL TRENCH WIDTH, EXCEPT FOR CLASS A BEDDING. THE MINIMUM CONCRETE WIDTH SHALL BE 1 -1/2 I.D. + 18 ". 5. TRENCH BACKFILL SHALL CONFORM TO "BACKFILLING SEWER TRENCHES" IN THE SANITARY SEWERS SECTION OF THE STANDARD SPECIFICATIONS, EXCEPT THAT ROCKS OR LUMPS LARGER THAN 1" PER FOOT OF PIPE DIAMETER SHALL NOT BE USED IN THE BACKFILL MATERIAL. 6. SEE "BEDDING MATERIAL FOR RIGID PIPE" IN THE AGGREGATES SECTION OF THE STANDARD SPECIFICATIONS FOR THE MATERIAL SPECIFICATIONS. 7. SEE "BEDDING MATERIAL FOR FLEXIBLE PIPE" IN THE AGGREGATES SECTION OF STANDARD SPECIFICATION FOR THE MATERIAL SPECIFICATIONS. 8. PIPE MUST BE ANCHORED IN SUCH A MANER AS TO ENSURE FLOW LINE IS MAINTAINED. BEDDING MATERIAL I * A - 4" MIN. 27" I.D. AND UNDER FOR FLEXIBLE PIPE B s" MIN. OVER 27" I.D. (SEE NOTE 7) PIPE BEDDING FOR SANITARY SEWER FOUNDATION LEVEL nAv ADOPTEitENTOx STANDARD PLANS !ri Acc c I�FCIrAI\ LS LST DATE: 4/97 BEDDING FOR FLEXIBLE PIPE BEDDING CLASS DESIGN DIMENSION CLASS A CLASS B CLASS C CLASS D CLASS F A 4" MIN. 1/41.D. 12" MAX. * * ZERO APPR' B 1/4 O.D. 1/2 O.D. 1/8 O.D. ZERO O.D. C 3/4 O.D. 1/2 O.D. 1/8 O.D. O.D. - BEDDING MATERIAL I * A - 4" MIN. 27" I.D. AND UNDER FOR FLEXIBLE PIPE B s" MIN. OVER 27" I.D. (SEE NOTE 7) PIPE BEDDING FOR SANITARY SEWER FOUNDATION LEVEL nAv ADOPTEitENTOx STANDARD PLANS !ri Acc c I�FCIrAI\ LS LST DATE: 4/97 BEDDING FOR FLEXIBLE PIPE 4-4-97 Corrected note 4 DCV DT DWG. NAME: BW18C SP PAGE: B077 2- 21-91 Revised notes, 4,5,7,& &Added note 6 Kd "" DATE REVISION BY APPR' Bob PIPE BEDDING FOR SANITARY SEWER 1' 1' 2.5' 1' 1' MIN MIN I MIN MIN - FACE OF CURB OR EDGE OF PAVEMENT 2" CLASS 'B' CENTER LINE OR LANE LINE 6.5' MIN. 1' 1' 2.5' 1' 1' MIN MIN MIN IMINIMIN VACP CLASS 'E' OR 'B' 6" CRUSHED SURFACING TOP COURSE CRUSHED ROCK, FLOWABLE FILL OR AS REQUIRED BY ENGINEER TYPICAL PATCH FOR FLEXIBLE PAVEMENT WHEN PERPENDICULAR TO ROADWAY CENTERLINE ICY p ADOPTED v0 crrx of RENTOx ,p STANDARD PLANS N I O LST DATE: 12/96 DWG. NAME: HR -23 SP PAGE: 1-1032A TYPICAL PATCH FOR FLEXIBLE PAVEMENT N.T.S. :INT'X PASCO PLACE NEME 7th PLACE STA. 37 +86.52: (NE 7th PLACE) g STA. 1 +69.45 ( PASCO PLACE :NE) PROPOSED GRADE W= __. 520 ............. . . _ _ __ __ z A S=2.52% �1 ��� „ss ,.�' 2411F, 8l RIM = 527.26 ( = IE- 520.25 8 u OUT J , CE= 520.42 6 IN 515 _ ........ .....i....................:.... _ ............. i........ ......:...................__ ..........,...... � -)...... ............................._. ol> ........_._ ............................ ............._................. ..._.....__....- ._...._.... 241 LF; 8 "SS 0 S =0.5D% �r '@S =0.50% a15" STM 8" SEWER _ _520.. . .. -• I J 1 /l. V 1 1 VT. V V V 510 7 CE 510 NE th PLA SSMH 3, 54 . SHALLOW RIM =522.4t STA. 21 +66.0 7 LT. STA. 30 F95.21 4.7 RT.: RIM= 518.38 IE= 514.08, 8 "(O1JT) �$ SSMH 1, 48 SSMH 2, 54 SHALLOW : IE= 512.77, 81.'(OUT) IE= 514.18, 8" (IN) RIM =519.6 RIM= 518:82 IE= 512.87, 8" (IN) IE =511.76, 8 »(01ST) IE= 512.37, 8 "(OUT) IE= 511.86, 8" (IN) IE= 512.47, 8" (IN) Q 30+00 31+00 32+00 33+00 34 +00 35 +00 36+00 37+00 38+00 505 505 w .......... . .............. . ........... .......... .......... .._......... . ......... _........................ _. ..... ................. .._..__... ............................... .....:_.. ........................... _. ... ........_..__.........-.......... ..... ...._.................... .................... ........... ........-._.._............ .................. ..-..._.._............_...... ...........- ................ ... I Q I ° CO #l. 6" PVC RISER JNT'X NILE AVE: NE NE 7th PLACE I - i W IRON COVER AND FRAME STA. 21 +71.09: (NILE AVE NE)i I m INT'X PASCO PLACE NE NE 7th PLACE RIM -519.4 STA. 30+00 NE 7th PLACE I 6;52 NE 7th P c, PLACE:NE STA. 37+8 LACE PASCO IE= 511.96 8 535 STA. 1 +69.45 PASCO PLACC NE , ( ) :535 520: 520 A. 0 +14.41 .(PASCO..PLACE -NE). _ ... ............................... STA, .3+33.72..(RASCO..iPhACE..NE).. .:.. <.. EX: ROAD GRADE EX. GRADE @ CL I PLAT OF WINDWOOD q q E _ _ z i AS BUILT S 3522 OSED.,.�I? DE _..,___..., 777 °. ": 530... 515... . 530.... _ ... ;.... L ........ ..... PRSF .... _ .. ... EX. C.O........:................ _ _ .. w 515EX. G RLM= 51$.85 i 2 RDE 6" PVC TEE " L- IE= 511.73, 8: 0 11 WATER 12" STORM 1 EX. .. $SW'PER PLAN S 3522 0 O _.. .:.525.. ...._. ..... ........._. .. .. ._..... . :.. .. ....._.. . ..... . . . ...... _..... _ ... _.... 525. .. ....510: ....... .. .. ........ .. .. .. ....51.0... 20 F 8 "SS @ S= 50% 285LF.�;g "SS @S =0.50% L , 1: ATION PRIOR TO 0 INVERT ELEV NOTIFY ENGINEER STINGS OF ANY UD SICCREPANCIES. 0 0 EXJ 27900D I z Q z ^.. 20LF., 8 »SS @ S= 0.50% i� oc 520 _ : o d ? 520 505. "� o ^ 905.. . 00 " . Lo ao ao 00 00 tD (D, 6 N O M m C7 prj Kj O x:00 + �:t co � Di rn 0 I N rn; DD 0) a n o o CONTRACTOR TO VERIFY N . r- 6,.: r2 I N N + �-O N N INVERT ELEVATION PRIOR TO �'n:� to Lo _ PASCO PLACE NE M Lo Co' N CONSTRUCTION, NOTIFY ENGINEER EX. SSMH 13 r N �; II II X II 11 w Q u ii _ II OF ANY DISCREPANCIES. PLAN S- 27900D 03 In a:W w NILE AVENUE NE w o w w o <n _. 515 ww . .-. . ....... .... Q .� II II. ........ - 51.5.... .........'......._..... _ __........... _. __. _........ _....._.... _._ ....................... ........tnultz.-- ._.- ..._...... I- u1..�w.w.. 0 +0o 1+00 2+00 3 +00 � �: - - 4 +00 E -5 .5 21+00 22 +00 m 22+00 1 Z 5- 358102 vertical, • 41 1 41 80 horizontal, s• 530 ,� i 530 Dateii Myl 1 e - w I: Date: Z EX.:GRADE ... \ �wwxx VJ '/ J W W 0 J 4 525 W J �g•` W 525 s M X Z 'I ^ v) O W W C� PROPOSED GRADE W= __. 520 ............. . . _ _ __ __ z A S=2.52% �1 ��� „ss ,.�' 2411F, 8l RIM = 527.26 ( = IE- 520.25 8 u OUT J , CE= 520.42 6 IN 515 _ ........ .....i....................:.... _ ............. i........ ......:...................__ ..........,...... � -)...... ............................._. ol> ........_._ ............................ ............._................. ..._.....__....- ._...._.... 241 LF; 8 "SS 0 S =0.5D% �r '@S =0.50% a15" STM 8" SEWER _ _520.. . .. -• I J 1 /l. V 1 1 VT. V V V 510 7 CE 510 NE th PLA SSMH 3, 54 . SHALLOW RIM =522.4t STA. 21 +66.0 7 LT. STA. 30 F95.21 4.7 RT.: RIM= 518.38 IE= 514.08, 8 "(O1JT) �$ SSMH 1, 48 SSMH 2, 54 SHALLOW : IE= 512.77, 81.'(OUT) IE= 514.18, 8" (IN) RIM =519.6 RIM= 518:82 IE= 512.87, 8" (IN) IE =511.76, 8 »(01ST) IE= 512.37, 8 "(OUT) IE= 511.86, 8" (IN) IE= 512.47, 8" (IN) Q 30+00 31+00 32+00 33+00 34 +00 35 +00 36+00 37+00 38+00 505 505 w .......... . .............. . ........... .......... .......... .._......... . ......... _........................ _. ..... ................. .._..__... ............................... .....:_.. ........................... _. ... ........_..__.........-.......... ..... ...._.................... .................... ........... ........-._.._............ .................. ..-..._.._............_...... ...........- ................ ... I Q I ° CO #l. 6" PVC RISER JNT'X NILE AVE: NE NE 7th PLACE I - i W IRON COVER AND FRAME STA. 21 +71.09: (NILE AVE NE)i I m INT'X PASCO PLACE NE NE 7th PLACE RIM -519.4 STA. 30+00 NE 7th PLACE I 6;52 NE 7th P c, PLACE:NE STA. 37+8 LACE PASCO IE= 511.96 8 535 STA. 1 +69.45 PASCO PLACC NE , ( ) :535 520: 520 A. 0 +14.41 .(PASCO..PLACE -NE). _ ... ............................... STA, .3+33.72..(RASCO..iPhACE..NE).. .:.. <.. EX: ROAD GRADE EX. GRADE @ CL I PLAT OF WINDWOOD q q E _ _ z i AS BUILT S 3522 OSED.,.�I? DE _..,___..., 777 °. ": 530... 515... . 530.... _ ... ;.... L ........ ..... PRSF .... _ .. ... EX. C.O........:................ _ _ .. w 515EX. G RLM= 51$.85 i 2 RDE 6" PVC TEE " L- IE= 511.73, 8: 0 11 WATER 12" STORM 1 EX. .. $SW'PER PLAN S 3522 0 O _.. .:.525.. ...._. ..... ........._. .. .. ._..... . :.. .. ....._.. . ..... . . . ...... _..... _ ... _.... 525. .. ....510: ....... .. .. ........ .. .. .. ....51.0... 20 F 8 "SS @ S= 50% 285LF.�;g "SS @S =0.50% L , 1: ATION PRIOR TO 0 INVERT ELEV NOTIFY ENGINEER STINGS OF ANY UD SICCREPANCIES. 0 0 EXJ 27900D I z Q z ^.. 20LF., 8 »SS @ S= 0.50% i� oc 520 _ : o d ? 520 505. "� o ^ 905.. . 00 " . Lo ao ao 00 00 tD (D, 6 N O M m C7 prj Kj O x:00 + �:t co � Di rn 0 I N rn; DD 0) a n o o CONTRACTOR TO VERIFY N . r- 6,.: r2 I N N + �-O N N INVERT ELEVATION PRIOR TO �'n:� to Lo _ PASCO PLACE NE M Lo Co' N CONSTRUCTION, NOTIFY ENGINEER EX. SSMH 13 r N �; II II X II 11 w Q u ii _ II OF ANY DISCREPANCIES. PLAN S- 27900D 03 In a:W w NILE AVENUE NE w o w w o <n _. 515 ww . .-. . ....... .... Q .� II II. ........ - 51.5.... .........'......._..... _ __........... _. __. _........ _....._.... _._ ....................... ........tnultz.-- ._.- ..._...... I- u1..�w.w.. 0 +0o 1+00 2+00 3 +00 � �: - - 4 +00 E -5 .5 21+00 22 +00 m 22+00 1 Z 5- 358102 vertical, • 41 1 41 80 horizontal, s• U w O Off CL c- ) W wUo a wa( ui w Z o cN a o F Q 30 .. w a W wMa o w~ V D J O DATE JOB NO. DWG NO, 0 N o r In ❑ W Q z ❑ O U) a_ Z p' LU O ❑ U U Of W a N W N Q 0 T o' O z w i m ° w Y U w U m z ❑ 0 m ❑ ❑ w z w w ❑ U 1i _, i J J Dateii Myl 1 e - � I: Date: U w O Off CL c- ) W wUo a wa( ui w Z o cN a o F Q 30 .. w a W wMa o w~ V D J O DATE JOB NO. DWG NO, 0 N o r In ❑ W Q z ❑ O U) a_ Z p' LU O ❑ U U Of W a N W N Q 0 T o' O z w i m ° w Y U w U m z ❑ 0 m ❑ ❑ w z w w ❑ U J J U) J � W \ �wwxx VJ '/ J W W J O O ry {.1. 'I ^ v) W W C� LU W v, Uz H O F- z w I- LLI LLI U U) 03/25/2011 g OF g w CIO 1 N o C" N > b 1 r a W y V � OIO