Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutT-16500BDegrees Clockwise to Typical
Attachment Point from 00 12
900
Typical Di Signal Arm
Attachment Point
- 00- - - 1800
V
v All Handholes at 1800
wy
O
Pole Orientation Angle 2700
(P.O.A.) Degrees Clockwise
from Offset Line to 00 Point
Base Plate
0
Location Station
Roa�'t'dY
POLE ORIENTATION AND ATTACHMENT DETAIL
F44F
f f
Ground Wire Pedestal G G
4 Anchor Bolt with 2 Washers 2
and 2 Nuts each. 5/8" x 18' �]
with 4" hook. Bolt circle 13 1/2 "+
1/4" dia. equally spaced. o I I
Finished Grade i 2
0 1
Do
C) 0 1
Ground Wire to Ground
Rod at First Handhole in
in
Conc. Round or Square O7 7
TYPE PPB TYPE PS
TYPE I PEDESTRIAN PUSH PEDESTRIAN
FOUNDATION DETAIL B FOR TYPE PPB FOUNDATION DETAIL C FOR TYPE PS BUTTON POST HEAD STANDARD
TYPE I
VEHICLE HEAD
STANDARD
TYPE IIB (DOUBLE) TYPE IIIB (DOUBLE) SPECIAL DESIGN
MAST ARM SIGNAL COMBINATION LIGHTING AND MAST (See Detail 11 Specifications)
STANDARD ARM SIGNAL STANDARD
REGION NO. STATE FEDERAL PROJECT N0. 5M££T 0:..
M- 1302(4) 1 OF €i
LEGEND
a. Vehicle Signal Head
b. Internally Illuminated Sign
c. Street Name Sign
d. Pre —Empt Detector
e. Pre —Empt Indicator
f. Pedestrian Signal Head
g. Terminal Compartment
h. Controller Cabinet
i. Pedestrian Push Button Assembly
j. Handhole
k. Luminaire
NOTES
OTop mount plumbizer mounting couplings installed by
fabricator at offset distance indicated in chart.
OField installed, orientation to be approved by engineer.
U3 See Special Provisions for luminaire arm type
®This plan sheet is based on information provided in
the Washington State Department of Transportation
Design Manuel (revised November 1980).
OIf soil conditions at the site are not equal to or better
than shown in the foundation detail, then new foundation
dimensions will be provided by the engineer and any
additional cost will be considered an additive to the
contract.
© All poles and pole bases shall have one extra 2 -inch
conduit that extends to and is capped in the nearest
handhole.
0 Bottom of base to extend to center of ped
push button.
®, Grout required under base plate to center of pole and
finished toward outer surface. A 1/2" tublar drain
hole shall be installed.
OConcrete shall be Class B poured in place with
forming on the top 3 -1/2" and all above grade portions of
the foundation.
10' Size and number of conduit per plan.
11 Saw cut paving when foundation in existing paved surface
12 Bolt circles to be ±1/8" dia. with bolts equally spaced +1 /8'
around circle, and /or according to manufactures specs.
13 Conduit shall extend 3" above foundation.
SIGNAL STANDARD DETAIL CHART
Ground Wire Pedestal
13 2"
Nom. Grout Pad with 1/2 "Drain
in Paved Areas
4 Anchor Bolt. with 2 Washers
Pedestal
Pedestal and Base
Flush in Paved Areas
and 2 Nuts each. 5/8" x 14" with
and Base
33
(X)(y ){Z}
4" hook. Bolt circle 13 1/2 "+
1/4" dia. equally spaced.
13
LT.
RT.
Finished Grade
-Al
m
—
B1
I 1 1111
j ail—
J
Ground Wire to Ground
Rod at First Handhole
E
B5
� I I
L,!
B7
B8
Conc. Round or Square
m
rl
B11
B1
B2
Class "B" Concrete
'2' when constructed
B6
B7
�_
B10
in dirt area
TOTAL (ft.)3
31
F44F
f f
Ground Wire Pedestal G G
4 Anchor Bolt with 2 Washers 2
and 2 Nuts each. 5/8" x 18' �]
with 4" hook. Bolt circle 13 1/2 "+
1/4" dia. equally spaced. o I I
Finished Grade i 2
0 1
Do
C) 0 1
Ground Wire to Ground
Rod at First Handhole in
in
Conc. Round or Square O7 7
TYPE PPB TYPE PS
TYPE I PEDESTRIAN PUSH PEDESTRIAN
FOUNDATION DETAIL B FOR TYPE PPB FOUNDATION DETAIL C FOR TYPE PS BUTTON POST HEAD STANDARD
TYPE I
VEHICLE HEAD
STANDARD
TYPE IIB (DOUBLE) TYPE IIIB (DOUBLE) SPECIAL DESIGN
MAST ARM SIGNAL COMBINATION LIGHTING AND MAST (See Detail 11 Specifications)
STANDARD ARM SIGNAL STANDARD
REGION NO. STATE FEDERAL PROJECT N0. 5M££T 0:..
M- 1302(4) 1 OF €i
LEGEND
a. Vehicle Signal Head
b. Internally Illuminated Sign
c. Street Name Sign
d. Pre —Empt Detector
e. Pre —Empt Indicator
f. Pedestrian Signal Head
g. Terminal Compartment
h. Controller Cabinet
i. Pedestrian Push Button Assembly
j. Handhole
k. Luminaire
NOTES
OTop mount plumbizer mounting couplings installed by
fabricator at offset distance indicated in chart.
OField installed, orientation to be approved by engineer.
U3 See Special Provisions for luminaire arm type
®This plan sheet is based on information provided in
the Washington State Department of Transportation
Design Manuel (revised November 1980).
OIf soil conditions at the site are not equal to or better
than shown in the foundation detail, then new foundation
dimensions will be provided by the engineer and any
additional cost will be considered an additive to the
contract.
© All poles and pole bases shall have one extra 2 -inch
conduit that extends to and is capped in the nearest
handhole.
0 Bottom of base to extend to center of ped
push button.
®, Grout required under base plate to center of pole and
finished toward outer surface. A 1/2" tublar drain
hole shall be installed.
OConcrete shall be Class B poured in place with
forming on the top 3 -1/2" and all above grade portions of
the foundation.
10' Size and number of conduit per plan.
11 Saw cut paving when foundation in existing paved surface
12 Bolt circles to be ±1/8" dia. with bolts equally spaced +1 /8'
around circle, and /or according to manufactures specs.
13 Conduit shall extend 3" above foundation.
SIGNAL STANDARD DETAIL CHART
3/4" Chamfer, No Chamfer
13 2"
Nom. Grout Pad with 1/2 "Drain
in Paved Areas
SIGNAL MAST ARM DATA
POLE ATTACHMENT POINT ANGLES
Hole
Flush in Paved Areas
REMARKS
OFFSET DISTANCES (ft.) (Z) (POLE Q TO ATTACHMENT POINT)
I
(X)(y ){Z}
I STATION
(on line)
OFFSET (ft.)
LT.
RT.
P.O.A.
-Al
A2
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B1
B2
Class "B" Concrete
B4
B6
B7
�_
B10
�� /..
- -_
TOTAL (ft.)3
No. 4 rd. or sq. Hoops as Req'd at
1' -0" Centers
D1
D2
10 n
F1
F2
G
H
2 -1/2"
X
d
p
4' Rd.
3' S .
_
Cir.
X
—'2700
" - '. `"
.0
8 No. 7 Bars Equally Spaced
5/8" x 8' Copper
25
—
Clad Ground Rod
Width or Diameter
—
—
FOUNDA'T'ION DEPTHS
Use the larger (X)(Y)(Z) value for
—
W(Y) Z)
3' Rd.
3' SqI
double mast arm standards.
Applications based on 2500 psf average
—
(ft.)
—
4' Rd.
Lateral bearing pressure and 0 @ 260
—
740
10'
7'
See Note O
—
1100
14'
8'
—
1720
19
13'
E ^ 4' E
12+42
SUNSET BLVD. N.
FOUNDATION DETAIL A
—
X
F44F
f f
Ground Wire Pedestal G G
4 Anchor Bolt with 2 Washers 2
and 2 Nuts each. 5/8" x 18' �]
with 4" hook. Bolt circle 13 1/2 "+
1/4" dia. equally spaced. o I I
Finished Grade i 2
0 1
Do
C) 0 1
Ground Wire to Ground
Rod at First Handhole in
in
Conc. Round or Square O7 7
TYPE PPB TYPE PS
TYPE I PEDESTRIAN PUSH PEDESTRIAN
FOUNDATION DETAIL B FOR TYPE PPB FOUNDATION DETAIL C FOR TYPE PS BUTTON POST HEAD STANDARD
TYPE I
VEHICLE HEAD
STANDARD
TYPE IIB (DOUBLE) TYPE IIIB (DOUBLE) SPECIAL DESIGN
MAST ARM SIGNAL COMBINATION LIGHTING AND MAST (See Detail 11 Specifications)
STANDARD ARM SIGNAL STANDARD
REGION NO. STATE FEDERAL PROJECT N0. 5M££T 0:..
M- 1302(4) 1 OF €i
LEGEND
a. Vehicle Signal Head
b. Internally Illuminated Sign
c. Street Name Sign
d. Pre —Empt Detector
e. Pre —Empt Indicator
f. Pedestrian Signal Head
g. Terminal Compartment
h. Controller Cabinet
i. Pedestrian Push Button Assembly
j. Handhole
k. Luminaire
NOTES
OTop mount plumbizer mounting couplings installed by
fabricator at offset distance indicated in chart.
OField installed, orientation to be approved by engineer.
U3 See Special Provisions for luminaire arm type
®This plan sheet is based on information provided in
the Washington State Department of Transportation
Design Manuel (revised November 1980).
OIf soil conditions at the site are not equal to or better
than shown in the foundation detail, then new foundation
dimensions will be provided by the engineer and any
additional cost will be considered an additive to the
contract.
© All poles and pole bases shall have one extra 2 -inch
conduit that extends to and is capped in the nearest
handhole.
0 Bottom of base to extend to center of ped
push button.
®, Grout required under base plate to center of pole and
finished toward outer surface. A 1/2" tublar drain
hole shall be installed.
OConcrete shall be Class B poured in place with
forming on the top 3 -1/2" and all above grade portions of
the foundation.
10' Size and number of conduit per plan.
11 Saw cut paving when foundation in existing paved surface
12 Bolt circles to be ±1/8" dia. with bolts equally spaced +1 /8'
around circle, and /or according to manufactures specs.
13 Conduit shall extend 3" above foundation.
SIGNAL STANDARD DETAIL CHART
ROLE
NO.
FIELD LOCATION
POLE
TYPE
MOUNTING
HEIGHT (ft.)
SIGNAL MAST ARM DATA
POLE ATTACHMENT POINT ANGLES
LUMINAIRE
ARM (ft.)
FOUNDATION
DEPTHS (ft.)
REMARKS
OFFSET DISTANCES (ft.) (Z) (POLE Q TO ATTACHMENT POINT)
2
WINOLOAD AREAS (ft.) (X)(Y)
(X)(y ){Z}
I STATION
(on line)
OFFSET (ft.)
LT.
RT.
P.O.A.
-Al
A2
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B1
B2
B3
B4
B6
B7
B9
B10
B11
TOTAL (ft.)3
C
D1
D2
E7
E2
F1
F2
G
H
11
12
X
3' Rd.
4' Rd.
3' S .
14 +85
(N. 3RD ST
36
X
—'2700
a
19
—
25
—
{ !
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
71
—
GG
V
12+42
SUNSET BLVD. N.
7 2
—
X
PS
!!
1 O
-
14
17 +87
(N. 3RD ST)
52
—
X
M
A
14 ,
e
l}'
IV
or ffillow
CITY OF RENTON
DEPARTMENT OF PUBLIC WORKS
SUNSET BLVD'. N. 8t` N. 3RD ST.
/ POLE, SCHEDULES
DESIGNED DA, MAY 83 FILE NO.
DRAWN tJ.
CHECKED SCALE FIELD EDOr aAGE —.
O. REVISION I o. A-1-1R. I . I APPROVED • *+�� - SHEET-LO—OF I I
—D V a% -)
rte\ n . t t. ^