Loading...
HomeMy WebLinkAboutT-187501G E N E R A L N 0 T E S �X /ST / /y� APARTME/vT Bu /LO //UG EXIST POCKEkY Ex/STiNFJ 6 ' NOOD FENCE ' CSJ G JOCK Z'I'✓ -c,Cicl� X X =x X % k� �_ _ 3tOB 97 ENO GU.f?8, gel \ �I� iz I I � Z QF MA /N FIN. E �fLR. ELEV. /26.5 E /26.5 UPPER F /N. FLR. CLEV. /35 -- II EX /5T /NCB F/OUSE J I Cef TYPE ICE) y t I TO BE 2EM0 D I R/ 113.50 a J aEXISTING UTILITY POLE -ASPHALT Pf4VEMEN7 H 2' W/ POWER 1'RANSPORMER r4 2 �< APP.— STA. 1 -f50 o w 0 e v O \ I / �h k c o - _I TI r to R/M /07.44 1d5- 0011N) y /22 RENIO✓ EX/ C�5 TYPE / -G I /F /M 1/4.70 \ R/M /16.00 /E. / /0.00 I O O H ` W 1 LE. /04.7B(OG/TJ STA 5 + U w H E D U L E /. E//4.08 //2,75/ ORIFICE 2 ' 4 H I Z ck 3CAL E : /"=/O' v a I , 3 Ea 0 I _ _ - -_ Q oA+ / I G �• o ;Y,/ I C 20 o RI06E UN,� -0+. i , ( �JSPHALT l / N STA. 2f.53.A2� I PAVEMENT Q 2 Nzx OH CIRCUIT / E z I / I z g a 5 CONDUCTORS / POLE LOCATION. t OF ROAD WATTAGE H ARM NO. REMARKS 3. ALL WORK SHALL BE CONSISTENT WITH UTILITY AGENCY GM �1L. \ \� / �[ 20 Z.F -,5 gr 6 /� 4r3k. r,, "� 0 0 2 �Ff. 1E Pk ryp cM = 0 -2 5 h P S fl. REQUIREMENTS. THE CONTRACTOR SHALL CONTACT ALL 1 // � (SCHEDULE, 40). 2 - #8, -,' 0+85 25' 250 6 14 GA. AL. /'1 . -.:... ... ,+., . ._ - -F .w tea.,- .. "..... .., .,. \ k / ,. FLDN✓ I //VE B�Ci /N NEk/ GE,�yE/YT �,i CONCRETE S /d��lvALK . .. `- ,xho �^, �,;_ —, '. / / tik00 / i /� 30' DR/V WAS 144 7r-9 EX/S7�//Vq / Z / / / iv �!L� o l°' \ k - 1 � /f E '�. U`' /L /TY / / T� / POLE TO !3E � RELOCATED 30'DR /VEAIAY PER C//7 Y STDS. /o / / / I / I O � � / I �LSTRAW '/ y / E..ROS/ W (!� \e f�4LESFO.R N CONTROL PE c /TY .gyros- ( WORK, AND SHALL COORDINATE THE WORK WITH THE UTILITIES e �o 2" PVC (SCHEDULE F� /ST UTILITY 3 - #2 % 2, POL E TO BE N.W. 3RD PLACE I / 150 RELOCATED �J S' EX /ST F)S TO OZ s RELOCATED EH //VD \ 3337C TfIROUGHOUT THE PROJECT. NEiY S /DEWs1 W AS 8 RB NFAI \\ a- TER MATCi/ EV5T1A1q cO \ 0 +00 \ O NW /IRO 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO �3 O. Pf0 �DO (SCHEDULE 40) G E N E R A L N 0 T E S �X /ST / /y� APARTME/vT Bu /LO //UG EXIST POCKEkY Ex/STiNFJ 6 ' NOOD FENCE ' CSJ G JOCK Z'I'✓ -c,Cicl� X X =x X % k� �_ _ 3tOB 97 ENO GU.f?8, gel \ �I� iz I I � Z QF MA /N FIN. E �fLR. ELEV. /26.5 E /26.5 UPPER F /N. FLR. CLEV. /35 -- II EX /5T /NCB F/OUSE J I Cef TYPE ICE) y t I TO BE 2EM0 D I R/ 113.50 a J (VANED ;RATE C6 TyPE / -G R//l! 123.40 /E. /20.56 1 +00 1 NW 2 +00 _:, \/ Bird FoII(��� I. E G E U D 1 'Ile 1 _ 3rak PLACE I� l TYPE M -N -III H.P.S. LUMINAIRE, ARM AND ALUMINUM DAVIT STYLE POLE CONCRETE P21D LIGHT BASE AND JUNCTION BOX B 5AXNC!/T EX 1571NO PAV)T - - PVC CONDUIT (SEE WIRING SCHEDULE) REMOVE EX /ST / /VCj GURU AGONY � EX. CB db NN 3rd PL. A5 /F59U1R00 ,!� REPLACE EX. 6RATE N1 (® STREET LIGHT CONTACTOR CABINET AND FOUNDATION r SOLID COVER) AD ✓UST ' ' JUNCTION BOX B WITH CONCRETE PAD R/M TO NEW SURFAC E �a GRADE. 1. ALL, WORK SHALL BE IN ACCORDANCE WITH THE PROJECT -ASPHALT Pf4VEMEN7 �< I 11A / e�/yTROL /Ylfl e v O \ I / �h k CB T�PE�?C% NORTH Q R/M /07.44 1d5- 0011N) y /22 RENIO✓ EX/ C�5 TYPE / -G I /F /M 1/4.70 \ R/M /16.00 /E. / /0.00 I (1 Q I r I W 1 LE. /04.7B(OG/TJ STA 5 I N G S C H E D U L E /. E//4.08 //2,75/ ORIFICE 2 ' 4 J U I Z ck 3CAL E : /"=/O' SD yq I //� I _ _ - -_ Q CU,PB.PETURN / / o ;Y,/ RI06E UN,� -0+. / - STA. 2f.53.A2� .. .k / CIRCUIT NO. CONDUIT /8'LT CONDUCTORS NO. POLE LOCATION. t OF ROAD WATTAGE H ARM NO. REMARKS 3. ALL WORK SHALL BE CONSISTENT WITH UTILITY AGENCY GM �1L. \ \� / �[ 20 Z.F -,5 gr 6 /� r,, "� 0 0 2 �Ff. ryp cM = 0 -2 5 h P S fl. REQUIREMENTS. THE CONTRACTOR SHALL CONTACT ALL 1 // � (SCHEDULE, 40). 2 - #8, -,' 0+85 25' 250 8/0 4 CMP� $7 O.O 14 GA. AL. /'1 . -.:... ... ,+., . ._ - -F .w tea.,- .. "..... .., .,. \ k / ,. FLDN✓ I //VE r ' z-rs 1 . .. `- ,xho �^, �,;_ —, '. / / tik00 / i /� 30' DR/V WAS / Z / / / iv �!L� o l°' \ k - 1 � /f E '�. U`' /L /TY / / T� / POLE TO !3E � RELOCATED 30'DR /VEAIAY PER C//7 Y STDS. /o / / / I / I O � � / I �LSTRAW '/ y / E..ROS/ W (!� \e f�4LESFO.R N CONTROL PE c /TY .gyros- ( (VANED ;RATE C6 TyPE / -G R//l! 123.40 /E. /20.56 1 +00 1 NW 2 +00 _:, \/ Bird FoII(��� I. E G E U D 1 'Ile 1 _ 3rak PLACE I� l TYPE M -N -III H.P.S. LUMINAIRE, ARM AND ALUMINUM DAVIT STYLE POLE CONCRETE P21D LIGHT BASE AND JUNCTION BOX B 5AXNC!/T EX 1571NO PAV)T - - PVC CONDUIT (SEE WIRING SCHEDULE) REMOVE EX /ST / /VCj GURU AGONY � EX. CB db NN 3rd PL. A5 /F59U1R00 ,!� REPLACE EX. 6RATE N1 (® STREET LIGHT CONTACTOR CABINET AND FOUNDATION r SOLID COVER) AD ✓UST ' ' JUNCTION BOX B WITH CONCRETE PAD R/M TO NEW SURFAC E �a GRADE. 1. ALL, WORK SHALL BE IN ACCORDANCE WITH THE PROJECT �< SPECIFICATIONS AND THESE PLANS. 2. THE LOCATIONS OF FEA'T'URES SHOWN ARE APPROXIMATE AND W I R I N G S C H E D U L E LU M -IN A I R E S C H SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR AS NECESSARY. - - RUN LUMINAIRE (L OF POLE TO LAMP .k MAST CIRCUIT NO. CONDUIT CONDUCTORS NO. POLE LOCATION. t OF ROAD WATTAGE H ARM NO. REMARKS 3. ALL WORK SHALL BE CONSISTENT WITH UTILITY AGENCY REQUIREMENTS. THE CONTRACTOR SHALL CONTACT ALL 1 1.5" PVC (SCHEDULE, 40). 2 - #8, 1 - 118 BARE 0+85 25' 250 30 8' 1 3339F PERTINENT UTILITY AGENCIES 40 HOURS BEFORE COMMENCING - 1 TAYLOR AVE. N.W. WORK, AND SHALL COORDINATE THE WORK WITH THE UTILITIES 2" PVC (SCHEDULE 80) 3 - #2 (SERVICE) 2, 0 +52 N.W. 3RD PLACE 25' 150 25 S' 1 3337C TfIROUGHOUT THE PROJECT. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO �3 1.5° PVC (SCHEDULE 40) 2 - #8, 3-#14 BARE 3 1 +71 N.W. 3RD PLACE 25' 150 25 8' 1 3335 C EXISTING UTILITIES. THE CONTRACTOR SHALL NOTIFY THE 4 1.5° PVC (SCHEDULE 40) 2 - #8, 3 - #14 , 1 - #6 BARE AFFECTED UTILITY COMPANY AND THE CITY IMMEDIATELY UPON - * STANDARD DAVIT POLE DETAIL, SHEET 2 OF 2. DAMAGE. A5 1.5" PVC (SCHEDULE 40) 2 - #8, 3 - #14 5. THE CONTRACTOR SHALL SUBMIT A REQUEST FOR MATERIALS A6 1.5" PVC (SCHEDULE 40) 2 - #8 APPROVAL AT THE EARLIEST POSSIBLE DATE. 6. INSTALL ALL STREET LIGHTING MATERIALS SHOWN ON THE * 3 - #14 FOR PHOTOCELL PLANS, EXCEPT AS NOTED. ALL MATERIALS SHALL BE NEW AND OF THE BEST AVAILABLE GRADE OR QUALITY, EXCEPT AS NOTED. __ -- t]RCWN BY E AS-BUILT WAS PREPARED BY TOUMA ENGINEERS FROM AN ACTUAL FIELD SURVEY FOR HORIZONTAL CONTROL ONLY