Loading...
HomeMy WebLinkAboutT-199712a -- LTD AVE a — — n -- a rn s 9 73 - -__ 13 - -14 +98 175 — 10 r + _ p ^ N 2 Z 9 ma +a ` h CO K N W — 5 Ta —�� 2 I =� 13 �� I 7 IA— IIZ N u7 h ~ — — z xn GO II ro Q + N ,n c 13 7 II 10 ONLY STA 0 +70 � LY 12 13 �I r II � II II fl 8 IIh + Q: h Z h F- II co 1- W � o II e 7 2 0 Id- ROADWAY NOTES (SEE SHEET 2) 1. All work and materials shall be in accordance _.. 7.... A copy..of- the - approved _ plans -must be on the job. with City of•gI5enton Standards and Specifications site whenever construction is in progress. (1979 Edition) and 1984 Standard Specifications for Road, Bridge and Municipal Construction 8. All disturbed areas not receiving landscaping shall (state of Washington). be hydroseeded with rye grass. Seeding shall be done using an approved hydroseeder or as otherwise approved 2. Existing utility locations are approximate only. by Ring County Department of Public Works. Seeding shal It shall be the Contractor's responsibility to verify be used only between April and October. locations and inverts prior to construction. 9. The storm drainage system shall be constructed 3. All dewatering required shall be done in according to the approved plans which are on file accordance with Section 7- 11.3(01) 1984 Standard in City of Renton Department of Public Works central Specifications for Road, Bridge and Municipal records. Any deviation from the approved plans will Construction (State of Washington). require written approval from the Department of Public Works. 4. Unless otherwise noted, storm drain pipe shall be rubber gasketed concrete (ASTM C -14 -II or ASTM C- 76 -II) 10. Soil compaction shall be in accordance with ASTM galvanized steel with asphalt treatment 1 or D -1557 (Modified Proctor). better, aluminized steel Type II or better (16 - gauge min.) helically corrugated metal pipe with watertight connecting bands. or equal. Corrugated Plastic Pipe (CPP) shall be as manufactured by A.D.S. or equal. 5. Where new paving matches existing paving, apply tack coat for proper sealing per City of Renton requirements. 6. Pipe excavation, backfill and bedding shall conform to Section 7 -04 of the 1984 Standard Specifications - for Road, Bridge and Municipal Construction (State of Washington). Unless shown otherwise, bedding shall be sand or pea - gravel, in accordance with Section 9 -30.7A of the 1984 Standard Specifications for Road, Bridge and Municipal Construction (State of Washington). Remaining backfill and compaction shall be in accordance with Section 7- 04.3(3) of the 1984 Standard Specifications. Water settling will not be allowed under roads or walks. Compact trench backfill to 95 %. i STA 1 + 75 II I� CHANNELIZATION NOTES 0 L ONLY II 12 � ORemove center stripe and buttons, approx. sta 75+38 to approx. sta o+' II ' 78+15. 2O Remove lane stripe, approx. sta 75+48 to approx. sta 78 +55. DRemove lane stripe, approx. sta 75 +48 to approx. sta 78 +00. 1 4� Remove lane stripe, approx; ste 71 +46 to approx. sta 74+48. SO Remove portion of RR crossing warning bar that extends into new II II northbound left-turn lane. 6� Lane stripe (Type 2 markers). �• ((y�� II II OPainted center stripe. OPainted R' gore stripe. j I� Ij II CONTINUE CENTERSTRIPE a .BUTTONS TO WEST. END OF SW 39th ST. O Thermoplastic crosswalk stripe (1' wide). CONTINUE LANE STRIPE TO WEST END OF SW 39th ST. 10 Thermoplastic stop -bar (18' wide). II II 11 Thermoplastic arrow. II 12 Thermoplastic 'arrow' message. 13 10' traffic buttons (see Specifications for configuration). - o+ �� I + ✓xr t -i.Aii 7 Ds n Bye D_HAMLIN___ __ �� /5H ,G r ; DAVID I. HAMLIN ASSOCIATES 'INTERSECTION S I CNALI ZAT I ON � �'�rit�, r U - BIND AVENUE SW CHANNEL I ZAT I ON PLAN Dwn By a — _— _-- - - -__; ;r 81606 8th Avenue North 7 >' Seattle, Washin ton 98109 AT Ck d B y -- _--- - -- - -- ( 206) 281 SW 39TH ST. 8111 DATE JUNE 1986 SHT_5___OF_5__ 6),5110