Loading...
HomeMy WebLinkAboutT-210802LEGEND 23 SERVICE CABINET JUNCTION BOX LIGHT STD. & LUMINA /RE CONDUI T CONCRETE PAD SCALE- 20' Cl) -ST .4 4-56. i85 -RT KENNEWICK AVE. Ni S T_A 10, 18.5' LT,' 14 L % 'y 07�----------- ----------- 26,-" 25 ION NOTES: 28 GENERAL CONSTRUCT 27 29 1. A,, work shall be in accordance with the City of Renton standards Specification and these plans. 2. The contractor shall submit G request to the City of Renton for Ttiterials approval at the earliest possible date. -J.—All work shall be consistent with utility agency requirements. The contractor shall contact all pertinent utility agencies 48 hours before commencing work and shall coordinate work with utilities throughout the project- 4. The contractor shall be responsible for any damage to existing utilities. The contractor shall notify the affected utility company and the city immediately upon damage. 5. The contractor shall notify the City of Renton Field Inspection Division _(277-5570) for inspection purposes, 24 hours before commencing work. No work shall be covered until its been examined by the inspector. All conduit cover shall be 24 inches. AS-BUILT DRIVEWAY LOCATIONS ARE SHOWN CORRECTED T_VID8 7 Maintain clearances from such features such as property lines, location ON SHTS, 2,3, & 6 OF 27 of driveways, fire hydrants and any other features. minimum 10 Fr, NE. Pd SEC. 5. TWN. 23 N. R 5 F_ Wh CHEChZDF CI VL 'u,U 11!71.,:EG TO C17Y S S F�.:I;' iPLOVAL SEE SHT 24 OF 27 CHECKED FCR CO,'#& FL: ",'.L- TO CITY STANDARD MA TCHL INE STA 6+63.71 MATCHL .0. 14 -7.1 0S i43J 71.22"', INE STA 5+36.80 T 24 OF 27 - -- --------- IN -------------- 4— �13 Ar 4 5 II 2 -­J STA �G, LT. Q_ e-, A jm 2 Z-1 '1 2 2 1 Q. STA 1-56 18.5' LET , \1 rf 2 I 0(3, Cl) -ST .4 4-56. i85 -RT KENNEWICK AVE. Ni S T_A 10, 18.5' LT,' 14 L % 'y 07�----------- ----------- 26,-" 25 ION NOTES: 28 GENERAL CONSTRUCT 27 29 1. A,, work shall be in accordance with the City of Renton standards Specification and these plans. 2. The contractor shall submit G request to the City of Renton for Ttiterials approval at the earliest possible date. -J.—All work shall be consistent with utility agency requirements. The contractor shall contact all pertinent utility agencies 48 hours before commencing work and shall coordinate work with utilities throughout the project- 4. The contractor shall be responsible for any damage to existing utilities. The contractor shall notify the affected utility company and the city immediately upon damage. 5. The contractor shall notify the City of Renton Field Inspection Division _(277-5570) for inspection purposes, 24 hours before commencing work. No work shall be covered until its been examined by the inspector. All conduit cover shall be 24 inches. AS-BUILT DRIVEWAY LOCATIONS ARE SHOWN CORRECTED T_VID8 7 Maintain clearances from such features such as property lines, location ON SHTS, 2,3, & 6 OF 27 of driveways, fire hydrants and any other features. minimum 10 Fr, NE. Pd SEC. 5. TWN. 23 N. R 5 F_ Wh CHEChZDF CI VL 'u,U 11!71.,:EG TO C17Y S S F�.:I;' iPLOVAL Date CHECKED FCR CO,'#& FL: ",'.L- TO CITY STANDARD .0. 14 -7.1 0S "AS-BUILT" FROM FIELD SURVEY BY TOUMA ENGINEERS. I` I I I I I A I I I I A I I I A I A I