Loading...
HomeMy WebLinkAboutT-216501FxPl,rs cTw e - .t VAULT'D:,. VAULT 'I 6 F 7 G 7 _ ` -- AK 5,7 .PRIMARY TRENCH -. - - -- RH I I T NOTE :PROFESSIONAL LICENSE STAMP SIGNED AUGUST 1999 CERTIFIES AS- SUILTSONLY. I 1 OFF-SITE E ELEC I�I�.//\.L PLAN NOTE: AS- SUILTS FIELD SURVEYED SY PAC TECH ENGINEERING INC. JULY 1995 S A NOTE: AS -9UILT DATA PER CITY OF RENTON SURYEV CONTROL NETWORK. 019E-2. 1" - 40' -0 N54107 108 E 395453.603 N 54140. 1371 E 395469.537 N54160.386 E 395488.753 N 54175.090 E 395514.531 N 53966.959 E 395489.387 N 54002.767 E395474. 085 N 54037'084 E 395459.981 N5407P.453 E395450.726 N 53851.474 E 395554.308 N 53887.384 E 395533,794 N53925: 835 E 395511.600 N 53818.722 E 395568.375 POLE AND LUMINAIRE SCHEDULE WIRING SCHEDULE RUN CONDOR CONDUCTORS NO. SIZE OE RKTURE CffY CODE AT STATION 1- 1/2"C. 2#6, 1#6 GND 8 SCHEDULE 40 a� 4 +44.7 i7 -0" 35 0 1- 1/2'C. 2#6, 1#6 GND B-) SCHEDULE 40 771 ' 35-0" 8-0' 250W 1- 1/2 "C. 2#6, 1#6 GND Y3' -0" SCHEDULE 60 8-0" 250W M25OA2 1 1 /2"C. 2#6 1#6 .GND 8-0 SCHEDULE 40 M250A2 O 9 +602 1 1/2 C 4 #6 1#6 GND M250A2 SCHEDULE 80 8 +309 35 0' 1-1/2 C 4#6 1#6 !GND L , SCHEDULE 40 0 X35 0 8' -0' 2501 1 1/2 C 4 #6 1#6 'GND . :SCHEDULE 40 8' 0' 25OW. : M250A2 � A 1/2 C. 4#6, 1#6 GND SCHEDULE 40 Di A 1- 1 /2'C. 6#6, 1#6 GND /J\ SCHEDULE 80 12+b1_37 ' -0" 3t,'-U' 1- 1/2 "C. 6#G, 1 #6 GND SCHEDULE 80 -0" 35' -0" 8-0" k, i- i /2' "C. 9 #6, 1 #6 GND 2 ' SCIiE/DULE 40 L:J I1;i +11.0 a -J' 35' -0" �' °� SCHEDULE 4U M250A2 - N54107 108 E 395453.603 N 54140. 1371 E 395469.537 N54160.386 E 395488.753 N 54175.090 E 395514.531 N 53966.959 E 395489.387 N 54002.767 E395474. 085 N 54037'084 E 395459.981 N5407P.453 E395450.726 N 53851.474 E 395554.308 N 53887.384 E 395533,794 N53925: 835 E 395511.600 N 53818.722 E 395568.375 POLE AND LUMINAIRE SCHEDULE POLE POLE'. POLE POLE ARM LAMP OE RKTURE CffY CODE AT STATION OFFSET HEIGHT LENGTH VOLTAGE 8 i a� 4 +44.7 i7 -0" 35 0 8' -0 250W M250A2 B-) 3 +25.75 771 ' 35-0" 8-0' 250W M250A2 - © 2 +24.25 Y3' -0" 35-11' 8-0" 250W M25OA2 OD 1 +239 *?.-A O'' 35 0 8-0 250W M250A2 O 9 +602 L' 2;L 0° 35 d' 8' -0' 2501 M250A2 8 +309 35 0' 8' -0' 25OW 7 +09 3 0 X35 0 8' -0' 2501 5 +663' . 35-C( 8' 0' 25OW. : M250A2 Di 13 +96.5 z"7' -Y' 35-C 8' -0 250W M250A2 - 12+b1_37 ' -0" 3t,'-U' 8' -0 2501 M250A2 - 11 +15.95' -0" 35' -0" 8-0" 250. M250A2 - 2 ' L:J I1;i +11.0 a -J' 35' -0" 8-0" 2501 M250A2 - I I I I I ®I I I I T I I I T I A NK. /S • � o< RE�I✓ToN� ��n/D G /TY If 1 NEW PUGET POWER "rt 120/24OV, 10 T TRANSFORMER IN +' y PROVIDE PROTECTIVE E POWER COMPANY BOLLARDS 1 SERVICE CABINET IN I POWER COMPANY 1` EASEMENT —�: — — 2 4 1 — P O � 4 I _ PRIMARY TRENCH T 2A .VAULT B7' -14 1 PHOTO CELL TO BE — /JJ 1 _ - LOCATED ON POLE EXISTING. VAULT 'A' AT THIS LOCATION 1 As 2 OFF -SITE ELECTRICAL PLAN 019E -2 1' = 40' -(1' - - -- Z I A I I' I I I N 7-4? 1 1 t 1 1 REVISIONS 3 u on rn3 °n IV L Ibnn 9 LLI `J 0 Z¢ 3 D1 O N N AS SMIOUIN uee�m Hr: DPR SHEET TITLE: ELECTRICAL SITE PLAN SHEET NO OSE-2 1 1 1 z