Loading...
HomeMy WebLinkAboutT-220811O CONSTRUCTION NOTES: G GENERAL NOTES: I. INSTALL A NEW 25 FOOT MAST ARM ONTO EXISTING SIGNAL POLE. INSTALL TWO NEW 1 1. ALL VEHICLE SIGNAL HEADS SHALL BE CONVENTIONAL HEADS WITH TUNNEL VISORS AND VEHICLE SIGNAL HEADS (TYPE M MOUNT), AND TWO FIBER OPTIC PEDESTRIAN SIGNAL S SQUARE DOORS. 2. INSTALL NEW SIGNAL POLE FOUNDATION AND TYPE III SIGNAL POLE WITH A 40 FOOT H 2. ALL PEDESTRIAN SIGNAL HEADS SHALL BE FIBER OPTIC HEADS WITH TYPE E MOUNTING MAST ARM. INSTALL THREE NEW VEHICLE SIGNAL HEADS (TYPE M MOUNT), TWO FIBER S STANDARD PLAN J024 AND J025. OPTIC PEDESTRIAN SIGNAL HEADS WITH TYPE E MOUNTING, TWO PEDESTRIAN PUSH BUTTONS AND SIGNS, AND A TERMINAL BOX. RELOCATE EXISTING EMERGENCY 3 3. ALL VEHICLE SIGNAL HEADS SHALL BE TYPE M MOUNTED, UNLESS OTHERWISE NOTED. INSTALL TYPE 111 CUTOFF OPTICS, 400 WATT HIGH PRESSURE SODIUM LUMINAIRE WITH A 35 FEET 4 4. ALL DETECTOR LOOPS SHALL BE 6 -FOOT BY 6 -FOOT. LOOPS ARE TO BE CENTERED IN MOUNTING HEIGHT ON 10 FOOT DAVIT ARM. ALSO INSTALL A "LEFT TURN MUST YIELD ON GREEN" T THEIR RESPECTIVE LANES AND LOCATED AS SHOWN BY TYPICAL DIMENSIONS. UNLESS ON THE NEW MAST ARM. O OTHERWISE NOTED. 3. INSTALL NEW SIGNAL POLE FOUNDATION AND TYPE If SIGNAL POLE WITH A 30 FOOT 5 5. ALL SIGNAL POLES SHALL HAVE MOUNTED TERMINAL BOX. MAST ARM. INSTALL TWO NEW VEHICLE SIGNAL HEADS (TYPE M MOUNT), ONE NEW STREET NAME SIGN, TWO FIBER OPTIC PEDESTRIAN SIGNAL HEADS WITH TYPE E MOUNTING, TWO 6 6. JUNCTION BOX AND CONDUIT LOCATIONS SHALL BE FIELD ADJUSTED IN ORDER TO PLACE EMERGENCY VEHICLE PRE - EMPTION DETECTOR ONTO NEW MAST ARM. 7. REMOVE AND SALVAGE ALL THE EXISTING HARDWARE: INCLUDING SIGNAL POLE, MAST 4. EXISTING SIGNAL POLE TO REMAIN. INSTALL A NEW 35 FOOT MAST ARM AND A 10' DAVIT ARM A ARM, SIGNAL HEADS, PEDESTRIAN SIGNAL HEADS, AND POLE MOUNTED TERMINAL BOX, M MOUNT), EXISTING STREET NAME SIGN, NEW "LEFT TURN MUST YIELD ON GREEN" SIGN, AND EXISTING EMERGENCY VEHICLE PRE - EMPTION DETECTOR ON THE NEW MAST ARM. INSTALL 8 8. EXISTING POLE AND CABINET FOUNDATIONS SHALL 6t REMOVED, SEE SPECIFICATIONS. PUSH BUTTONS AND SIGNS. 9 9. THE LOCATION OF CONDUIT AND JUNCTION BOXES SHOWN ON THESE PLANS ARE FOR 5. INSTALL NEW TYPE M TRAFFIC SIGNAL CONTROLLER WITH FOUNDATION, CONTROLLER, C GRAPHIC REPRESENTATION ONLY. JUNCTION BOXES SHALL BE SET OUTSIDE WHEEL CONTROLLER CABINET, AND AUXILLARY EOUIPMENT. O OF THE ENGINEER. 6. INSTALL NEW TYPE III ELECTRICAL SERVICE AND CABINET ON NEW PAD FOUNDATION. 1 10. SEE ILLUMINATION PLAN SHEET FOR CONDUIT RUN OF LUMINAIRE ON SIGNAL POLE. 7. ADJUST EXISTING JUNCTION BOX TO GRADE. p p 8. INSTALL NEW INTERCONNECT WIRE IN EXISTING CONDUIT. � �19 9. PUGET POWER SHALL PROVIDE POWER AND CONNECT POWER SOURCE TO SERVICE CABINET. 2 20 10 0 20 40 j SCALE: I " =20' BUILD NG 3 0..ar_ 55 � 56 73 0 °5 ' 2 " E y -- 45A - - p- - -- l SIGNAL DISPLAYS VEHICLE HEADS 12 12 PEDESTRIAN HEADS 17.89 ", 1 - \ TA 7 +1 31.35' LT. 1 10 21A i _ _ - -- -------- - - - - -- -,7 �: • r 82 1 _ � 1 31/8 1 IN m PHASING SEQUENCE DIAGRAM 01 `;<� USED 05 i t NOT 02 I 06 USED 03 J 07 04 08 i I I v [ _ -------- CS = CONDUCTOR SHIELDED C = CONDUCTOR i I • r AND SCHEDULE I m� -0- 00__0 • . ® e eo - -� - F - 71/41 31 3 33{ g42 ` -- -------19 -- ....._._..v.. — - - - - - -- - --" -- - 1 14 -STA. 56 +55 f ? <- 18 46.8'RT (y� w 2 ♦ -�` �� ) I I y 15 2 7 5 3 ( 3 E SIGN (L E r, 12" R 12" R LEFT TURN - 16.08„ YIELD i i ON GREEN I 12" Y 12" Y HEADS N0. 18, 19, I8A, 19A R 10 -12 12" Cj 12" G 18B, 19B, 18C, 19C SIGNS SI, S2 HEADS N0. OPTIC FIBER STREET NAME SIGNS 21, 22, 21A, 22A 12" TURN ARROW 42, 43, 82, 83 DUAL MODE N $ TH ST BARK AV N NOTE: THE CONTRACTOR WILL INSTALL THE CONFLICT MONITOR'S WIRING HARNESS IN THE SIGNAL CONTROLLER FORTHEL CABINET. COMPLETION CONFLICT THE E CONTRACTORESHALLACO TIACTOTHTC TYIOFNRENTONESIGNAL c 6�DF W�H /c�� w�hl4'c��� COMMUNICATIONS SHOP. AT WHICH TIME, THE CONFLICT MONITORS AND THEIR RESPECTIVE WIRING HARNESSES WILL BE INSPECTED AND TESTED BY THE CITY OF RENTON SIGNAL COMMUNICATIONS PERSONNEL BEFORE THE CONFLICT MONITORING DEVICE IS ACTIVATED ••II oF9fG 1/ x kf 16104��� WITHIN THE SIGNAL CONTROLLER CABINET. Ef sy olnEEN °`,� Z CH;- .IjG fps /DHAt ai ES THIS SHEET ss,,(li7 ESPIRES EXPIRES T- 5 SIGNAL PLAN LEGEND ® TYPE I JUNCTION BOX Q TYPE II JUNCTION BOX VEHICLE SIGNAL HEAD -•a PEDESTRIAN SIGNAL HEAD EMERGENCY VEH. PRE- EMPTION DETECTOR C7):�--TYPE III SIGNAL POLE, MAST ARM AND LUMINAIRE CNN -TYPE II SIGNAL POLE AND MAST ARM I-► SIGN ON MAST ARM LOOP DETECTOR p ® SIGNAL CONTROLLER ® ELECTRICAL SERVICE CABINET CITY OF RENTON PLANNING /BUILDING /PUBLIC WORKS DEPARTMENT PARK AVENUE NORTH BRONSON WAY NORTH TO NORTH 10th STREET SIGNAL PLAN PARK AVE. N, & N 8TH ST. ¢ Q ¢ HEADS N0. EDA E ® p p, /a ® I _V'�CORD DWG 9/ "5 DESIGNED: jj�ATE_ DEC. S3.19193 FILE NAME: 31/81, 71/41 - S3 (EX.) 54 (EX.), S5 (NEW) PROJECT NO. f7 e4 ,! V DRAwN: 07-01 -03375 / ENGINEERS SCIENTISTS PLANNERS SURVEYORS CHECKED: aLEn a5 SHOWN Eao IKgl4 ra¢, M.�-�j e� STA 29 +04 TO WASHINGTON ARIZONA CALIFORNIA APPROVED: 66 ID- ®° 41 1 STA 74 +50 N0. REVISION BY APPR. DATE SHEET: q3 OF: r r 20 19 18 17 1 15 14 13 12 11 10 9 8 7 6 M I R O ox 6 7 8 9 10 11 12 13 14 15 16 17 18 55 � 56 73 0 °5 ' 2 " E y -- 45A - - p- - -- l SIGNAL DISPLAYS VEHICLE HEADS 12 12 PEDESTRIAN HEADS 17.89 ", 1 - \ TA 7 +1 31.35' LT. 1 10 21A i _ _ - -- -------- - - - - -- -,7 �: • r 82 1 _ � 1 31/8 1 IN m PHASING SEQUENCE DIAGRAM 01 `;<� USED 05 i t NOT 02 I 06 USED 03 J 07 04 08 i I I v [ _ -------- CS = CONDUCTOR SHIELDED C = CONDUCTOR i I • r AND SCHEDULE I m� -0- 00__0 • . ® e eo - -� - F - 71/41 31 3 33{ g42 ` -- -------19 -- ....._._..v.. — - - - - - -- - --" -- - 1 14 -STA. 56 +55 f ? <- 18 46.8'RT (y� w 2 ♦ -�` �� ) I I y 15 2 7 5 3 ( 3 E SIGN (L E r, 12" R 12" R LEFT TURN - 16.08„ YIELD i i ON GREEN I 12" Y 12" Y HEADS N0. 18, 19, I8A, 19A R 10 -12 12" Cj 12" G 18B, 19B, 18C, 19C SIGNS SI, S2 HEADS N0. OPTIC FIBER STREET NAME SIGNS 21, 22, 21A, 22A 12" TURN ARROW 42, 43, 82, 83 DUAL MODE N $ TH ST BARK AV N NOTE: THE CONTRACTOR WILL INSTALL THE CONFLICT MONITOR'S WIRING HARNESS IN THE SIGNAL CONTROLLER FORTHEL CABINET. COMPLETION CONFLICT THE E CONTRACTORESHALLACO TIACTOTHTC TYIOFNRENTONESIGNAL c 6�DF W�H /c�� w�hl4'c��� COMMUNICATIONS SHOP. AT WHICH TIME, THE CONFLICT MONITORS AND THEIR RESPECTIVE WIRING HARNESSES WILL BE INSPECTED AND TESTED BY THE CITY OF RENTON SIGNAL COMMUNICATIONS PERSONNEL BEFORE THE CONFLICT MONITORING DEVICE IS ACTIVATED ••II oF9fG 1/ x kf 16104��� WITHIN THE SIGNAL CONTROLLER CABINET. Ef sy olnEEN °`,� Z CH;- .IjG fps /DHAt ai ES THIS SHEET ss,,(li7 ESPIRES EXPIRES T- 5 SIGNAL PLAN LEGEND ® TYPE I JUNCTION BOX Q TYPE II JUNCTION BOX VEHICLE SIGNAL HEAD -•a PEDESTRIAN SIGNAL HEAD EMERGENCY VEH. PRE- EMPTION DETECTOR C7):�--TYPE III SIGNAL POLE, MAST ARM AND LUMINAIRE CNN -TYPE II SIGNAL POLE AND MAST ARM I-► SIGN ON MAST ARM LOOP DETECTOR p ® SIGNAL CONTROLLER ® ELECTRICAL SERVICE CABINET CITY OF RENTON PLANNING /BUILDING /PUBLIC WORKS DEPARTMENT PARK AVENUE NORTH BRONSON WAY NORTH TO NORTH 10th STREET SIGNAL PLAN PARK AVE. N, & N 8TH ST. ¢ Q ¢ HEADS N0. EDA E ® p p, /a ® I _V'�CORD DWG 9/ "5 DESIGNED: jj�ATE_ DEC. S3.19193 FILE NAME: 31/81, 71/41 - S3 (EX.) 54 (EX.), S5 (NEW) PROJECT NO. f7 e4 ,! V DRAwN: 07-01 -03375 / ENGINEERS SCIENTISTS PLANNERS SURVEYORS CHECKED: aLEn a5 SHOWN Eao IKgl4 ra¢, M.�-�j e� STA 29 +04 TO WASHINGTON ARIZONA CALIFORNIA APPROVED: 66 ID- ®° 41 1 STA 74 +50 N0. REVISION BY APPR. DATE SHEET: q3 OF: r r 20 19 18 17 1 15 14 13 12 11 10 9 8 7 6 M I R O ox 6 7 8 9 10 11 12 13 14 15 16 17 18 ® e eo - -� - F - 71/41 31 3 33{ g42 ` -- -------19 -- ....._._..v.. — - - - - - -- - --" -- - 1 14 -STA. 56 +55 f ? <- 18 46.8'RT (y� w 2 ♦ -�` �� ) I I y 15 2 7 5 3 ( 3 E SIGN (L E r, 12" R 12" R LEFT TURN - 16.08„ YIELD i i ON GREEN I 12" Y 12" Y HEADS N0. 18, 19, I8A, 19A R 10 -12 12" Cj 12" G 18B, 19B, 18C, 19C SIGNS SI, S2 HEADS N0. OPTIC FIBER STREET NAME SIGNS 21, 22, 21A, 22A 12" TURN ARROW 42, 43, 82, 83 DUAL MODE N $ TH ST BARK AV N NOTE: THE CONTRACTOR WILL INSTALL THE CONFLICT MONITOR'S WIRING HARNESS IN THE SIGNAL CONTROLLER FORTHEL CABINET. COMPLETION CONFLICT THE E CONTRACTORESHALLACO TIACTOTHTC TYIOFNRENTONESIGNAL c 6�DF W�H /c�� w�hl4'c��� COMMUNICATIONS SHOP. AT WHICH TIME, THE CONFLICT MONITORS AND THEIR RESPECTIVE WIRING HARNESSES WILL BE INSPECTED AND TESTED BY THE CITY OF RENTON SIGNAL COMMUNICATIONS PERSONNEL BEFORE THE CONFLICT MONITORING DEVICE IS ACTIVATED ••II oF9fG 1/ x kf 16104��� WITHIN THE SIGNAL CONTROLLER CABINET. Ef sy olnEEN °`,� Z CH;- .IjG fps /DHAt ai ES THIS SHEET ss,,(li7 ESPIRES EXPIRES T- 5 SIGNAL PLAN LEGEND ® TYPE I JUNCTION BOX Q TYPE II JUNCTION BOX VEHICLE SIGNAL HEAD -•a PEDESTRIAN SIGNAL HEAD EMERGENCY VEH. PRE- EMPTION DETECTOR C7):�--TYPE III SIGNAL POLE, MAST ARM AND LUMINAIRE CNN -TYPE II SIGNAL POLE AND MAST ARM I-► SIGN ON MAST ARM LOOP DETECTOR p ® SIGNAL CONTROLLER ® ELECTRICAL SERVICE CABINET CITY OF RENTON PLANNING /BUILDING /PUBLIC WORKS DEPARTMENT PARK AVENUE NORTH BRONSON WAY NORTH TO NORTH 10th STREET SIGNAL PLAN PARK AVE. N, & N 8TH ST. ¢ Q ¢ HEADS N0. EDA E ® p p, /a ® I _V'�CORD DWG 9/ "5 DESIGNED: jj�ATE_ DEC. S3.19193 FILE NAME: 31/81, 71/41 - S3 (EX.) 54 (EX.), S5 (NEW) PROJECT NO. f7 e4 ,! V DRAwN: 07-01 -03375 / ENGINEERS SCIENTISTS PLANNERS SURVEYORS CHECKED: aLEn a5 SHOWN Eao IKgl4 ra¢, M.�-�j e� STA 29 +04 TO WASHINGTON ARIZONA CALIFORNIA APPROVED: 66 ID- ®° 41 1 STA 74 +50 N0. REVISION BY APPR. DATE SHEET: q3 OF: r r 20 19 18 17 1 15 14 13 12 11 10 9 8 7 6 M I R O ox 6 7 8 9 10 11 12 13 14 15 16 17 18 CITY OF RENTON PLANNING /BUILDING /PUBLIC WORKS DEPARTMENT PARK AVENUE NORTH BRONSON WAY NORTH TO NORTH 10th STREET SIGNAL PLAN PARK AVE. N, & N 8TH ST. ¢ Q ¢ HEADS N0. EDA E ® p p, /a ® I _V'�CORD DWG 9/ "5 DESIGNED: jj�ATE_ DEC. S3.19193 FILE NAME: 31/81, 71/41 - S3 (EX.) 54 (EX.), S5 (NEW) PROJECT NO. f7 e4 ,! V DRAwN: 07-01 -03375 / ENGINEERS SCIENTISTS PLANNERS SURVEYORS CHECKED: aLEn a5 SHOWN Eao IKgl4 ra¢, M.�-�j e� STA 29 +04 TO WASHINGTON ARIZONA CALIFORNIA APPROVED: 66 ID- ®° 41 1 STA 74 +50 N0. REVISION BY APPR. DATE SHEET: q3 OF: r r 20 19 18 17 1 15 14 13 12 11 10 9 8 7 6 M I R O ox 6 7 8 9 10 11 12 13 14 15 16 17 18