Loading...
HomeMy WebLinkAboutT-2211013 0 a Eo na MM mm am o M air;© a ..ZZ wQ3m Soot %/'T® 4/ -2211 CITY OF RENTON BRONSON WAY NORTH (Schedule A) ROUSER TO SUNSET tSR9001 - WASHINGTON STATE TIB (DATA) PROJECT • 8 -1-102 (28) -0 NORTHEAST 3RD STREET (Schedule 13) SUNSET (SR900) TO MONTEREY - WASHINGTON STATE TIB (DATA) PROJECT • 8 -1 -102 (30) -0 AIRPORT li:gUf•ill PROJECT LOCATION I VICINITY MAP INDEX OF DRAWINGS 1 - TITLE SHEET 2 - SUMMARY OF QUANTITIES 3 - ROADWAY SECTIONS AND DETAILS 4 -7 - SITE PREPARATION PLANS 8 -11 - PAVING AND DRAINAGE PLAN 12 -15 - CHANNELIZATION AND SIGNING PLAN 16 - SIGNAL AND ILLUMINATION PLAN (BRONSON) 17 - SIGNAL WIRING DIAGRAM (BRONSON) 18 - SIGNAL AND ILLUMINATION PLAN (N.E. 3RD) 19 - SIGNAL WIRING DIAGRAM (N.E. 3RD) 20 - SIGNAL POLE DETAILS 21 - INTERCONNECT AND TRAFFIC ISLAND DETAILS 22 - SIGNING DETAILS 23 -28 - SIGN SUPPORT STRUCTURE LAYOUT AND DETAILS REVIEWED FOR COMPLIANCE TO CITY'S STANDARDS TRANSPORTATION SYSTEMS DIRECTOR UTILITY SYSTEMS DIRECTOR 23 2 I TENANCE S CES DIRECTOR ec 12 Z2 3 PLAN REVIEW FIRE MARS LL 19 18 17 16 15 14 13 12 11 10 9 8 7 6 MI RO 0X I 1,0 3 s ®+ CITY OF RENTON )r-, 2211 0 TRANSPORTATION IMPROVEMENT BOARD �SSIONAL �Gt / °�r EXPIRES 9/18/96 ® ALPHA Engineering Group, Inc. 6 7 8 9 10 11 12 13 14 I I I I Al 15 16 17 18 19 ,1- 7. - Itl�Ilf� REVIEWED FOR COMPLIANCE TO CITY'S STANDARDS TRANSPORTATION SYSTEMS DIRECTOR UTILITY SYSTEMS DIRECTOR 23 2 I TENANCE S CES DIRECTOR ec 12 Z2 3 PLAN REVIEW FIRE MARS LL 19 18 17 16 15 14 13 12 11 10 9 8 7 6 MI RO 0X I 1,0 3 s ®+ CITY OF RENTON )r-, 2211 0 TRANSPORTATION IMPROVEMENT BOARD �SSIONAL �Gt / °�r EXPIRES 9/18/96 ® ALPHA Engineering Group, Inc. 6 7 8 9 10 11 12 13 14 I I I I Al 15 16 17 18 19