Loading...
HomeMy WebLinkAboutT-221201\ O _ PP VOLT AC.E DROP CAL.CJL.AT \ONa FROM SE.RV \CE G.AE \t�IET� USE \SO WATT i-\FS LAMP�"i40 VOLTS O:,Ce L. \tlE q.MpS \_OCe Ob1MS� \000 FT. F \ XTU\ZE \Jo. \ L = \40' E= O1Cex2x\40- \_O- \000 = 0.23 Yo L-C �a�p = tJEG�I.\G \f�LE F \XTJRE. NO.-L L= `IO, \ 000 - - --- --- - - - -- - -- --- - - -- ------------ \ O ❑ t PP T T PP E.X c� $PP �� t STREET L_1Cab{T `� � t . \ t 20 19 18 17 16 15- 14 13 12 11 10 9 8 7 6 AS -BUILT 't:• R14 1 , '0374 1 O G EXIST \t.1C� STREET' L_ \Gs HT 0@ 0 -b W 01 Lo I � i i I 3 I i I I i I I ce -�A -45 co_�o -qs LIGHTING NOTES 1. BEFORE ORDERING THE FOLLOWING PRODUCTS, THE CONTRACTOR SHALL SUBMIT THE MANUFACTURERS SPECIFICATION BULLETIN FOR CITY'S STAMP OF APPROVAL: STREET LIGHT STANDARD (POLE), LUMINAIRE, CONDUCTORS, SPLICE KITS, FUSE KITS, CONDUITS, JUNCTION BOXES, CONTACTOR CABINETS. 2. LUMINAIRES SHALL CONFORM TO CITY OF RENTON DETAILED SPECIFICATIONS, GE MODEL NO.S M -400A2 AND M -250A2 OR EQUAL. 3. ANY FACILITIES OR FIXTURES NOT DETAILED ON SHEET 13 SHALL STILL CONFORM TO CITY OF RENTON SPECIFICATIONS. 4. CONTRACTOR IS REQUIRED TO INSTALL POLE I.D. NUMBERS PER CITY DECAL NUMBERING SYSTEM AND AS DIRECTED BY THE TRAFFIC ENGINEER. 5. EACH LIGHT POLE SHALL HAVE AN INDIVIDUAL 3'X 7' CONCRETE PAD WITH JUNCTION BOX AS DETAILED ON SHEET 13. EACH JUNCTION BOX SHALL HAVE AN INDIVIDUAL 3'X 3' CONCRETE PAD AS ALSO DETAILED ON SHEET 13. 6. PHOTOCELL SHALL BE INSTALLED ON LIGHT FIXTURE NO.2 ONLY. 7. ALL FIXTURES INCLUDING POLES, JUNCTION BOXES, HANDHOLES AND CABINETS SHALL BE LOCATED IN THE 5 FOOT UTILITY EASEMENT BEHIND THE SIDEWALK. 8. THE LOCATION OF THE SERVICE POINT (POINT OF CONNECTION) TO PUGET POW= SHALL BE VERIFIED WITH THAT UTILITY. 9. THE CONTRACTOR SHALL NOTIFY ALL UTILITIES CONCERNING THEIR FACILITIES LOCATED WITHIN THE PROJECT LIMITS 48 HOURS PRIOR TO EXCAVATING AROUND OR UNDERGROUND CROSSING OF UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING FACILITIES AND SHALL NOTIFY THE AFFECTED UTILITY AND THE CITY IMHEDIATELN UPON DAMAGE. 10. AS -BUILT ZRAWINGS WILL BE REQUIRED UPON COMPLETION OF THE PROJECT. SPEC \AL. NOTES: 1. CtT( Pow ER �L.\ G\iT \ rJG RU N�W \JL JOT 2�E 1 \J Z. L.\C�HT \'.lv RUtJS W\L.L. 8E '7...� DE cp UtJDER THE ' EaAGK EOC=E. OF ENE. S\OEW 3_ZHE STREET CROSS\N(Z' \S oK tt'1 C otV\MC?t 1. _ 4- A M \N\MUM OF \O' FROM L.oT �R \V EW A�(S.( \OFCAT.1 \US FROM POL.E� I I i I i I A I I I II I I I I I . 6 7 8 .9 10 11 12 13 14 15 16 17 18 qS -ELT 1- 22 -4(. �i�J �pRDI. GANTZ, LEN �e SURVEYING 8 ENGINEERING 3721 S. 352ND ST. AUBURN, WA. 98001 5 - -9° -SRS IXPIRES w-9 l0 1 206 -874 -0158 I I i I i I A I I I II I I I I I . 6 7 8 .9 10 11 12 13 14 15 16 17 18