Loading...
HomeMy WebLinkAboutT-226508� e . 7 r I . 7 ^ -It -JW L- J P: \C ADD \DGN\ 93010- 20\HO- PC �.DGN ISTEA PROJECT- MO- 0900('JO7) TIA PROJECT" 9P- 102(006)-I 0 6 O PAVEMENT MARKINGS LEGEND I TH1s SHEET) �a 1 DOUBLE YELLOW, TYPE I AND TYPE 2d LANE MARKERS X 2 WHITE, LANE LINE, TYPE I AND TYPE 2e LANE MARKERS X 3 DOUBLE WHITE, TYPE I AND TYPE 2e LANE MARKERS YELLOW TWO WA LEFT TURN LINE, TYPE I AND TYPE 20 LANE MARKERS -- 5 DOUBLE YELLOW, 6" SOLID PAINT LINES 6 WHITE, THERMOPLASTIC DIRECTIONAL ARROW 7 WHITE, 24" THERMOPLASTIC STOP BAR o 8 WHITE, THERMOPLASTIC CROSSWALK, 10' WIDTH 9 WHITE, 4" SOLID PAINT LINE 10 YELLOW, 4" SOLID PAINT LINE It WHITE, TYPE I LANE MARKERS 2' ON CENTER 12 WHITE, TYPE I LANE MARKER ISLAND W/ CROSSHATCHING (SEE DETAIL ON SHEET 31) 13 DOUBLE WHITE, SKIP APPROACH LINE, TYPE I AND TYPE 2e LANE MARKERS 14 WHITE, THERMOPLASTIC TYPE 2 PREFERENTIAL LANE SYMBOL YELLOW. TYPE I LANE MARKER ISLAND CROSSHATCHING (SEE DETAIL ON SHEET 31) - C) SIGNING LEGEND I REMOVE EXISTING "R3 -7" SIGN. 2 REMOVE F_X!STING "W9 -2" SIGN. 3 INSTAL! NEW "'N4 -3" SIGN AND POST AT H -10 *96 BACK 2' CLEAR OF NEW CURB. 4 INSTALL NEW "R5 -IOC" SIGN AND POST AT H -II.00 BACK 2' CLEAR OF NEW CURB. ❑ ILLUMINATION CONSTRUCTION NOTES 1 INSTALL GENERAL ELECTRIC M -250A2 POWR /DOOR LUMINAIRE WITH MEDIUM TYPE ll! CUTOFF OPTICS, 250 WATT HIGH PRESSURE SODIUM LAMP, 35' MOUNTING HEIGHT, AND MOUNT ON RETAINING WALL I (SEE SHEET 43 FOR DETAIL). 2 INSTALL TYPE I JUNCTION BOX P INSIDE OF BACK OF SIDEWALK. 3 REMOVE EXISTING LUMINAIRE, POLE, AND FOUNDATION. 4 REMOVE EXISTING JUNCTION BOX. GENERAL ILLUMINATION NOTES 1 CONSTRUCT CONCRETE PAD FOR PROPOSED STREET LIGHTING AND JUNCTION BOX PER CITY OF RENTON STANDARD PLAN J014 AND J015. 2 ALL PROPOSED ILLUMINATION CONDUIT RUNS (TRENCH) SHALL BE LOCATED 2' FROM BACK OF CURB. 3 REFER TO SIGNAL PLANS FOR ILLUMINATION AND INTERCONNECT COUNDUIT AT SIGNALIZE INTERSECTION. 4 ALL LUMINAIRES TO BE REMOVED SHALL BE FIRST DE- ENERGIZED AT THE SOURCE AND THEN REMOVE ALL EXISTING LIGHTING WIRING. COORDINATE WITH CITY OF RENTON, TRAFFIC DIVISION. 5 CONSTRUCT LIGHTING UNDERGROUND SYSTEM PER CITY OF RENTON STANDARD PLAN J007. CONDUIT AND WIRING SCHEDULE RUN NO. LCONDUIT HOUSER WAY N. BRONSON WAY NORTH TO NORTH 8th STREET CONDUCTORS I /V2" PVC SCH 40 2 -•8, 1-•8 GROUND 2 J 1Y2" PVC SCH 40 2-•8 � 31/ f?GS �1 -O RECORD DRAVANG NOTATIONS These record draw,no,s reflect certain inens�o� and Icn ec dd a IIn _ "l- :IV - !eItfled b'/ Er Entranco is ,,.>t :esponsibie far h; a.:'::,;rz:;;, apprapriztcnesc .?i �cmple4eness of Fsuch information depicted In thF:.�, :cord dra,,nq �otat:ans. 20 IO 0 20 40 SCALE: I " -20' E N T R A N C EWINEERS , SCIENTISTS - PLANNERS SURVEYORS _._- _... -. - -. _.... WASHINGTON ARIZONA CALIFORNIA REVISION /4-f3 ; T- 226ra8 RO C F WAsy oo ti t 0 36 a RFC I ST ER�"� rem �SS'ONAL ENS` CITY OF RENTON PLANNING /BUILDING /PUBLIC WORKS DEPARTMENT HOUSER WAY N. BRONSON WAY NORTH TO NORTH 8th STREET CHANNELIZATION, SIGNING, AND ILLUMINATION PLAN H -10 +01 TO H -13 +00 UPII 4S q DESIGNED: IV= DRAWN: M DATE: MAR. 21,1995 FILE NAME: I / I CHECKED: ' SCALE: Al SHOWN P -D Boat: PaDE: BY APPR. DATE APPROVED: —ssw.m.nu SHEET: 34 OF:94 ry�u� x ( 1 g a./ o oa �C r lv 0 a y oz