HomeMy WebLinkAboutT-269002i�
FILE NAME
TIME
DATE
PLOTTED BY
DESIGNED BY
ENTERED BY
CHECKED BY
PROJ. ENGR.
REGIONAL ADM.
Kin-rCC.
SB405 -S 1083 +00.00
END 4 '
n��+, nn+ I T%
T. 23 N., R. 4 E., W.M.
v..-v... V lv.vv j
TP -E405 4085 +91.08
EN CURVE (20.15' RT)
SIN 63.4:1 TAPER (20.15' RT)
i
1. PLASTIC FOR PAVEMENT MARKINGS SHALL BE METHYL METHACRYLATE (MMA).
2. FOR PROFILED LINE DETAIL, SEE STANDARD PLANS M- 20.20 -01
3. SEE PAVEMENT MARKING DETAIL SHEET MKD1 FOR GORE AREA DETAILS.
4. AERIAL SURVEILLANCE MARKERS PER STANDARD PLAN M- 24.60 -02.
5. FOR LONGITUDINAL MARKING PATTERNS, SEE STANDARD PLAN M- 20.10 -01.
INSTALL RAISED PAVEMENT MARKINGS PER STANDARD PLAN M- 20.30 -01.
C :1Work1ProjectWiseX
10:40 :04 AM
11/19/2010
dlo
A. SCHMIDTMAN
D. FRANKUM
J. ST. JOHN
L.HODGSON
D. DYE
JV00021dms022691BTJV0002 PS MK 405 -AB.d
AS -BUILT t NDC 126
IFC
REVISION
f1►
6. TYPE 2Y RPM PLACEMENT, SEE STANDARD PLAN M- 20.30 -01 AND SPACED \-,-W
80 FEET ON TANGENTS AND CURVES WITH RADIUS OF 5000 FEET OR MORE AND
40 FEET ON CURVES WITH RADII LESS THAN 5000 FEET.
7. TYPE 2W RPM SHALL BE SPACED 40 FEET.
8. FOR HOV LANE SYMBOL, SEE STANDARD PLAN M- 7.50 -01.
9. FOR TEMPORARY CONFIGURATIONS LASTING MORE THAN 30 DAYS, SEE STANDARD
PLAN M- 20.50.00 FOR RPM PLACEMENTS.
s 0. STS
REGION STATE FED,AID PROJ.NO. Q�` of . S/y O'
10 WAS ' Q rr rc`
JOB NUMBER
-t IV Aut-
11119/10 JMSJ CONTRACT NO. LOCATION NO:,
5122/08 MS C I 1
-7295
D E
DATE BY P.E. STAMP BOX
P.E. STAMP BOX
0 50 100
SCALE IN FEET
1i%
1 t
�Y�
12 � �s
1Z N
1Z 0
At 'Z
E405 1092 +41.27_
END 4 (56.00' RT)
E405 1090 +33.00 BEGIN Q5 (56.00' RT)
TP -E405 4090 +26.24
END 53.4:1 LANE TAPER (12.00' RT)
E405 1089 +41.27
POINT OF CONVERGENCE
PAVEMENT MARKING LEGEND
PLASTIC PROFILED LANE LINE
O PLASTIC PROFILED WHITE EDGE LINE
O3 PLASTIC HOV LANE SYMBOL (1000' SPACING)
�4 PROFILED PLASTIC WIDE LINE
O PROFILED PLASTIC DROP LANE LINE
O PROFILED PLASTIC YELLOW EDGE LINE
�7 PROFILED PLASTIC DOTTED EDGE LINE
O8 AERIAL SURVEILLANCE FULL MARKER
O9 AERIAL SURVEILLANCE HALF MARKER
10 WIDE LANE LINE
11 PROFILED PLASTIC DOUBLE YELLOW CENTERLINE
12 PROFILED PLASTIC WHITE DOTTED EXTENSION LINE
DATE
Ai►
( TAT Washington State
Department of Transportation
40 Corridor Program
DAVID EVANS
...ASSOCIATES ma.
1LFINGER BERGER . Q 415 - 118th Avenue SE
Civil Inc.
Bellevue 425 519 6500 005 -3518
_
I TRI- STATE CONSTRUCTION, INC
I agma ge-d
ME:X /1A- rInK1C
REDUCED MAINLINE SHOULDER AND LANE
OWIDTHS IN THE VICINITY OF GREEN RIVER AND
SR181 BRIDGES -APPROVED 4 -20 -09
REDUCED HORIZONTAL STOPPING SIGHT
ODISTANCE ON NORTHBOUND 1-405 IN TUKWILA
- APPROVED 4-7 -07
O1-405 HORIZONTAL CURVES WITH NON - STANDARD
SUPERELEVATIONS - APPROVED 4 -6 -07
1 -405
1 -5 TO SR169
STAGE 1 -WIDENING
PAVEMENT MARKING PLAN
A
Plot 2
MK2
1 -405
SHEET
131
OF
392
SHEETS