HomeMy WebLinkAboutT-269007i�
0
0
to
�Yr-
o
c�
dv W
W
Z !_
W
W
vy
T. 23
N., R. 4 E.,
W.M.
1405 STA 1161+97.91
I PAVEMENT MARKING LEGEND I
Q
PLASTIC PROFILED
LANE LINE
PLASTIC PROFILED
WHITE EDGE LINE
INTERSTATE �� Washington State
Department of Transportation
40 Corridor Program
or
DAVID EVANS
qN. ANDASSOCIATES mc.
BILFINGER BERGER 415 - 118th Avenue SE
Civil Inc. eeuevue Washington 98005 -3518
Phone: 425.519.6500
TRI -STATE CONSTRUCTION, INC.
PLASTIC HOV LANE
SYMBOL (1000' SPACING)
�4
PROFILED PLASTIC
WIDE LINE
STATE
PROFILED PLASTIC
DROP LANE LINE
O
PROFILED PLASTIC
YELLOW EDGE LINE
WAS
PROFILED PLASTIC
DOTTED EDGE LINE
8
AERIAL SURVEILLANCE FULL MARKER
JOB NUMBER
AERIAL SURVEILLANCE HALF MARKER
10
WIDE LANE LINE
8108108
PROFILED PLASTIC DOUBLE YELLOW CENTERLINE
PROFILED PLASTIC WHITE DOTTED EXTENSION LINE
DEVIATIONS
REDUCED MAINLINE SHOULDER AND LANE
WIDTHS ON NEW BRIDGE OVER SPRINGBROOK
CREEK AND OAKESDALE AVE -APPROVED 4-6 -07
REDUCED INSIDE SHOULDER WIDTHS AT SIGN &
BRIDGE LOCATIONS -APPROVED 3 -10 -09
FILE NAME
TIME
DATE
PLOTTED BY
DESIGNED BY
ENTERED BY
CHECKED BY
PROD. ENGR.
REGIONAL ADM.
C:XWorkiProjeotWisell
10:42:55 AM
11119/2010
dlo
A. SCHMIDTMAN
D. FRANKIIM
J. ST. JOHN
L.HODGSON
D. DYE
Rl
JV0002Xdms02269XBTJV0002 PS MK 406-ABA
AS -BUILT / NDC 126
NDC 79 - BARRIER REPLACEMENT
IFC
REVISION
END 51.0:1 LANE TAPER (64.47' RT)
BEGIN 38.5:1 RAMP TAPER (64.47' RT)
1. PLASTIC FOR PAVEMENT MARKINGS SHALL BE METHYL METHACRYLATE (MMA)
2. FOR PROFILED LINE DETAIL, SEE STANDARD PLANS M- 20.20 -01
3. SEE PAVEMENT MARKING DETAIL SHEET MKD1 FOR GORE AREA DETAILS.
4. AERIAL SURVEILLANCE MARKERS PER STANDARD PLAN M- 24.60 -02.
5. FOR LONGITUDINAL MARKING PATTERNS, SEE STANDARD PLAN M- 20.10 -01.
INSTALL RAISED PAVEMENT MARKINGS PER STANDARD PLAN M- 20.30 -01.
F-
6. TYPE 2Y RPM PLACEMENT, SEE STANDARD PLAN M- 20.30 -01 AND SPACED 80 FEET
ON TANGENTS AND CURVES WITH RADIUS OF 5000 FEET OR MORE AND
40 FEET ON CURVES WITH RADII LESS THAN 5000 FEET.
7. TYPE 2W RPM SHALL BE SPACED 40 FEET.
8. FOR HOV LANE SYMBOL, SEE STANDARD PLAN M- 7.50 -01.
9. FOR TEMPORARY CONFIGURATIONS LASTING MORE THAN 30 DAYS, SEE STANDARD
PLAN M- 20.50.00 FOR RPM PLACEMENTS.
0 50 100
SCALE IN FEET
CD
two
00
CD
�ui
W
z�
_j w
=W
U
Q
E
S 0. ST J
Q� of WASH �'S'
'y �0
�,�
lD 10
P.E. STAMP BOX
DATE
P.E. STAMP BOXY
INTERSTATE �� Washington State
Department of Transportation
40 Corridor Program
or
DAVID EVANS
qN. ANDASSOCIATES mc.
BILFINGER BERGER 415 - 118th Avenue SE
Civil Inc. eeuevue Washington 98005 -3518
Phone: 425.519.6500
TRI -STATE CONSTRUCTION, INC.
I -405
1 -5 TO SRI 69
STAGE 1 -WIDENING
PIOt 7
RENO N
STATE
FED.AID PROJ.NO.
MK7
1 -405
10
WAS
JOB NUMBER
SHEET
136
OF
392
SHEETS
11119110
MS
8108108
JM$
CONTRACT NO.
(; -7295
LOCATION NO.
PAVEMENT MARKING PLAN
5122108
MS
DATE
BY