Loading...
HomeMy WebLinkAboutT-26900Cii NOON 13 a To 23 No, Rn 5 E. WmMm END CONSTRUCTION E 181 20 +06.08 j/ i NB406 -SR181 14 +92.95 END 48.0:1 LANE TAPER (15.00' RT) D 24.0:1 LANE TAPER (30.00' RT) 12� 6' LT SR181 -NB405 11 +89.75 �r l i /// ` / ,'� RAMP /fCHANNELIZATION END CURVE (15.30' LT) / / / ' / SEE I ETAIL ON SHEET MKD1 BEGIN CURVE {15.3.0' LT) ,' / / r / ! / E181 19 +42.02 _ SR1$1 -NB405 11 +$9.32 r / / / Y / / i / PLASTIC STOP LINE 1� tSED ISLAND =175,00' BEGIN CURVE (0.70' RT) Hi` /l„ /l / ri l ;O, - T NB406 -SR181 15 +00.00 PLASTIC TRAFFIC ARROWS N (7.50' RT, 22.5' RT, 37.5' RT) NB406 -SR181 16 +07.71 END 7 (15.00' RT)-� BEGIN ® (15.00' RT) ` e NB406 -SRI SI 16 +7000 PLASTIC TRAFFIC ARROW (7.50' RT, 22.5' RT, 37.5' RT) \ R= 210.41° �, / l' I/ I / , E DETAIL ON SHEET PV D1 LANE LINE REMOVE PLASTIC PROFILED WHITE EDGE LINE O PLASTIC HOV LANE SYMBOL (1000' SPACING) os , _,HOV SYMBOL 01 O PROFILED PLASTIC DROP LANE LINE L/ PROFILED PLASTIC YELLOW EDGE LINE 07 PROFILED PLASTIC DOTTED EDGE LINE [�8 AERIAL SURVEILLANCE FULL MARKER !J9 AERIAL SURVEILLANCE HALF MARKER 10 WIDE LANE LINE DESIGNED BY A. SCHMIDTMAN A AS -BUILT 1 NDC 126 11/19110 JMSJ 1 FI P N - . PROFILED PLASTIC WHITE DOTTED EXTENSION LINE 12 k18 18 +15.56 9128109 MS CONTRACT NO. C -7295 LOCATION NO. I :Nb 6 (8.33° LT) 5/22/08 Ms PAVEMENT MARKING PLAN I REGIONAL ADM. D. DYE REVISION (19.33' LT) 24.67' RT) BY I t ' IEND ` 2 (343,3' LT) h -- -- ! , /,' `� �~ END 2.67' � ('C�.,67' RT) Wit, _ \ f \ S CUR8- .RET ' \ \ SEE DETAIL. ON - SHF,rT PVD2 ' E181 h 18 +23.56 CROSS WALK END Q (15.00' RT, 30.00' RT) / � � ' � - -E181 18 +15.56 PLASTIC STOP LINE 4 J 1 7\ PLASTIC STOP LINE CURB RETURN / / ry ; / Eli" 18 +00.00 SE DETAIL ON SHEET PVD1/ PLASTIC TRAFFIC ARROW (2.83' LT & 8.17' RT) E1$1 16 +$9.14 E�81 16 +73.00 BEGIN 2 {45.00' LT) / / - - VLASTIC TRAFFIC ARROW 11 / 14 / : 7 _ _ , (3.21' LT & 7.79' RT) _ E181 15 +43.00 PLASTIC TRAFFIC ARROW ` / 1 4 (3.21' LT & 7.79' RT) \ J/ / / E181 15 +36.30 END 8.4:1 6 TAPER ($.71' LT) BEGIN (4)(2.29# RT) BEGIN 4 (13.29' RT) E181 15 +52.30 END 62.1:1U2 TAPER (36.22'RT) / E181 14 +14.07 PLASTIC TRAFFIC ARROW (0.91' LT) BEGIN 8.4:1® TAPER (5.79' RT) �!t k END (4)(7.411 LT) / Cb E181 13 +64.08 PLASTIC TRAFFIC ARROW / (0.36' LT) / `IT r _ �kr Jf ! t r i t t ' E181 13 +42.85 BEGIN 52.1:1 T TAPER (32.20' RT) ! r E181 13 +14.08 1 r ' BEGIN 4 (6.86' LT, 29.86' LT) BEGIN 1 (18.36' LT, 18.84' RT) ti BEGIN 6 (6.34' RT) tJ tJ Jt' t � BEGIN CONSTRUCTION E181 13 +14.08 NOTES: 1. PLASTIC FOR PAVEMENT MARKINGS SHALL BE METHYL METHACRYLATE (MMA). 2. FOR PROFILED LINE DETAIL, SEE STANDARD PLANS M- 20.20 -01 3. SEE PAVEMENT MARKING DETAIL SHEET MKD1 FOR GORE AREA DETAILS. 4. AERIAL SURVEILLANCE MARKERS PER STANDARD PLAN M- 24.60 -02 5. FOR LONGITUDINAL MARKING PATTERNS, SEE STANDARD PLAN M- 20.10 -01. INSTALL RAISED PAVEMENT MARKINGS PER STANDARD PLAN M- 20.30 -01. 0 50 100 SCALE IN FEET 6. TYPE 2Y RPM PLACEMENT, SEE STANDARD PLAN M- 20.30 -01 AND SPACED 80 FEET ON TANGENTS AND CURVES WITH RADIUS OF 5000 FEET OR MORE AND 40 FEET ON CURVES WITH RADII LESS THAN 5000 FEET. 7. TYPE 2W RPM SHALL BE SPACED 40 FEET. 8. FOR HOV LANE SYMBOL, SEE STANDARD PLAN M- 7.50 -01. 9. FOR TEMPORARY CONFIGURATIONS LASTING MORE THAN 30 DAYS, SEE STANDARD PLAN M- 20.50.00 FOR RPM PLACEMENTS. T=26900C FILE NAME C:XWork \Project Wise\ BTJV00021dms02269XBTJV0002 PAVEMENT MARKING LEGEND �1 PLASTIC PROFILED LANE LINE �2 PLASTIC PROFILED WHITE EDGE LINE O PLASTIC HOV LANE SYMBOL (1000' SPACING) 04 PROFILED PLASTIC WIDE LINE O PROFILED PLASTIC DROP LANE LINE L/ PROFILED PLASTIC YELLOW EDGE LINE 07 PROFILED PLASTIC DOTTED EDGE LINE [�8 AERIAL SURVEILLANCE FULL MARKER !J9 AERIAL SURVEILLANCE HALF MARKER 10 WIDE LANE LINE DESIGNED BY A. SCHMIDTMAN A AS -BUILT 1 NDC 126 11/19110 JMSJ 1 FI P O C 1 12 PROFILED PLASTIC WHITE DOTTED EXTENSION LINE 13 TYPE Y GUIDEPOST STD PLAN H -1 FILE NAME C:XWork \Project Wise\ BTJV00021dms02269XBTJV0002 _PS_MK 405- AB.dgn S 0. S T. t/ tC. W � P� of SH,� ti� ! l / '` R� D E P.E. STAMP BOX DATE P.E. STAMP BOX I TE T �Washington State CIA Department of Transportation 40 Corridor Program DAVID IATES � Q wNOASSOCIATE8�nc. BILFINGER BERGER . 415 - 118th Avenue SE Civil Inc. Beilevhone. 425 519.6500 005 -3518 rd TRI -STATE CONSTRUCTION, INC. q---f .v� Iffil - 1 405 1 -5 TO SRI 69 STAGE 1 -WIDENING Plot 12 TIME 10:43:53 AM REGION NO. STATE FED.AID PROJ.NO. MK12 1 -405 DATE 11/1912010 10 WAS PLOTTED BY dlo DESIGNED BY A. SCHMIDTMAN A AS -BUILT 1 NDC 126 11/19110 JMSJ JOB NUMBER SHEET /�A 14 1 OF 392 SHEETS I ENTERED BY D. FRANKUM NDC 124 - CHANNELIZATION REVISIONS 02/25110 MS CHECKED BY J. ST. JOHN 1 NDC 119 - RAMP CHANNELIZATION REVISIONS 9128109 MS CONTRACT NO. C -7295 LOCATION NO. I PROJ. ENGR. L. HODGSON tFC 5/22/08 Ms PAVEMENT MARKING PLAN I REGIONAL ADM. D. DYE REVISION DATE BY I