Loading...
HomeMy WebLinkAboutT-26902411 6" X 6" X 4" NEMA 4X JUNCTION BOX WITH I FOR 1 1/2" DIA. THREAC CONNECTION. SEE PLAI FOR LOCATION FILE NAME TIME DATE PLOTTED BY DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM. SEE *AS REQUIRED TO MATCH LUMINAIRE ATTACHMENT LOCATIONS. 1 14 9;1 INSTALL 1/2" MIN. STAINLESS STEEL MECHANICAL ANCHOR PER MANUFACTURES REQUIREMENTS 12 GI UNUCKUCUM LUMINAIKC. ATTACH TO THREADED RODS PER MANUFACTURER'S REQUIREMENTS. SEE SHEET IL3 FOR LOCATIONS. 'Ile .� 66TH AVE. S. BRIDGE NOT TO SCALE STEP 1 -TURN OUTER NUT TO ALIGN VERTICAL HANGER RODS STEP 2 -AFTER PROVIDING A TIGHT FIT BETWEEN FABRIC PAD AND GIRDER WEB, TURN OUTER NUT ONE FULL TURN AWAY FROM CONCRETE (TYP. FOR BOTH ENDS OF HORIZONTAL BRACING) STEP 3 -TURN INNER NUT 1/3 TURN AGAINST STEEL BAR AFTER SNUG TIGHTENING L 3'/2X 3'/2X3/8 ( AASHTO M 183) \— 7/8' BOLT ( AASHTO M 164) 1/2" STEEL BAR 4" X 4" SQUARE ( AASHTO M 183) '/2' FABRIC PAD 4'X 4' SQUARE, BOND TO STEEL BAR WITH APPROVED EPDXY. DETAIL A C: XWorkiProjectWiseiBTJV0002 \dms022691BTJV0002 D 2:28:41 PM 8/1912010 dlo J. GELLINGS D. FRANKUM K. OSWELL L.HODGSON r r NOTE: ALL MATERIALS SHALL BE GALVANIZED AFTER FABRICATION PER AASHTO M 111 OR AASHTO M 232 405- AB.dan AS -BUILT ISSUED FOR CONSTRUCTION REVISION ROD, SIZED TO tE ATTACHMENT 1/2" MIN. K 3/8 OSEE ITD 27 FOR CONDUIT SUPPORT DETAILS. DELETE THE REFERENCE TO THE ATTACHMENT BOLT. INSTALL 114 OR 5/16 INCH STAINLESS STEEL POWER BOLT, KWIK BOLT OR APPROVED EQUAL MECHANICAL ANCHORS WITH A 1 1/2 INCH MAX. PENETRATION DEPTH. ATTACHMENT LOCATION IN GIRDERS SHALL BE APPROVED BEFORE INSTALLATION. 1/2" STEEL BAR 4" X 4" SQUARE ( AASHTO M 183) , L 3 1/2 X 3 1/2 X 3/8 ( AASHTO M 164) I 1/4_ —.. CV ' C14 ' 1/4 N ( N i 2 I 2.. No I Y_ STEEL BAR, FABRIC PAD, 7/8" DIA BOLT & 1" DIA HOLE SECTION B REGION STATE NO. 10 WASI JOB NUMBER 716110 J MS CONTRACT NO. 6/16/2008 KOO 0,_7295 DATE BY FED.AID PROJ.NO. LOCATION NO. 1/411 2" 1 211 TYP. I CC 1" DIA HOLE FOR 7/8" BOLT SECTION C � *aT Hf � c Q of A Sys Fl CD c-) �0 43352 MFG l S T E. R�`O G\ FSSI4NAL EN P.E. STAMP BOX DATE AdW FA S 0. ST. E Washington State J 0 IN im o f W A s1l 5 W Department of Transportation 0 Corridor Y w 1� DA P.E. STAMP BOX DAVID EVANS y iLFiNGER BERC:ER AmDASSOCIATES me. „ 415 - 118th Avenue SE Bellevue Washington 98005 -3518 Civil Inc. Phone: 425.519.6500 TRI -STATE CONSTRUCTION, INC f;envca� C`anL�cxcEarg SAEET OF SHEETS