HomeMy WebLinkAboutT-26903AJ_
D
in
ch
I'll
GENERAL NOTES
1. SEE ITS PLANS FOR ADDITIONAL NOTES.
2. SEE TEMPORARY ILLUMINATION PLANS FOR
POWER AND ADDITIONAL NOTES.
3. WAVETRONIX SOFTWARE SHALL BE
REPROGRAMMED FOR EACH LANE
RECONFIGURATION THROUGHOUT THE
WIDENING WORK.
N
{
i
1
1
P sV+
r
i4
�9W DMDY l✓1�
o
T. 23 N., R. 5 E., W.M. LEGEND
EXISTING
NEW
EXISTING
CONDUIT
.L
EXISTING
CONDUCTOR
ELECTRICAL SERVICE CABINET
--
m
CCTV CAMERA
1-405
1 -5 TO SR169
STAGE 1 - WIDENING
- - --
CONDUIT
cv,
ILI]
ITS CABLE VAULT
.._,
1—ml
ITS PULL BOX
®
ES CONTROLLER CABINET
WILT
Iwo
WAVETRONIX SENSOR
EE]
D9z
TIMBER POLE WITH DOWN GUY
1-6SMFO
LIGHT STANDARD TIMBER HIGH MAST
i,
G
JUNCTION BOX TYPE 7
AERIAL
®
CC CABINET
LT,
❑T
TRANSFORMER CABINET
ti
1 -6SMFO
DATA LATERAL FROM ES-619D TO CABLE VAULT
204
G
BY
AERIAL
2 -•6 TRIPLEX_
AERIAL POWER FROM SUA 1235 TO CC -620
i-6SMFO
DATA LATERAL FROM CC-620 TO CABLE VAULT
205
1 ""
1-6SMFO
DATA LATERAL FROM CC-620 TO CABLE VAULT
CONSTRUCTION NOTES
tm MOUNT EXTERNAL ANTENNA ONTO CABINET AND INSTALL WAVETRONIX INTERFACE EQUIPMENT TO COMMUNICATE
WIRELESS DATA FROM THE POLE MOUNTED SENSOR TO THE ES 170 CONTROLLER. INSTALL 12 -PORT PATCH
PANEL AND TERMINATE 1 -6 SMFO CABLE. INSTALL OPTELECOM MODEL 9522 DROP /INSERT DATA MODEM.
t4f INSTALL WAVETRONIX SMARTSENSOR HD125 (WIRELESS DATA TRANSMITTER TO ES CABINET) 25' ABOVE
ROADWAY SURFACE ON POLE TI.
tw INSTALL 25' WOOD POLE WITH RISER.
tW RELOCATE EXISTING T -620 CABINET AND CC -620 CABINET NEAR THE EXISTING POLE T3 ON A TEMPORARY
BASE. SECURE EACH CABINET TO THE BASE.
t% RELOCATE EXISTING CCTV -620 CAMERA 50" ABOVE ROADWAY SURFACE ON POLE T3.
t% RELOCATE EXISTING VMS AND VMS-620 CABINET. SEE ITS 10 FOR ADDITIONAL INFORMATION.
Otm SPLICE 2 FIBERS FROM CC -620 CABINET AND 4 FIBERS FROM ES-619D CABINET TO THE 48 -SMFO
DISTRIBUTION CABLE IN CABLE VAULT.
HARE NOTES
SCALE IN FEET
a
RUN
F
SERVICE
CKT
EXISTING
CONDUIT
NEW TEMP.
CONDUIT
EXISTING
CONDUCTOR
NEW
CONDUCTOR
REMARKS
201
��°°'^` ":' ^`" °'
iU5J Corridor Program
0 �
iivixc[n BERG.R
• �T -NT 1ATELONSTRUCI'10N, me
1-405
1 -5 TO SR169
STAGE 1 - WIDENING
1 "
1-6SMF0
DATA LATERAL FROM ES-619D TO CABLE VAULT
202
G
PLOTTED BY III.
AERIAL
2-•8 TRIPLEX
AERIAL POWER FROM SUA 1235 TO WAVETRONIX
WILT
Iwo
2-•6 TRIPLEX
AERIAL POWER FROM SUA 1235 TO CC -620
D9z
1-6SMFO
DATA LATERAL FROM ES-619D TO CABLE VAULT
203
G
AERIAL
C -72y5
2-•6 TRIPLEX
AERIAL POWER FROM SUA 1235 TO CC -620
BBUED AT ruMC
oxt4AM
ti
1 -6SMFO
DATA LATERAL FROM ES-619D TO CABLE VAULT
204
G
BY
AERIAL
2 -•6 TRIPLEX_
AERIAL POWER FROM SUA 1235 TO CC -620
i-6SMFO
DATA LATERAL FROM CC-620 TO CABLE VAULT
205
1 ""
1-6SMFO
DATA LATERAL FROM CC-620 TO CABLE VAULT
1 -CCC
CAMERA CONTROL CABLE
206
i"
2 -•6
POWER FROM SUA 1235 TO CC -620
207
1
2 -•8
POWER FROM TRANSFORMER TO CC -620
208
i ""
2 -6SMFO
DATA LATERALS FROM CC-620 & ES-619D
TIYE r:%: %AN
_ _ _ -._._.
w nre
FEDAID PROJ.NO.
u •
�
S V �
re
°
W—I
��°°'^` ":' ^`" °'
iU5J Corridor Program
0 �
iivixc[n BERG.R
• �T -NT 1ATELONSTRUCI'10N, me
1-405
1 -5 TO SR169
STAGE 1 - WIDENING
ITS 11
Il
10 AB
PLOTTED BY III.
DESIGNED BY R. JAHNB
WILT
Iwo
°'"'�'
D9z
ECKED BY M. MADDEN
REVMIDN6
C -72y5
PRQI. ENDR LHODIS6ON
BBUED AT ruMC
oxt4AM
ti
TEMPORARY ITS PLAN
REGIDNAL ADR D. DYE
REVISION
DATE
BY