Loading...
HomeMy WebLinkAboutT-269080J_ M� W N Q m MSIOA 140.5 1- 5YMETRICAL BARRIER d POST MEDIAN BARRIER 6'- 0'x5' -7 MAINTENANCE WALKWAY. SEE STO. PLAN G6, AND G -6y SIGN NO. 62A SIGN NO 62 51ON NO. Cl VM5 T MAINTENANCE I CE: WALKWAY. WALKWAY. SEE SID. PLAN 6-6, G -6v, AND BHT. M57A MAINTENANCE WALKWAY ON BACK OF STRUCTURE, SEE T0. PLAN � 0-6. G -bn. AND BHT. MSJA PAVEMENT SIGN LIGHTING FIXTURE (IF REQ'D.) SEE stD. FLAN 6-9e APPROX. ELEV. 96.27 € POST I SHOULDER OF ROADWAY ON THE SIDE OF THE BEAM AS THE SIGN SEE NEMA BR TERMINAL CABINET I DETAIL. (DELETE IF NO ELECTRIC, ITEMS ON THE SIGN STRUCTURE). x'17 RECTANGULAR TUBE I SEE DETAIL q I MSIOA 1.0 ELEVATION ' :, j �1'D SLEEVE. CONSTRUCT Q SPAN LOOKING AHEAD ON STATION`. REINFORCED FILL CAMBER_3 *" zF }. AROUND SLEEVE. ` *\�� CONSTRUCT SHAFT < IEVEL� I/ € CAMBER x 095 MONOTUBE SIGN STf;UGTURE N0. 5 NOrE: CO.PIrFtY FILLING LOMPLETEIS SLEEVE p 1 -405 LINE 5TA. 1137 +53 FOR DIMENSIONS NOT SHOWN SEE TABLE SLEEVE WITH SHAFT STANDARD MONOTUBE SIGN BRIDGES, CONCRETE. i w - BHT. MS3A • • �� I REINFORCED FILL BEAM CAM TOR5ER DIAGRAM 1 - 269080 RLE NAME C:IWPNM WTJV0003W nsI%NM91EBBTJVOPSMB .dW THE 3:10:30 PM — mn FEDAID PROJ.NO. y °M tS M. SW,VOy app W 1�5 PIOt1 PLOTTED BY 0b A8 BUILT9`• ,q,Z MST DATE WB2010 TreRO To AS s 4Q,5 Corridor Program I -5 TO SR159 MS DESIGNED BY A. DIEDRICH STA., SIGN SIB S NO., SPAN .POST HT. `� a D] STAGE 1 -WIDENING ENTERED BY C.SCHREINER I AMC MARR W. S ELEV. 101W. SLOPE, wn� xe ° ° /er.0 aa0�` $ rlxeex BExeen BSS CHECKED BY R TURPINIL. SHAN(1 MAIN,. WALK NDC ]] OMSYOB RB °"^^^m •> �� w I M .r mTd°-° PRO). EMGR LHODGSON IFC tU0810T RB C -7295 DI 4�_I��?o r�lu -sr° ATE COrvsmucnoN, Inc MONOTUBE SIGN STRUCTURE N0.5 392 REOIONAL ADM. D. DYE RENMION WTE BY n x"x