HomeMy WebLinkAboutT-26909BIRK
T
CHANNELIZATION PLAN DESIGN SUMMARY
AP CV 405- CP.dgn
e e
,0 9 7 �¢
s G\
S/ EN
NAL
I to
DATE
P.E. STAMP sox
DESIGN DATA FOR INTERSTATE, I -1 MOBILITY
TIME 8:12:21 AM
RENO N
STATE
FED.AID PROJ.NO.
DATE 8!24/2010
10
WASH����
PLOTTED BY d10
_
I -405
_DESIGNED BY A. SCHMIDTMAN
eoe NUMBER
ENTERED BY L. JOHNSON
FUNCTIONAL CLASS
URBAN INTERSTATE (DESIGN MATRIX 1 -12)
CHECKED BY J. STOHN
J
CONTRACT NO.
DESIGN
CLASS
I -1
REGIONAL ADM. D. DYE
_
REVISION
DATE
BY
ACCESS
CONTROL
FULL ACCESS CONTROL
TERRAIN
ROLLING
NB
SB
TUKWILA
NB I-405
SR 181
SR 181
SR 181
NB I -405
NB SR167
SB SR167
NB405 -NBCD
1 I -405
I -405
PKWY TO
TO
TO
TO
TO
TO
TO
NB I -405
SR 181
NB I -405
SB I -405
SB SR167
SB I -405
SB I -405
DESIGN
SPEED
60 MPH
60 MPH
60 MPH
60 MPH
60 MPH
60 MPH
_
40 MPH
45 MPH
60 MPH
60 MPH
60 MPH
@ GORE
G GORE
@ GORE
@ GORE
@ GORE
c GORE
@ GORE
@ GORE
25 MPH MIN
25 MPH MIN
25 MPH MIN
25 MPH MIN
35 MPH MIN
5 MPH MIN
35 MPH MIN
60 MPH MIN
POSTED
SPEED
60 MPH
60 MPH
25 MPH
25 MPH
25 MPH
25 MPH
40 MPH
35 MPH
25 MPH
35 MPH
60 MPH
DESIGN
VEHICLE
WB -67
WB -67
WB -67
WB -67
WB -67
` WB -67
WB -67
WB -67
WB -67
WB -67
WB -67
IRK
T
FILE NAME C: 1WorkIProjectWiseIBTJV00021dmsO22731BTJV0002
AP CV 405- CP.dgn
e e
,0 9 7 �¢
s G\
S/ EN
NAL
I to
DATE
P.E. STAMP sox
P.E. STAMP BOX
TIME 8:12:21 AM
RENO N
STATE
FED.AID PROJ.NO.
DATE 8!24/2010
10
WASH����
PLOTTED BY d10
_
_DESIGNED BY A. SCHMIDTMAN
eoe NUMBER
ENTERED BY L. JOHNSON
_
CHECKED BY J. STOHN
J
CONTRACT NO.
LOCATION NO.
PROJ. ENGR. L. HODGS_ON
REGIONAL ADM. D. DYE
_
REVISION
DATE
BY