Loading...
HomeMy WebLinkAboutT-26909DLEGEND 117'-12' HMA CL. A" PG 64-22 CRUSHED SURFACING BASE COURSE GP GP GP GP SHLD PETROTAC (APPLY ON ALL JOINTS) DATE P.E. STAMP SOX EXISTING PCCP 1-405 MP 0.25 TO MP 2.77 1-406 1-5 TO SR1 69 STAGE 1 -WIDENING KING COUNTY JULY 2010 EXISTING HMA GENERAL NOTES: t ALL SURFACING AND PAVING DEPTHS ARE FINAL COMPACTED DEPTHS. SEE THE STANDARD SPECIFICATIONS FOR MAXIMUM LIFT PER MATERIAL DEPTH, 2. ROADWAY EMBANKMENT MAY BE CONSTRUCTED USING COMMON BORROW PER WSDOT STANDARD SPECIFICATIONS. VARIES <�2 7 SB (t SB405-S VARIES VARIES VARIES VARIES VARIES EXISTING GUARDRAIL 81-10, 12' 0'-12' 0!-14' 12'-24' U-16 SS405-S 1076+42.32 - - ___ - - - - - I - 12 GP GORE GP TO 1078+92.32 GP SHLD/ SHLD GORE II i - - - - - - - - - - - - - - L -- ------ - -4 - -- 4 VARIES 4,7'-5.3' - - --° SHLD 12' 6 ROADWAY SECTION A PROFILE GRADE EXISTING CROWN HOV SHLD! N.T.S. GORE SB406-S 1076+42.32 TO SB405-S 1081+78.74 5 SHLD SB406-S 1080+69.40 TO SB405-S 1081+78.74 VARIES <� L S13 SB405-S 10' 12' 12' 12' SHLD GP GP GP VARIES 10'-13' 12'_ SHLD GP E406 1091+27-63 TO E406 1091+80.00 SHLD 5 9 ----------------------------------- 4 8 13 VARIES 10, 0'-12' 12' 8& SHLD ON/OFF Gp 0 \\ �V 0.88' �,' 0.38' 2 Fn E405 1086+18.30 TO E406 1094+54.34 1'3 RET. WALL E405 1089+28.43 TO 3 E406 1091+06.88 )1 (WALL 4100, SEE SHEET WA1� 11 BARRIER RETAINING WALL E405 1089+06.61 TO E406 1089+28.4t, E406 1091+06.88 TO E406 1091+27.63 1 (SEE SHEET WAD4) GUARDRAIL (E405 1091+80.00 TO E405 1094+54.34) 2' , <� :EXTRUDED CURB (E405 1091+80.00 TO E405 1094+54.34) BARRIER (E405 1102+34.98 TO E405 1105+15.66) 0.38' EXTRUDED CURB (E405 1094+5434 TO E405 1095+00.00) E405 1094+54.34 TO E405 1099+06.00 VARIES 7.5'-10' SHLD 12' 12' ON/OFF GP 0.881 0.38' 2 E406 1099+06.00 TO E406 1105+15.66 9 GUARDRAIL > (E405 1099+08,00 TO E405 1102+34.98) \'< � EXTRUDED CURB (E405 1102+00.00 TO E405 1102+34.98) rt E405 1, VARIES I VARIES 12' 5.3'-7° 4'-7' HOV SHLD I SHLD q =Q129 KIDAnr NOTES: CROSS SLOPE VARIES, SEE SUPERELEVATION DIAGRAM ON PROFILE AND SUPERELEVATION SHEETS (AS APPLICABLE) OR MATCH EXISTING. FOR LANE TAPERS,SEE PAVEMENT MARKING PLAN. CONCRETE BARRIER.SEE STANDARD PLAN C-16a FOR EMBEDMENT CROSS SLOPE ON SHOULDER VARIES. SEE SHOULDER SLOPE DETAIL ON SHEET PVD3. DOWEL BAR RETROFIT PCCP PANELS, FOR WHAT IS CURRENTLY THE OUTSIDE LANE. CLEAN AND SEAL EXISTING TRANSVERSE AND LONGITUDINAL JOINTS. THE PORTION OF PCCP PANELS BEING REPLACED DO NOT REQUIRE DOWEL BAR RETROFIT. SEE PV PLANS FOR LIMITS. SHOULDER IS USED WHEN RAMP METERING IS IN OPERATION. FOR WORK ON THE S8405-S LINE SEE MKI-2. THERE WILL BE NO PAVING ON THIS LINE. WHERE THE EXISTING PCCP EXTENDS INTO THE EXISTING SHOULDER, THE PCCP SHALL BE SAWCUT TO FULL-DEPTH SO THE N13 REMAINING PCCP PAVEMENT WIDTH MATCHES THE WIDTH OF THE 2' PROPOSED LANE. THE EXCESS PCCP SHALL BE COMPLETELY VARIES 1 VARIES VARIES VARIES VARIES VARIES REMOVED AND REPLACED IN ACCORDANCE WITH WSDOT STANDARD 11.7'-12' 1H0_v > 1LD SHLD 5 12' T 12' 8 lEXISTING CROWN [o6j.jNw&ffiwq"g1ql -0 11.7'-12' 11.7'-12' 117'-12' 11.7'-12' 19'-114' OM111VIN D-ul. ri y i SLOPE TREATMENT VARIES. SEE SHEET RS6. GP GP GP GP SHLD <�> DATE P.E. STAMP SOX I ER '1111111111h� Washington State on f7wDepartment of Transportati Corridor Program =5 Elm DAVID *VANIS BILFIINGRR BERGER F "I moA99OOIATll6#m. I Civil Inc. 10M TFU-STATE CONSTRUCTION, INC. 1-405 MP 0.25 TO MP 2.77 1-406 1-5 TO SR1 69 STAGE 1 -WIDENING KING COUNTY JULY 2010 EXISTING CONCRETE BARRIER TO REMAIN. TIME 8:18:00 AM E405 1084+06.22 TO E406 1105+05.38 < 1L "q> L DOWEL BAR RETROFIT PCCP PANELS. CLEAN AND SEAL <8> EXISTING TRANSVERSE AND LONGITUDINAL JOINTS. STATE FED.AID PR01NO. 1. ---------------------------------------- 13 E405 1106+05.38 TO E405 1107+85.91 WASH SEE SP AND PV SHEETS FOR LOCATION OF SAWCUTS. SB406-S 1081+78.74 TO SB406-S 1084+06.18 (LT) \BTJV0002_DE_RS_405- CP.dgn ESBS-NB406 2017+39.83 TO ESB6-NB405 2019+67.29 (RT) DATE P.E. STAMP SOX I ER '1111111111h� Washington State on f7wDepartment of Transportati Corridor Program =5 Elm DAVID *VANIS BILFIINGRR BERGER F "I moA99OOIATll6#m. I Civil Inc. 10M TFU-STATE CONSTRUCTION, INC. 1-405 MP 0.25 TO MP 2.77 1-406 1-5 TO SR1 69 STAGE 1 -WIDENING KING COUNTY JULY 2010 Plot 1 TIME 8:18:00 AM E405 1084+06.22 TO E406 1105+05.38 RE43ION NO. STATE FED.AID PR01NO. BRIDGE (INCLUDING APPROACH SLABS) (NO PAVING) ---------------------------------------- 2' E405 1106+05.38 TO E405 1107+85.91 WASH PLOTTED BY dlo--- j DESIGNED BY A. SCHMIDTMAN STATION EQUATION TP-E405 VARIES I VARIES VARIES 2 ' SHEET S OF so SHEETS - a- GP 10, SHLD SS406-S 1084+06.18 (LT) = E405 1084+06.22 (20'LT) 12' 9-22' 12'-17.5- 2.9 ° -14' CONTRACT NO. LOCATION NO. PROJ. ENGR. L. HODGSON ESB5-NB405 2019+67.29 (RT) = E405 1084+11.50 (20' RT) 1 REGIONAL ADM. D. DYE REVISION DATE BY TP-E405 4087+28.10 (73.68' RT) = E406 1087+39.68 GP GORE 1 GP SHLD > fA 3 9 9 - - - - - - - - -- WSDO T NOR THWES T REGION CHANNEL IZA TION FL AN TRAFFIC ENGINEER - A OPERATIONS Signed '�IAAA /� a > Date Print MARK BANDY ENGINEERING MANAGER Signed Lu4t a- &�� Date 9­ib-fo Print DENISE CIERI 1 0.88' O.38'__,,/ RET. WALL 2 E405 1087+39.68 TO E406 1090+80.00 L E405 1087+39.68 TO E405 1089+86.23 (WALL 4007, SEE SHEET WAI) r1w.] ESB-NB406 2017+39.83 TO E406 1087+39.68 T- 26909D FILE NAME C:\ WorkIProjectWisetBTJV00021dmsO2273 \BTJV0002_DE_RS_405- CP.dgn �f WASil sF 10 DAfE P.E. STAMP BOX DATE P.E. STAMP SOX I ER '1111111111h� Washington State on f7wDepartment of Transportati Corridor Program =5 Elm DAVID *VANIS BILFIINGRR BERGER F "I moA99OOIATll6#m. I Civil Inc. 10M TFU-STATE CONSTRUCTION, INC. 1-405 MP 0.25 TO MP 2.77 1-406 1-5 TO SR1 69 STAGE 1 -WIDENING KING COUNTY JULY 2010 Plot 1 TIME 8:18:00 AM RE43ION NO. STATE FED.AID PR01NO. RS I DATE 812412010 10 WASH PLOTTED BY dlo--- DESIGNED BY A. SCHMIDTMAN JOB NUMBER SHEET S OF so SHEETS ENTERED BY L. JOHNSON CHECKED BY J. STJOHN CONTRACT NO. LOCATION NO. PROJ. ENGR. L. HODGSON ROADWAY SECTIONS REGIONAL ADM. D. DYE REVISION DATE BY