Loading...
HomeMy WebLinkAboutT-26909EVARIES VARIES _ --- -- - --1 81 14.5' -17' 3' -16' 1 ° SHLD ON/OFF GORE I i 1 VARIES e 8' -10' ° SHLD Y 0.38' (5 0.88' I 1 E405 1108 +07.30 TO E405 1108 +60.02 I E406 1113 +47.88 TO E406 1113 +69.13 VARIES 'In, �=t Al1e A AI 1 10 __ARI ,-r 1 - - - -- vl�5) -- - - - - -- f 0 E406 1108 +60.02 TO E405 1108 +85.41 2% o 0 5 E405 1108 +86.41 TO E405 1108 +98.26 PAVED VARIES SLOPE 10, 15' 4'-4 4' A�( _RIE�S SHLD ON L �"( VARIES VARIES 11' -11.7' 11' -11.7' VARIES GP 3'-6.6' VARIES - 2' -5.5' VARIES VARIES 11' -117 11' -11.7' ��mmoffir*VA 0 4 8 13 0.88' 1 0.38' 2 EXISTING CROWN GUARDRAIL (1108 +85.41 TO 1110 +40.44) (SEE PV SHEETS FOR TRANSITIONS) (SEE PV SHEETS FOR TRANSITIONS) GUARDRAIL (SEE PV SHEETS FOR TRANSITIONS) _ ARIES 2% o/ E406 1108 +98.26 TO E406 1109+10.00 0'38' �2 VARIES rt E405 If" !uIldpw, !rte I 8.5' 8' VARIES 2' -5.5' VARIES VARIES 11' -11.7' 11'- 111' -117' HOV I GP 2% D_0.201 EXISTING CROWN N.T.S. E405 1107 +85.91 TO E405 1113 +69.13 SR181 BRIDGE LIMITS (NO PAVING) E405 1113 +69.13 TO E405 1115 +92.65 VARIES 11' 11' 11' HOV GP GP m VARIES VARIES 11' -11.7' 11' -11.7' GP GP VARIES 6.4' -10.3' ° 4 I 13 8 ° ° 1 0.88` LIM WSDO T NOR THWES T REGION CHANNEL IZA TION PL AN GUARDRAIL DENISE CIERI E405 1108 +85 TO 1111 +91 P r i n t O --- - NB40 SR181 " 1 VARIES VARIES VARIES ° 11' -11.7' 10' -27' 15' -27' 81 GP GORE GP SHLD -------------- _.._.'..�_® _- - - - - -- - 2' I ° 5s- _- _- _- _ - - - - ®- --go 3 SHLD E406 1107 +85.91 TO E405 1109 +27.00 0.88, 1 E405 1112 +67.00 TO E405 1113 +69.13 1 0.3 13 E405 1108 +72.49 TO E405 1109+27.00 E405 1108 +72.49 = NS405 -SR181 10 +98.31 (72.54' RT) QHMA CL.' /" PG 64 -22 ROADWAY SECTION D N.T.S. E405 1115 +92.65 TO E405 1122 +80.00 E405 1109 +27.00 = NB405 -SR181 11 +53.49 (80.34° RT) i- 1BTJV0002_DE_RS 405- CP.dgn NOTES: TIME SB E4051 3 PETROTAC (APPLY ON ALL JOINTS) 1 CROSS SLOPE VARIES, SEE SUPERELEVATION DIAGRAM ON PROFILE AND SUPERELEVATION SHEETS (AS APPLICABLE) OR MATCH EXISTING. C�4 VARIES VARIES 8' 0' -13' 0'-16' VARIES 11' -24' FOR LANE TAPERS, SEE PAVEMENT MARKING PLAN. VARIES I VARIES 1.8' - 10° ! L8'- 2.Q ' EXISTING HMA SHLD GP GORE GP GP GP HOV SHLD ' SHLD 10 FOR EMBEDMENT _ � 1 q> j 10 f�r -- ----- _- _ - -__�0 ------------------------ SHLD 5 ENTERED BY _ -/ - - -- - - 4 - - --- 0.20' ° 1 CHECKED BY 8.5' 8' 11' 11' 11' HOV GP GP m VARIES VARIES 11' -11.7' 11' -11.7' GP GP VARIES 6.4' -10.3' ° 4 I 13 8 ° ° 1 0.88` LIM WSDO T NOR THWES T REGION CHANNEL IZA TION PL AN GUARDRAIL DENISE CIERI E405 1108 +85 TO 1111 +91 P r i n t O --- - NB40 SR181 " 1 VARIES VARIES VARIES ° 11' -11.7' 10' -27' 15' -27' 81 GP GORE GP SHLD -------------- _.._.'..�_® _- - - - - -- - 2' I ° 5s- _- _- _- _ - - - - ®- --go 3 SHLD E406 1107 +85.91 TO E405 1109 +27.00 0.88, 1 E405 1112 +67.00 TO E405 1113 +69.13 1 0.3 13 E405 1108 +72.49 TO E405 1109+27.00 E405 1108 +72.49 = NS405 -SR181 10 +98.31 (72.54' RT) QHMA CL.' /" PG 64 -22 ROADWAY SECTION D N.T.S. E405 1115 +92.65 TO E405 1122 +80.00 E405 1109 +27.00 = NB405 -SR181 11 +53.49 (80.34° RT) C:% WorldProjeetWise\ BTJV0002tdms02273 1BTJV0002_DE_RS 405- CP.dgn NOTES: TIME CRUSHED SURFACING BASE COURSE 3 PETROTAC (APPLY ON ALL JOINTS) 1 CROSS SLOPE VARIES, SEE SUPERELEVATION DIAGRAM ON PROFILE AND SUPERELEVATION SHEETS (AS APPLICABLE) OR MATCH EXISTING. C�4 EXISTING PCCP O FOR LANE TAPERS, SEE PAVEMENT MARKING PLAN. 10 EXISTING HMA $ ? CONCRETE BARRIER. SEE STANDARD PLAN C-16a DESIGNED BY FOR EMBEDMENT _ CROSS SLOPE ON SHOULDER VARIES. SEE SHOULDER SLOPE ENTERED BY _ DETAIL ON SHEET PVD3. VARIES VARIES VARIES 11' 0' -8' 12' -23' 6' -13.3' GP GORE I GP SHLD Jai l o c a l I I I� - - - EXISTING 0.20' RETAINING 1 4 SHLD 5° ° WALL EXISTING CROWN DOWEL BAR RETROFIT PCCP PANELS, FOR WHAT IS CURRENTLY 5 THE OUTSIDE LANE. CLEAN AND SEAL EXISTING TRANSVERSE AND LONGITUDINAL JOINTS. THE PORTION OF PCCP PANELS BEING REPLACED DO NOT REQUIRE DOWEL BAR RETROFIT. SEE PV PLANS FOR LIMITS. 6 J SHOULDER IS USED WHEN RAMP METERING IS IN OPERATION. FOR WORK ON THE SB405 -S LINE SEE MK1 -2. \v" THERE WILL BE NO PAVING ON THIS LINE. WHERE THE EXISTING PCCP EXTENDS INTO THE EXISTING SHOULDER, THE 8 PCCP SHALL BE SAWCUT TO FULL -DEPTH SO THE REMAINING PCCP PAVEMENT WIDTH MATCHES THE WIDTH OF THE PROPOSED LANE. THE EXCESS PCCP SHALL BE COMPLETELY REMOVED AND REPLACED IN ACCORDANCE NTH WSDOT STANDARD SPECIFICATIONS SECTION 5-01. OSLOPE TREATMENT VARIES. SEE SHEET RS6. 10 EXISTING CONCRETE BARRIER TO REMAIN. 11 DOWEL BAR RETROFIT PCCP PANELS. CLEAN AND SEAL EXISTING TRANSVERSE AND LONGITUDINAL JOINTS. 12 SINGLE SLOPE CONCRETE BARRIER. SEE STANDARD PLAN C -14a FOR GRADE SEPARATION. 13 SEE SP AND PV SHEETS FOR LOCATION OF SAWCUTS. G NERAL NOTES: 1. ALL SURFACING AND PAVING DEPTHS ARE FINAL COMPACTED DEPTHS, SEE THE STANDARD SPECIFICATIONS FOR MAXIMUM LIFT PER MATERIAL DEPTH. 2. ROADWAY EMBANKMENT MAY BE CONSTRUCTED Tliw26909E CaMMON BORROW PER WSDOT STANDARD SPE EXISTING CROWN ROADWAY SECTION D N.T.S. E405 1115 +92.65 TO E405 1122 +80.00 FILE NAME C:% WorldProjeetWise\ BTJV0002tdms02273 1BTJV0002_DE_RS 405- CP.dgn TIME 8:18:06 AM REGION NO STATE FED.AID PROJ.NO. DATE 8/24/2010 - _........._. 10 WAS PLOTTED BY d10 _.__._ DESIGNED BY _ _ JOB NUMBER ENTERED BY _ CHECKED BY CONTRACT NO. LOCATION NO. PROD. ENGR. L. HODGSON REGIONAL ADM. D. DYE REVISION DATE BY DOWEL BAR RETROFIT PCCP PANELS, FOR WHAT IS CURRENTLY 5 THE OUTSIDE LANE. CLEAN AND SEAL EXISTING TRANSVERSE AND LONGITUDINAL JOINTS. THE PORTION OF PCCP PANELS BEING REPLACED DO NOT REQUIRE DOWEL BAR RETROFIT. SEE PV PLANS FOR LIMITS. 6 J SHOULDER IS USED WHEN RAMP METERING IS IN OPERATION. FOR WORK ON THE SB405 -S LINE SEE MK1 -2. \v" THERE WILL BE NO PAVING ON THIS LINE. WHERE THE EXISTING PCCP EXTENDS INTO THE EXISTING SHOULDER, THE 8 PCCP SHALL BE SAWCUT TO FULL -DEPTH SO THE REMAINING PCCP PAVEMENT WIDTH MATCHES THE WIDTH OF THE PROPOSED LANE. THE EXCESS PCCP SHALL BE COMPLETELY REMOVED AND REPLACED IN ACCORDANCE NTH WSDOT STANDARD SPECIFICATIONS SECTION 5-01. OSLOPE TREATMENT VARIES. SEE SHEET RS6. 10 EXISTING CONCRETE BARRIER TO REMAIN. 11 DOWEL BAR RETROFIT PCCP PANELS. CLEAN AND SEAL EXISTING TRANSVERSE AND LONGITUDINAL JOINTS. 12 SINGLE SLOPE CONCRETE BARRIER. SEE STANDARD PLAN C -14a FOR GRADE SEPARATION. 13 SEE SP AND PV SHEETS FOR LOCATION OF SAWCUTS. G NERAL NOTES: 1. ALL SURFACING AND PAVING DEPTHS ARE FINAL COMPACTED DEPTHS, SEE THE STANDARD SPECIFICATIONS FOR MAXIMUM LIFT PER MATERIAL DEPTH. 2. ROADWAY EMBANKMENT MAY BE CONSTRUCTED Tliw26909E CaMMON BORROW PER WSDOT STANDARD SPE