Loading...
HomeMy WebLinkAboutT-2690A0I 2' V4 8 SHLD 3 VARIES VARIES VARIES 11' -24' GP GP GP RET. WALL e 1 * VARIES 1 � 2 L-- -- -- ° - - --) ON /OFF VARIES VARIES Vq�I�SI r - I 6' -10' 12' -14' 0 ' l SHLD ON /OFF GORE 1134 +77.98 TO 1405 1138 +40.59 (WALL 4111A, SEE SHEET WAD13 VARIES i 1138 +40.59 TO 1405 1144 +70.16 (WALL 4111, SEE SHEET WA4) 3 11' -12' nj 1148 +80.00 TO 1405 1161 +88,07 (WALL 4130A, SEE SHEET WA6) 11' -12' HOV SHLD SHLD i HOV GP GP 3 VARIES VARIES 2' -13.8' 12' -24' SHLD ON /OFF CE SB16 SB405 i VARIES VARIES 0' -13' 4' -24' ON /OFF GORE i i / e i' GUARDRAIL (SEE PLAN 025 1 1 FOR TYPE) SB167 -SB405 i' E405 1170 +38.43 TO E405 1173+50.92 i 0.38' 1405 1167 +97.91 TO 1405 1170 +46.71 12' GP 2' VARIES VARIES ! VARIES NB 1405 CONTROL ON /OFF ON /OFF 1 GORE e 2'-1 3 8' 13'-24' 13' 4'-24' VARIES VARIES 2' -7' i I 2' -7' I VARIES i VARIES VARIES VARIES 11' -12' nj 11' -12' 11' -12' / VARIES rt (i rt 1 - 1405 BARRIER VARIES i NB 1405 CONTROL ON /OFF ON /OFF 1 GORE e GP ALIGNMENT VARIES VARIES 2' -7' i I 2' -7' I VARIES i VARIES VARIES VARIES 11' -12' a 11' -12' 11' -12' 11' -12' HOV SHLD SHLD i HOV GP GP 3 1 NB CE NB405 -NBCD 1169 +96 TO 1170+46.71 3 I 1 VARIES VARIES VARIES 0' -12' 0' -14' 0' -12.5' --]-- GP ' EDIAN ON /OFF 8 4' e e 1 e PIVOT POINT * PIVOT POINT & NEW CROWN & NEW CROWN PROFILE GRADE 1405 1152 +34.50 TO 1170 +46.71 1405 1134 +77.98 TO 1135 +54,05 1405 1134 +77.98 TO 1170 +46.71 NB 1405 13 +00.58 TO 15 +80.43 1405 1152 +34.50 TO 1170 +46.71 PIVOT POINT NB PROFILE GRADE 1405 1135 +54.05 TO 1152 +34.50 NB 1405 13 +00.58 TO 15 +80.43 ONLY ROADWAY SECTION G N.T.S. 1405 1134 +77.98 TO 1405 1144 +58.62 1405 1149 +56.77 TO 1405 1170 +46.71 BK BRIDGE (INCLUDING APPROACH SLABS) 1405 1144 +47.62 TO 1405 1149 +57.24 STATION EQUATION NB405 -NBCD 10 +00 = 1405 1159 +79.23 (52' RT) 1405 1170 +46.71 BK = E405 1170 +38.43 (8' LT) AHD 1405 1134 +77,98 = 1405 HOV 13 +00.58 (17' RT) 1405 1143 +59.39 = 1405 HOV 18+77.70 (22' RT) *SEE VARYING PAVEMENT DEPTHS FOR SECTION G 2 VARIES Ii .SB 46' E405 NB 12' 12' 12' 7' T 12' 12' 12' GP�jGP HOV SHLD SHLD HOV GP GP V t O 8' 10 I ____ "SMLD -- - - - - -_ -- SHLD EXISTING CROWN 4 1 i ROADWAY SECTION H i N.T.S. EXISTING CROWN i E406 1170 +38.43 AHD TO E405 1184 +77.23 I STATION EQUATION 1405 1170 +46 71 BK = E405 1170 +38 43 ' "026-1 E406 1176 +48.57 TO E405 1178 +68.78 1 VARIES VARIES' 8' 12' -14' , 0' -4.8' I 11,1 _.�.. - i E405 1178 +68.78 TO E405 1184 +77.23 FILE NAME C: 1WorkIProjectWiseIBTJV00021dms022731BTJ1 TIME _ DATE PLOTTED BY DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM. 8:18:17 AM 010 -A. SCHMICITMAN A. • • J. STJOHN L. •E • womlyd rr NB405 -NBCD I VARIES VARIES VARIES 1 12.5' -14' 0' -23' 12.6 -15' 1N , ON /OFF ORE ON /OFF 4 0.88, 1 (8 LT) AHD 6 0.0'- 7.0' 0.38' 2 SB167 -SB406 10 +00.00 = E406 1172 +49.56 (60' RT) c. 0' -20.5' 1-405 1137 +70 TO 1155 +00 NB406 -SB167 10 +00 = E406 1177 +07.11 (86' LT) 1 NB405 -NBCD e WSDOT NORTHWEST REGION CHANNEL IZA TION PLAN TRAFFIC ENGINEER - AREA OPERATIONS / Signed - = Date 14 -AD Print MARK BANDY ENGINEERING MANAGER Signed Dlvth�t.. i�tp�e F J�� Date 9 -(0-to Print DENISE CIERI a 992 ■'iiIiIIII� • • CONTRACT NO. I LOCATION NO. 1 i 14' 8' -13' NB405 -NBCD 18 +94.23 TO NB405 -NBCD 21 +89.10 e ON/OFF SHLD (WALL 4020, SEE SHEET WA6) NB405 -NBCD 21 +99.10 TO NB406 -NBCD 23 +21.45 12 4' (WALL 4022, SEE SHEET WA6) NB406 -NBCD 23 +31.45 TO NB405 -NBCD 25 +66.21 - 2 (WALL 4024, SEE SHEET WA6) 1 7 0.88' 1 LEGEND _ 1 - 12' SHLD 10 ON /OFF ON /OFF 1 GORE e GP "026-1 E406 1176 +48.57 TO E405 1178 +68.78 1 VARIES VARIES' 8' 12' -14' , 0' -4.8' I 11,1 _.�.. - i E405 1178 +68.78 TO E405 1184 +77.23 FILE NAME C: 1WorkIProjectWiseIBTJV00021dms022731BTJ1 TIME _ DATE PLOTTED BY DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM. 8:18:17 AM 010 -A. SCHMICITMAN A. • • J. STJOHN L. •E • womlyd rr NB405 -NBCD I VARIES VARIES VARIES 1 12.5' -14' 0' -23' 12.6 -15' 1N , ON /OFF ORE ON /OFF 4 0.88, 1 (8 LT) AHD 6 0.0'- 7.0' 0.38' 2 SB167 -SB406 10 +00.00 = E406 1172 +49.56 (60' RT) c. 0' -20.5' 1-405 1137 +70 TO 1155 +00 NB406 -SB167 10 +00 = E406 1177 +07.11 (86' LT) 1 NB405 -NBCD e WSDOT NORTHWEST REGION CHANNEL IZA TION PLAN TRAFFIC ENGINEER - AREA OPERATIONS / Signed - = Date 14 -AD Print MARK BANDY ENGINEERING MANAGER Signed Dlvth�t.. i�tp�e F J�� Date 9 -(0-to Print DENISE CIERI a 992 ■'iiIiIIII� • • CONTRACT NO. I LOCATION NO. 1 i 14' 8' -13' NB405 -NBCD 18 +94.23 TO NB405 -NBCD 21 +89.10 e ON/OFF SHLD (WALL 4020, SEE SHEET WA6) NB405 -NBCD 21 +99.10 TO NB406 -NBCD 23 +21.45 12 4' (WALL 4022, SEE SHEET WA6) NB406 -NBCD 23 +31.45 TO NB405 -NBCD 25 +66.21 - 2 (WALL 4024, SEE SHEET WA6) 1 7 0.88' 1 LEGEND HMA CL.' /T PG 64-22 CRUSHED SURFACING BASE COURSE PETROTAC (APPLY ON ALL JOINTS) EXISTING PCCP EXISTING HMA COMMON BORROW EXISTING ASPHALT TREATED BASE CROSS SLOPE VARIES,SEE SUPERELEVATION 1 DIAGRAM ON PROFILE AND SUPERELEVATION SHEETS (AS APPLICABLE) OR MATCH EXISTING. /O FOR LANE TAPERS, SEE PAVEMENT MARKING PLAN. 1 CONCRETE BARRIER. SEE STANDARD \vYJ PLAN C -16a FOR EMBEDMENT CROSS SLOPE ON SHOULDER VARIES. 4 SEE SHOULDER SLOPE DETAIL ON SHEET PVD3. DOWEL BAR RETROFIT PCCP PANELS, 5 FOR WHAT IS CURRENTLY THE OUTSIDE LANE. CLEAN AND SEAL EXISTING TRANSVERSE AND LONGITUDINAL JOINTS, THE PORTION OF PCCP PANELS BEING REPLACED DO NOT REQUIRE DOWEL BAR RETROFIT. SEE PV PLANS FOR LIMITS. SHOULDER IS USED WHEN RAMP METERING 6 IS IN OPERATION. FOR WORK ON THE SB405 -S LINE SEE MK1 -2. \v� % THERE WILL BE NO PAVING ON THIS LINE. WHERE THE EXISTING PCCP EXTENDS INTO THE 8 EXISTING SHOULDER, THE PCCP SHALL BE SAWCUT TO FULL -DEPTH SO THE REMAINING PCCP PAVEMENT WIDTH MATCHES THE WIDTH OF THE PROPOSED LANE. THE EXCESS PCCP SHALL BE COMPLETELY REMOVED AND REPLACED IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATIONS SECTION 5 -01. 8 i SLOPE TREATMENT VARIES, SEE SHEET RS6. 10 EXISTING CONCRETE BARRIER TO REMAIN. 11 DOWEL BAR RETROFIT PCCP PANELS. CLEAN AND SEAL EXISTING TRANSVERSE AND LONGITUDINAL JOINTS. 12 PLANE EXISTING ASPHALT TREATED BASE AS REQUIRED TO PROVIDE FULL PAVEMENT DEPTHS. <8> SEE SP AND PV SHEETS FOR LOCATION OF SAWCUTS. kq 1 -405 1134 +77.98 TO 7137 +20 GENERAL NOTES. \ I -405 1155 +80 TO 1170 +46.71 1. ALL SURFACING AND PAVING DEPTHS ARE FINAL COMPACTED E406 1177 +53.00 TO E406 1184+77.23 5 DEPTHS. SEE THE STANDARD SPECIFICATIONS FOR MAXIMUM LIFT PER MATERIAL DEPTH. E405 1176 +85.00 TO E405 1177 +53.10VARYING PAVEMENT DEPTHS 2. ROADWAY EMBANKMENT MAY BE CONSTRUCTED USING FOR SECTION G COMMON BORROW PER WSDOT STANDARD SPECIFICATIONS.