Loading...
HomeMy WebLinkAboutT-2690A1ct NB405-SR181 4 0'- 15' SHLD GP GP O VARIES 2' FOR 13 ISLAND DETAILS SEE PVD1 0.33�' 0.16' 2 0.88' 2 0.38' 13 NB405-SR181 16+95-69 TO NB405-SR181 17+35.03 VARIES 75-27' 15' 8' GP SHLD 2- NB405-SR181 11+63.49 TO NB406-SR181 14+00.00 0.88' .38 2 RET. WALL NB405-SR181 14+00.00 TO NB405-SR181 16+60.00 (WALL 4010, SEE SHEET WA3) ROADWAY SECTION NB405 TO SR181 RAMP N.T.S. NB405-SR181 11+63.49 TO NS406-SR181 17+35.03 STATION EQUATION E406 1109+27.00 = NB405-SR181 11+63.49 (80.34'RT) 2'-4- rt 15' V SHLD ON SHLD BARRIER MATCH EXISTING - g:1, I ROADWAY SECTION NB405 TO SB167 RAMP N.T.S. NB406-SB167 10+46.00 TO NB406-SB167 16+00.00 STATION EQUATION NB405-NBCD 27+84.72 = NB405-SB167 10+46.00 E405 1177+52.51 = NB406-SB167 10+46.00 ot TP-E405 VARIES 54° - 12' 4' SHLD' ON RET. WALL ---\ TP-E406 4086+00.00 TO 1 4 TP-E406 4087+00.00 (WALL 4006, SEE SHEET WAI) PROFILE GRADE EXISTING & PIVOT POINT GRADE ° 41 0 88' BARRIER 3 1 TP-E405 4085+36.09 0.3$ TO 4086+00.09 9 i 0,88' WSDO T NOR THWES T REGION CHANIVEL IZA TION PLAN TRAFFIC ENGINEER - AREA OPERATIONS LEGEND Signed �a'AG:�d' c% Date j 'Z + //v CDHMA CL.1/2' PG 64-22 Print MARK BANDY (J) CRUSHED SURFACING BASE COURSE ENGINEERING MANAGER ONOT USED Signed hpvv-4-(-- PC- Date C�-10-lo EXISTING PCCP Print DENISE CIERI EXISTING HMA NOTES: VARIES -L 2- - 6 SHLD RET. WALL TP-E405 4085+88.90 TO TP-E405 4087+29.19 (WALL 4007, SEE SHEET INAII) a TP-E406 4086+36.09 TO TP-E406 4086+00.09 TP-E406 4086+36.09 TO TP-E406 4086+88.90 VARIES <2> TP-E406 4087+00.00 TO TP-E406 4087+28.10 ROADWAY SECTION TP-E405 RAMP N.T.S. EJ81 TP-E406 4086+36.09 TO TP-E405 4087+38.05 VARIES VARIES 64-83' 1 2.3'-6.3- STATION EQUATION VARIES VARIES VARIES VARIES VARIES VARIES VARIES 14'-24,5' 0'-28' 111-11.51 11' -11.5' 0' -11° ll'-12.5' 12'-12.5' TP-E405 4087+28.10 = E406 1087+39.68 (73.68'RT) GP ISLAND GP I GP QP GP GP GP O ct - - - - FLl- I ------ SR181-NB405 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - CEMENT CONCRETE CURB 1, GUTTER Ex EX EX EX EX 4- 2'-16'- 13' -16' 8' 1 VARIPR i ROADWAY .19Fr.TION FlAl -I- CROSS SLOPE VARIES, SEE SUPERELEVATION DIAGRAM ON PROFILE AND SUPERELEVATION SHEETS (AS APPLICABLE) OR MATCH EXISTING FOR LANE TAPERS, SEE PAVEMENT MARKING PLAN. CONCRETE BARRIER. SEE STANDARD PLAN C-16a FOR EMBEDMENT CROSS SLOPE ON SHOULDER VARIES. SEE SHOULDER SLOPE 4 DETAIL ON SHEET PVD3. DOWEL BAR RETROFIT PCCP PANELS, FOR WHAT IS CURRENTLY THE OUTSIDE LANE. CLEAN AND SEAL EXISTING TRANSVERSE AND LONGITUDINAL JOINTS. THE PORTION OF PCCP PANELS BEING REPLACED DO NOT REQUIRE DOWEL BAR RETROFIT. SEE PV PLANS FOR LIMITS. SHOULDER IS USED WHEN RAMP METERING IS IN OPERATION. FOR WORK ON THE SB405-S LINE SEE MK1-2. THERE WILL BE NO PAVING ON THIS LINE. WHERE THE EXISTING PCCP EXTENDS INTO THE EXISTING SHOULDER, THE PCCP SHALL BE SAWCUT TO FULL-DEPTH SO THE REMAINING PCCP PAVEMENT WIDTH MATCHES THE WIDTH OF THE PROPOSED LANE. THE EXCESS PCCP SHALL BE COMPLETELY REMOVED AND REPLACED IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATIONS SECTION 5-01. < 9 > SLOPE TREATMENT VARIES. SEE SHEET RS6 <8> EXISTING CONCRETE BARRIER TO REMAIN. DOWEL BAR RETROFIT PCCP PANELS. CLEAN AND SEAL EXISTING TRANSVERSE AND LONGITUDINAL JOINTS. SEE SP AND PV SHEETS FOR LOCATION OF SAWCUTS. <8> GRIND EXISTING PAVEMENT PRIOR TO OVERLAY GENERAL NOTES: 1. ALL SURFACING AND PAVING DEPTHS ARE FINAL COMPACTED DEPTHS. SEE THE STANDARD SPECIFICATIONS FOR MAXIMUM LIFT PER MATERIAL DEPTH. 2. ROADWAY EMBANKMENT MAY BE CONSTRUCTED USING COMMON BORROW PER WSDOT STANDARD SPECIFICATIONS. SB167- It' SB405