Loading...
HomeMy WebLinkAboutT-2690A2SLOPE TABLE STATION TO STATION CUT/ FILLI FILL/ FORESLOPE DITCH BOTTOM I CUT SLOPEI NOTES ESB5 -NB406 LINE 2017+39.83 TO 2019+67.43 RT Fill 6:1 SLOPE TABLE STATION TO STATION CUT/ FILL FILL/ FORESLOPE DITCH BOTTOM CUT SLOPE NOTES E405 LINE 1-405 MP 0.25 TO MP 2.77 Plot 6 8:18:31 AM 1084+11,61 TO 1085+59.00 RT Fill 6:1 REGION NO. STATE FEDAD PROJI.N0. 1085+59.00 TO 1087+33.00 RT Fill 2:1 Department of Transponation Reinforce SIOPE 1090+26.24 TO 1092+02.00 RT Fill 2:1 WALL Reinforce slopE 1092+02.00 TO 1092+60.00 RT Fill 1.6:1 Reinforce SIOPE 1092+60.00 TO 1093+00.00 RT Fill 1.51 0 2:1 Reinforce SIOPE 1093+00.00 TO 1093+55.00 RT Fill 1.6:1 0 2:1 WASH 1093+55.00 TO 1096+25.00 RT Fill 2:1 Corridor Program 405 C 1096+25.00 TO 1103+28.00 (WALL 4008) RT Fill Wall 0 2:1 1103+28.00 TO 1103+75.00 RT Fill 2:1 2 7 1103+75.00 TO 1104+7100 RT Cut 3:1 STAGE 1 -WIDENING Barrier ENTERED BY 1109+17.93 TO 1112+66.38 RT Fill 6:1 1122+80.00 TO 1123+62.05 RT Fill 2:1 Reinforce slopE 1085+18,30 TO 1089+05.61 LT Fill 4:1 J. STJOHN Reinforce slopE 1089+05.61 TO 1091+27.63 (WALL 4100) LT Cut 1:1 LOCATION NO. Wall Reinforce slopE 1091+27.63 TO 1091+55.65 LT Cut Wall OF Barrier L. HODGSON- 1091+55.65 TO 1095+30.00 LT Fill 4:1 1095+30.00 TO 1102+00.00 LT Cut 2:1 0 2:1 1095+53.11 TO 1102+35.00 LT Fill 2:1 DATE BY 1102+35.00 TO 1104 +85.00 LT Cut 2:1 1 Barrier 9--t I 1104+85.00 TO 1105+15.96 LT Fill 2:1 1109+10.00 TO 1109+84.00 LT Cut 6:1 1109+84.00 TO 1113+47.88 LT Fill 6:1 SLOPE TABLE STATION TO STATION CUT/ FILL FILL/ FORESLOPE DITCH BOTTOM CUT SLOPE NOTES 1405 LINE 1-405 MP 0.25 TO MP 2.77 Plot 6 8:18:31 AM 1131+77.41 TO 1135+25.00 RT Fill Moment slab REGION NO. STATE FEDAD PROJI.N0. 1135+25.00 TO 1136+50.00 RT Fill 1:1 Department of Transponation Reinforce SIOPE 1136+50.00 TO 1136+80.00 RT Fill Transition 1:1-1,5:1 WALL Reinforce slopE 1136+80.00 TO 1137+80.00 RT Fill 1.51 Reinforce SIOPE 1138+20.00 TO 1155+40.00 RT Fill 2:1 0 2:1 d10 1155+12.00 TO 1159+80.00 RT Fill 6:1, 2:1 0 2:1 WASH 1137+80,00 TO 1138+20.00 RT Fill Transition 1.6:1-2:1 Corridor Program 405 C 1159+80.00 TO 1159+80.00 RT Fill 2:1 0 2:1 1160+33.00 TO 1161+99.00 RT Fill 4:1 2 7 1161+99.00 TO 1163+80.00 RT Fill 3:1 STAGE 1 -WIDENING SHEET ENTERED BY 1163+80.00 TO 1164+77.00 RT Fill 2:1 1164+77.00 TO 1167+20.00 RT Fill 1.5:1 Reinforce slopE 1167+20.00 TO 1167+50.00 RT Fill Transition 1.5:1-1:1 J. STJOHN Reinforce slopE 1167+50,00 TO 1168+70.00 RT Fill 1:1 LOCATION NO. Reinforce slopE 1168+70.00 TO 1170+46.71 (WALL 4020) RT Fill Wall OF PROD. ENGR. L. HODGSON- 1134+59.24 TO 1144+70.16 (WALL 4111) LT Fill Wall 1148+80.05 TO 1161+88.87 (WALL 4130A) LT Fill Wall Noma TRI-STATE CONSTRUCTION, INC, Iml ROADWAY SECTIONS 1161+88.87 TO 1166+00.00 LT Fill 1.6:1 DATE BY 11166+00.00 TO 1170+46.71 LT Fill 2:1 1 P.E. STAMP BOX 9--t I SLOPE TABLE STATION TO STATION CUT/ FILL FILL/ FORESLOPE DITCH BOTTOM CUT SLOPE NOTES TP-E405 LINE 4085+45.00 TO 4085+88.90 RT Fill 6:1 4085+88.90 TO 4089+82.93 (WALL 4007) RT Fill Wall 4089+82.93 TO 4090+24.17 RT Fill 2:1 36.09 TO 4086+00.00 LT Fill 2:1 00.00 TO 4087+00.00 (WALL 4006) LT Fill Wall 00.00 TO 4087+31.00 LT I Fill 1 4:1 SLOPE TABLE STATION TO STATION CUT/ FILL FILL/ FORESLOPE DITCH BOTTOM CUT SLOPE NOTES NB406-SR181 LINE 1-405 MP 0.25 TO MP 2.77 Plot 6 8:18:31 AM 10+98.31 TO 13+60.00 RT Fill 6:1 REGION NO. STATE FEDAD PROJI.N0. 13+60.00 TO 14+00.00 RT Fill 3:1 Department of Transponation 14+00.00 TO 16+50.00 (WALL 4010) RT Fill WALL WALL 16+50.00 TO 16+69.00 RT Fill 2:1 16+69.00 TO E181 16+89.04 RT Cut 2:1 0 2:1 d10 SLOPE TABLE STATION TO STATION CUT/ FILL FILL/ FORESLOPE DITCH BOTTOM CUT SLOPE NOTES NB405-NBCD LINE 1-405 MP 0.25 TO MP 2.77 Plot 6 8:18:31 AM 20+69.84 TO 21 +89.10 (WALL 4020) RT Fill WALL REGION NO. STATE FEDAD PROJI.N0. 21+89.10 TO 22+04,00 RT Fill 2:1 Department of Transponation 22+04.00 TO 23+19.00 (WALL 4022) RT Cut WALL 23+19.00 TO 23+4000 RT Fill 1.61 23+40.00 TO 25+66.21 (WALL 4024) RT Fill Wall RS6 PLOTTED BY d10 SLOPE TABLE STATION TO STATION CUT/ FILL FILL/ FORESLOPE DITCH BOTTOM CUT SLOPE NOTES SB167-SB406 LINE 1-405 MP 0.25 TO MP 2.77 Plot 6 8:18:31 AM 16+70.00 TO 18+94.49 RT Fill 2:1 REGION NO. STATE FEDAD PROJI.N0. 118+94.49 TO 20+91.00 RT Fill 6:1 Department of Transponation SPECIAL BORROW TYPE C (SEE SPECIAL PROVISIONS) o. PRIMARY REINFORCEMENT H (TYP) (SEE NOTE 2) REINFORCED SLOPE tvAmlcoy 12" MAX : '\ z z ANGLE VARIES 12" MAX SECONDARY REINFORCEMENT 12" MAX (TYP) (SEE NOTES 2 AND 3) 4' 6' E406 STA 1092+60.00 TO 1093+00.00 RT 6' - 1405 STA 1164+77.00 TO 1168+70.00 RT 10'- 1406 STA 1135+26.00 TO 1138+20.00 RT RSI-5 FOR BARRIER LOCATION AND PAVING SECTION TURF REINFORCEMENT MAT (TRM) INSIDE GEOGRID (SEE NOTE 4) X SLOPE FACE FILL (SEE NOTE 1) 3' MAX NOTES ,1. FILL WITHIN ONE FOOT OF SLOPE FACE SHALL CONTAIN N 24% ORGANIC CONTENT BY WEIGHT, AND NOT MORE THAN 25% ORGANIC CONTENT BY VOLUME. 2. PRIMARY AND SECONDARY REINFORCEMENT SHALL CONSIST OF GEOSYNTHETIC REINFORCEMENT INSTALLED SUCH THAT ITS MACHINE DIRECTION IS PERPENDICULAR TO THE SLOPE FACE ALIGNMENT. 3. SECONDARY REINFORCEMENT IS REQUIRED WHERE THE SLOPE FACE IS 1.2H:1V OR STEEPER.FOR SLOPE FACES FLATTER THAN 1.2H:IV,TRM (SEE NOTE 4) MAY BE ANCHORED DIRECTLY TO THE SLOPE IN LIEU OF SECONDARY REINFORCEMENT. 4. GEOSYNTHETIC TURF REINFORCEMENT MATS (TRMS) SHALL BE INSTALLED ON ALL SLOPES STEEPER THAN 1.5HAV. TRMS SHALL BE PLACED BEHIND (SOIL SIDE) THE PRIMARY REINFORCEMENT AND SECONDARY REINFORCEMENT. TRMS SHALL BE INSTALLED IN ACCORDANCE WITH WSDOT REQUIREMENTS AND TRM MANUFACTURER RECOMMENDATIONS. TRMS SHOULD BE EMBEDDED AT LEAST 1.5 FEET BEHIND THE SLOPE FACE. 5. GRADUALLY TRANSITION BETWEEN DIFFERENT SLOPES. & SEE DRAINAGE SHEETS FOR DITCH INFORMATION. WSDOT NORTHWEST REGION CHANNEL IZA TIDN PL AN FILE NAME TIME C:lWorkXProjeetWiseXBTJV00021dms022731BTJV0002 DE IRS 406-CP.dgn 1� M. ST.,, .4� Anih, washiingtomi State TV 1-405 MP 0.25 TO MP 2.77 Plot 6 8:18:31 AM REGION NO. STATE FEDAD PROJI.N0. WAsll Department of Transponation DATE 817412010 1-405 RS6 PLOTTED BY d10 10 WASH Corridor Program 405 C 145 TO SR169 DESIGNED BY A. SCHMIDTMAN JOB NUMBER 2 7 STAGE 1 -WIDENING SHEET ENTERED BY L. JOHNSON NA� BILFINGRR BERGER M, Ca D"IDEVAING I �AZGOOIATIIG ! Nr KING COUNTY JULY 2010 G CHECKED BY J. STJOHN CONTRACT NO. LOCATION NO. Civil Inc. I OF PROD. ENGR. L. HODGSON- 47114'4 tt-) L DATE DATE Noma TRI-STATE CONSTRUCTION, INC, Iml ROADWAY SECTIONS REGIONAL ADM. D. DYE REVISION DATE BY P.E. STAMP BOX P.E. STAMP BOX 9--t I SHEETS