HomeMy WebLinkAboutT-2690A5SEC. 23, T. 23 N, RE 4 E, WAS
WSDO T NOR THWES T REGION
CHANNEL IZA TION FL AN
----------- I
100
FEET
0)
or
jw
w
WX
Z(O
_Jw
w
X(n
5*
I MA&%j%7%jP%iA)
FILE NAME
C:lWorkIProjectWiseiBTJV0002XdmsO22731BTJV0002
PS ALRW 405-CP.dgn
C, 4 ST..
Allllllllb Washington State
GAP-Dopartmont
1-406 MP 0.25 TO MP 2.77
Plot 3
TIME
8:20:26 AM
REGION
NO.
STATE
FEDAID PROINO.
Qf WA&//
of Transportation
DATE
8/U/201 0
AR3
PLOTTED BY
d10
10
WASH
40 Corridor Program
1-5 TO SRI 69
DESIGNED BY
A. SCHMIDTMAN
JOB NUMBER
STAGE I -WIDENING
SHEET
ENTERED BY
D. FRANKUM
S
DAVID EVAN
BILFINGER
CHECKED BY
J. ST. JOHN
CONTRACT NO.
LOCATION NO.
NAL
BERGER ASSOCIATE:
lCiviiinc,
KING COUNTY JULY 2010
I I
OF
PROD. ENGR.
L. HODGSON
DATI!
DATE
TRI-STATE CONSTRUCTION, INC.
ALIGNMENT/RIGHT OF WAY PLAN
319
REGIONAL ADM.
D. DYE
REVISION
DATE
BY
P.E. STAMP BOX
P.E. STAMP BOX
SHEETS