HomeMy WebLinkAboutT-2690ABTOTAL CURVE DATA I CURVE DATA
P.I. STATION DELTA TANGENT C DELTA RADIUS LEN
NB405-SB167 13+53.00 2*40'08' RT 18.64 800.00 1 37,
NB405-SB167 15+33.00 8 °12'46" LT 83.13 -1157.86 -1-16E
SB167-SB405 17+59.12 52*59'45" LT 69 13 319 19 1 29°
SEC. 19, T. 23 N.5 R. 5 E.5 W.M.
'S.
b
1100
4F
J:
c�
0 s0 100
SCALE IN FEET
0 o
C'
FILE NAME C:XWorkIProjectWiseXBTJV00021dms022731BTJV0002
PS ALRW 405-CP.dgn
�- ST.
r'V WAS//
/ONAI.
P.E.STAMP BOX
DATE
P.E. STAMP BOX
Alftk Washington State
E WrAf Department of Transportation
40 Corridor Program
q;L
ME DAVID EVANIII
BILFINGRR BERGER ASSOCIATIES mm
civil Inc, wo
TRI-STATE CONSTRUCTION, INC.
1-405 MP 0.25 TO MP 2.77
1-405
1-5 TO SRI 69
STAGE I -WIDENING
KING COUNTY JULY 2010
Plot 9
TIME 8:20:49 AM
REGION
NO.
STATE
FEDAID PROJAO.
AR9
DATE 812412010
10
WASH
PLOTTED BY d10
DESIGNED BY A. SCHMIDTMAN
JOB NUMBER
ENTERED BY D. FRANKUM
SHEET
I-T
OF
se
SHEETS
CHECKED BY J. ST. JOHN
CONTRACTNO.
LOCATION NO.
PROD. ENGR. L. HODGSON
A
ALIGNMENT /RIGHT OF WAY PLAN
REGIONAL ADM. D. DYE
REVISION
DATE
BY