HomeMy WebLinkAboutT-2690B3FILE NAME C:1WorkIProjectWise%BTJV00021dms022731BTJV0002—PR—R.D
405-CPdgn
0. S r,.,j
Q� WA y;
N2
A
Ip
ATE �
P.E. STAMP BOX
DAii__
P.E. STAMP BOX
T A1101116 Washington State
vGF-Department of Transportation
0 Corridor Program
BILFINGRR BERGER DAVID EVANS
ii� off ASSOCIATE* ato.
Icivilinc,
TRI-STATE CONSTRUCTION, INC,
ml 0--d e-&-t4w
1-405 MP 0.25 TO MP 2.77
1-406
1-6 TO SRS 69
STAGE I -WIDENING
KING COUNTY JULY 2010
Plot 5
TIME 8:19:24 AM
REGION
NO,
STATE
FEDAID PROJI.N0.
RPS
DATE 8/2412010
10
WASH
PLOTTED BY d10
DESIGNED BY A. SCHMIDTMAN
JOB NUMBER
SHEET
Z5
OF
gyp'
SHEETS
ENTERED BY D. FRANKILIM
CHECKED BY I ST. JOHN
CONTRACT NO.
LOCATION NO.
PROD. ENGR. L. HODGSON
I PROFILE AND SUPERELEVATION
REGIONAL ADM. D. DYE
REVISION
DATE
I BY