HomeMy WebLinkAboutT-269159SEC. 19, T. 23 N., R. 6 E., W.M.
Q_
EA
ti
o ea
tc ILI
W uj
1:
W ca
Z ILI
_j W
X
60 100
SCALE IN FEET
I - -
I
T=269159
FILE NAME
TIME
C:kWorkIProjectW!se%BTJV00021dms022761BTJV0002
9:29:07 AM
PS ALRW 167-CP.dgn
"g. sr"/
W 8shin n state
v7,PD
SR167 MP 24.59 TO MP 26.23
Plot 25
REGION
NO�
I STATE
FEDAID PROIN0.
WA
. of Transponstion
.p..'to
DATE
8123/2010
.
10
1
WAS
Z
40 Corridor Program
1-405
AR5
PLOTTED BY
d10
1-5 TO SR1 69
DESIGNED BY
L. JOHNSON
JOB NUMBER
011,
7
STAGE I -WIDENING
SHEET
ENTERED BY
L. JOHNSON
BILFINGER1 BERGER DAVID IffVAN
we
6
CHE—CKED BY
J. ST. JOHN
CONTRACT NO.
LOCATION NO.
N
A89OCIATE:
Civil Inc.
KING COUNTY APRIL 2010
OF
PROD. ENGR.
L. HODGSON
DATE
TRI-STATE CONSTRUCTION, INC
NEI
ALIGNMENT /RIGHT OF WAY PLAN
REGIONAL ADM.
D. DYE
REVISION
DATE
By
P.E. STAMP BOX —
q_"ae_-d_g
SHEETS