Loading...
HomeMy WebLinkAboutT-26915BTOTAL CURVE DATA P.I. STATION DELTA NB405-SB167 15+33.03 8 °12 46' NB405-SB167 19+39.20 51-42'35 NB405-SB167 22+87.90 3°11'14 O C) is UJ UJ UJ U) Z Lu -j W CURVE DATA RADIUS TANGENT LENGTH C DELTA S SEC. 19, T. 23 N. R. 5 E■ , W.M■ 1157.86 83.13 165.97 -6.70% 435.00 210.80--392-58 -7.60% 6000.00 166.92 333.76 -2.40% -10995 - E167A-- -LINE-- __ -Nl-*36'32T= --- ------------ RAINIER AVE S 7- 7 167-CP.dgn W TIME 9:29:16 AM l z I i I I STATE Si iqned Date ti DATE 812312010 - MARK B ANDY 0 so 100 V PLOTTED BY d10 Print DESIGNED BY L. JOHNSON SCALE IN FEET ENGINEERING MANAGER JOB NUMBER ENTERED BY L. JOHNSON lot CHECKED BY J. ST. JOHN cr CONTRACT NO. LOCATION NO. PROJ. ENGR. L. HODGSON -A I tlp REVISION DATE BY - A o1v 11�v 0 END CONSTRUCTION *> SR 167 MP 26.23 i ' JI 0 1z" A/ V %ll qtr El 67A 10998+00.00 u l > o WSDOT NOR7 -Hh/E5 T REGION I All 0 % 'N& ROW 997+97.99 CHANNEL IZA TION PLAN h f I I TRAFFIC ENGINEER - AREA OPERATIONS V NB4 lSB1 67 17+28.40 PC J 6k. A, NB405-SB167 22+87.90 Y. t % It NS406-SB167 21+20.98 PCC NB406-SB167 19+39.20 PI (48.381 RT) t T'll -10995 - E167A-- -LINE-- __ -Nl-*36'32T= --- ------------ RAINIER AVE S 7- 7 167-CP.dgn W TIME 9:29:16 AM l z I i I I STATE Si iqned Date ti DATE 812312010 - MARK B ANDY 10 V PLOTTED BY d10 Print DESIGNED BY L. JOHNSON ENGINEERING MANAGER JOB NUMBER ENTERED BY L. JOHNSON lot CHECKED BY J. ST. JOHN CONTRACT NO. LOCATION NO. PROJ. ENGR. L. HODGSON tlp REVISION DATE BY END CONSTRUCTION SR 167 MP 26.23 i ' JI V El 67A 10998+00.00 WSDOT NOR7 -Hh/E5 T REGION I All i ROW 997+97.99 CHANNEL IZA TION PLAN h f I I TRAFFIC ENGINEER - AREA OPERATIONS FILE NAME C:kWork%ProjectWiselBTJV00021dmsO22751BTJV0002-PS-ALRW 167-CP.dgn W TIME 9:29:16 AM REGION O. STATE Si iqned Date ti DATE 812312010 - MARK B ANDY 10 WASH PLOTTED BY d10 Print DESIGNED BY L. JOHNSON ENGINEERING MANAGER JOB NUMBER ENTERED BY L. JOHNSON lot FILE NAME C:kWork%ProjectWiselBTJV00021dmsO22751BTJV0002-PS-ALRW 167-CP.dgn W TIME 9:29:16 AM REGION O. STATE FEDAID PROJA0. ti DATE 812312010 - 10 WASH PLOTTED BY d10 DESIGNED BY L. JOHNSON JOB NUMBER ENTERED BY L. JOHNSON CHECKED BY J. ST. JOHN CONTRACT NO. LOCATION NO. PROJ. ENGR. L. HODGSON REGIONAL ADM. D. DYE REVISION DATE BY P.E. STAMP BOX P.E. STAMP BOX Signed P'u' T E Date 9-1G tO