HomeMy WebLinkAboutT-26920EO
O
NOTES:
1. FOR I.EGEND.WNERN. NOmES,AM CONSTRUCTION NOTES,
SEE DMVSNG N 1.
L FOR CONDUIT AM VARRIO SCHEDULE, SEE DRAWING ft. -0 .
I FOR LUMMIRE SCHMULE.SEE DRAWING 1D 13.
& FOR PUUBOX SCREDUE.SEE DRA%ANG 1L 16.
J. &AuaAN
KZHAO
7624 1/ U*
sale a no,
AWOL
Washington State
Department of Transportation
1-405
1.5 • SR 169
STAGE 2 WIDENING
AND SIR 516 INTERCHANGE
E"28
IN gpala 0 MOO
MOISEWAUL NW14
F—Mam .. .. ... .. . ... ...
S 14TH ST
NOTES:
1. FOR I.EGEND.WNERN. NOmES,AM CONSTRUCTION NOTES,
SEE DMVSNG N 1.
L FOR CONDUIT AM VARRIO SCHEDULE, SEE DRAWING ft. -0 .
I FOR LUMMIRE SCHMULE.SEE DRAWING 1D 13.
& FOR PUUBOX SCREDUE.SEE DRA%ANG 1L 16.
J. &AuaAN
KZHAO
7624 1/ U*
sale a no,
AWOL
Washington State
Department of Transportation
1-405
1.5 • SR 169
STAGE 2 WIDENING
AND SIR 516 INTERCHANGE