Loading...
HomeMy WebLinkAboutT-26923En e5: 0 0 I r' L THE CONTRACTOR SHALL INSTALL THE CONDUITS IN THE LOCATIONS SHCWM IN THESE DETAILS. 2. THE GROUND RODS. DRAIN TILES,ASSOCIATED CONDUITS, AND 104 REBAR-W DEGREE WTH 30" LEGS ARE ONLY REQUIRED IN FOUNDATIONS THAT WILL HAVE EITHER A TRANSFORMER OR SERVICE CABINET INSTALLED ON IT. THE GROUND RODS, DRAIN TILES, ASSOCIATED CONDUITS, AND fib REBAR -b0 DEGREE NTH 30- LEGS CAN BE OMITTED FROM ALL OTHER FOUNDATIONS. (` 3. THE CABINETS SHALL BE ATTACHED TO THE FOUNDATION MATH / STAINLESS STEEL CINCH BOLTS PER MANUFACTURER'S RECOMMENDATIONS. INSTALLATION SHALL BE DONE IN DRY CONDITIONS. BOLTS SHALL EXTEND A MINIMUM OF I T /C' ABOVE CONCRETE PAD, 4. REINFORCING STEEL SHALL HAVE A MINIMUM CLEAR COVER OF TAT BOTTOM OF SLAB. 2 ° OTHERWISE. S PLACE ATI la- BEAD OF SILICONE BETWEEN CABINETS AND THE � & SEE STANDARD PLAN J-0e "TYPICAL GROUNDING DETAILS' FOR GROUNDING DETAILS.TAI0 GROUND RODS ARE REQUIRED FOR / FOUNDATION WITH A SERVICE CABINET OR TRANSFORMER CABINET T. INSTALL CONDUITS AS INDICATED IN PLANS. CONDUIT SHALL EXTEND Z' ABOVE THE COUPUNG. >8. CONCRETE SHALL BE CLASS 3000 8, VERIFY DEAD FRONT LOCATION FROM MANUFACTURER PRIOR TO PIACING CONDUIT IN FOUNDATION. \� CONSTRUCTION NOTES / (1 DRIVE GROUND RODS BEFORE PLACING CONCRETE. MOVE ROOM AND GRAIN TILE(S)SMTH COVER(S) AS REQUIRED TO ACHIEVE FULL GROUND PENETRATION. MAINTAIN A G'MINIMUM CLEARANCE BETWEEN GROUND RODS AND Or FROM FOUNDATION EDGE AS DETAILED ON M. PLAN J -BR TYPICAL GROUNDING DETAILS' �2 ALL ORB CONDUITS PENETRATING ALL CABINETS SHALL BE TERMINATED WITH GROUNDING ENO BUSHING AND BONDED TO THE CABINET GROUNDING BUS. AIL PVC CONDUIT PENETRATING CABINET SHALL BE TERMINATED BELL BUSHING. Q3 INSTALL CONDUIT COUPLINGS ON ALL CONDUITS. PLACE COUPUNGS FLUSH NTH TOP OF CONCRETE FOUNDATION. IF PVC CONDUITS ARE SPECIFIED THE 2- CONDUIT STUB AND END BELL BUSHING SHALL NOT BE GLUED TO COUPLING. © 4' DIA.x TB' DEEP SUMP. SLOPE FOUNDATION WITHIN CABINET FOOTPRINT TOWARDS SUMP.W POLYETHYLENE OR COPPER DRAIN PIPE. CONDUIT PLACEMENT LOCATION AREA (TRANSFORMER HIGH VOLTAGE CONDUIT AREA) MELOW VOLTAGE CONDUIT PLACEMENT LOCATION I I I i i I II II I II �I I I I I I C I I I I I 1_ ME- u (TVP 2 PLACES) =