Loading...
HomeMy WebLinkAboutT-269265I AA i� TYP 2 TOP OF BARRIER SEE ILLUMINATION PLANS FOR CONDUIT ____________I AND WIRE SIZE EXISTING __.__ ;PULL BOX1 m� JB B' D I SUMP (TYpr R)- VP DRAIN TUBE (TYP)- CABINET REAR f I PLAN CABINET FOUNUTION DETAIL STA E405 1209 -M NTS 44 EA WAY NP. TOP & BO OM) x sbuBbw TASK L 0OAD .M L PADFAGE: 7524 RFC -1C CLAMP BARE kB COPPER WIRE TO REBAR Ra1i 1405 Corridor U sQn- E&Iiivers FELEASED POR CIONSTRU(7, 10%1 SECTION A MS NOTES: 1. ALL CONDUITS SHALL BE CLUSTERED TOWARD REAR OF THE CABINETS. - 2. SLOPE FOUNDATION 1WIFT. TO THE EDGE. 3. SLOPE PADS VVIFT. TO THE SUMP IN CENTER. 4. ALL CONDUITS SHALL HAVE A COUPLING FLUSH WITH THE SURFACE OF THE FOUNDATION AND A NIPPLE THAT EXTENDS 2 "UP. 6. ALL CONDUITS SHALL BE HOT DIPPED GALVANIZED OR PVC B. USE SILICONE BEADED SEALANT AROUND CABINETS AND PAD. 1, BOLT PATTERN IS PROVIDED BY CABINET MANUFACTURER BOLTS SHALL BE UW DIA. BY Y WEDGE ANCHORS. S. CONCRETE SHALL BE CLASS 3D00. 9. ALL ANCHOR BOLTS SHALL BE HOT DIPPED GALVANIZED. ALTERNATE'. STAINLESS STEEL CINCH BOLTS PER MANUFACTURER'S RECOMMENDATION. BOLT SHALL EXTEND A MIN. 1- IM' ABOVE THE CONCRETE PAD. iD SEE SHEETS T W THROUGH TS T FOR WIRE NOTES 11, CLEAR COVER FOR REINFORCING STEEL BOTTOM SLAB SHALL BE 3' AND Y' OTHERWISE. AM 1405 H4-3 B-5 TO SR 169 AP Topton Stsb STAGE 2 - WIDENING of Transportation AND SR 616 INTERCHANGE CABINET FOUNDATION DETAILS 2 OF 6 co I MR