Loading...
HomeMy WebLinkAboutT-269268ii i i i Y a 1t4 "O BRAIN NCH IN SEE ILLUMINATION PLAN$ PC CONDUIT AND HARE SU Cv CABINET FRONT A \ @ RM 22 %P) 1W" RIGID 1 _SDA. CONDUIT DRAIN) SUMP (TYR) SECTION XF NTS — 7624 CABINET FOUNDATION DETAILS 6 OF 6 P ,D A i 4 RM 22 %P) 1W" RIGID 1 _SDA. CONDUIT DRAIN) SUMP (TYR) SECTION A NTS — SUMP (fYP)- . ✓L_.._.- .- _.- _.._. -_.._. °'CAMERA CLAMP BARE. COPPER WIRE TO REBAR G� GROUND ROD CABINET BEE E STD. PUN REAR AR W r$ T fZ EA. WAY MAX (M.TOP 8 00TTOM) CABINET, FOOMWTION DETAIL GUARD RAIL OF STA: SR 05 12A5 NOTES: NTS 1, ALL CONDUITS SHALL BE CLUSTERED TCWARO REAR OF THE CABINETS. 2. SLOPE FOUNDATION VRIFF TO THE EDGE. 3. SLOPE PADS W. THE SUMP IN CENTER. 4. ALL CONDUITS SHALL HAVE A COUPLING FLUSH WITH THE SURFACE OF THE FOUNDATION AND A NIPPLE THAT EXTENDS Z' UP, 5, ALL CONDUITS SHALL BE HOT DIPPED GALVANIZED OR PVC, 8, USE SILICONE BEADED SEALANT AROUND CABINETS AND PAD. L. BOLT PATTERN IS PROVIDED BY CABINET MANUFACTURER. BOLTS SHALL BE 518" DIA. BY 6' WEDGE ANCHORS, 8, CONCRETE SHALL BE CLASS 3900. 9. ALL ANCHOR BOLTS SHALL BE NOT DIPPED GALVANIZED. ALTERNATE: STAINLESS STEEL CINCH BOLTS PER MANUFACTURER'S RECOMMENDATION, BOLT SHALL EXTEND A MINI 92 'ABOVE THE CONCRETE PAD. hr' 6 BEE SHEETS TSN-0-03 THROUGH TBN-0-0T FOR WIRE NOTES. t. CLEAR COVER FOR REINFORCING STEEL BOTTOM OF SUB SHALL BE T AND T OTHERIMSE. DESKaN TASK LEAD: n. MDBFneD PACKAUE: RFC -1C (�T co I X�t u B Washington State Department o/ Transportation 1.405 1 -6 TO SR 169 STAGE 2 - WIDENING AND SR 515 INTERCNANGE TSD°P23 _ (..3 7624 CABINET FOUNDATION DETAILS 6 OF 6 co I