HomeMy WebLinkAboutT-2692AF•
C,
Y
O
0
a
SPACE AC SHOWN
ui 928 6i (E.P.:
3A�jP 1> I
.SYIRRUPd`x6
I
29 46 (EF.)
*3R ALTERNAYIII M A.40 223 @' 32 e!0
STIRRUP END HOOK
0t9
�j 05/16 Wl
HO, SECTION
V
2 --2M87 VIES
(TYP.)
DEralte
I4
CON5rRU6TI0N JOINT WI
KOU6HENEO SURFACE (TYP.)
385 TIE
VECK SLAB SPA. ^.E M1$ SHOWN SEE UUCT SPLICE
DORF.-
/� VEFfiii (YYY.)
>a_a-n. �n�a s/
cv -n-sv -v�a v- ar v- vv sv-o -s
a/! a
•e a e sa
I
i6 35 Y4
I I I
I � I
I (yam. I
1 I
I
I I I
I 1 I
I I
I � I
I � I SOAK 9L.hCK
I
'.. X15 TIE
L STIRRUPS
I
C6 jEF.J
SECTION C
8G-0 -21
- - -- r ' ' -EOGE OF GIRDER 101
A5 5HOWS Z
/,�.. FLANGE (ABOVE) £ H
l
W P!AR OLUMN
NFORCEMENT
ENO OF PC, GIRDER
DETAIL E `�—€COLUMN
LEFT COLUMN SHOWN. 8G-021
916HT COLUMN 51MILAR NOTE:
ADJUS LON61TUmNAL BAR, TRANSVERSE STIRRUP AND
THE TIE SPACING A5 REQUIRED TO CLEAR COLUMN
REINFORCEMENT.
w_ 329 a5IE.P)-
L�IAAX .22
STIRRUPUPPR
'#
+M ALYERNAYIVE TWO PIECE BAR
ALLOWABLE GVER THE
COLUMN5 L
2'-0 MIN
LP.P SPLICE
VERT.
—2 O 9'R7 TIES (E.F
@3¢';84 TIE jTYP)
V e MIN. LAP' SPUD
2 M17 TIES (YYP.)R"
]4'v TIE
8- 5�^e RIO
14 TIE (TYP)
MIN LAP SPLICE
REINFORCEMENT
OF ROADWAY ' SECTION D vLAO CG D 21
TOP OF P.C. <NDOEce
- OPi(GNAL `5'SPP;CE AS SNCAYN ON DETAIL E.
CONSTRUCTION IGN JOINT THIS SH£Ei.
DETAIL P
AShUMN 'II 3 lI'I
fYe$10x e
TV
TABH LEAK
P. GUENTHER OpNyRAtt pP Washington State
PACKAGE: 7624 WDeparlsinontofTninsporl
R
OYE: I
'1 THE CONYRAQOR SHALL MEASURE
THE HORIZONTAL AND VERTICAL
DEVIATION5 OF THE DUCT. FROM
PLAN LOCATION5 AT THE SPLICE
LOCATIONS IN FIELD, THE
MEA5UREP PEVIATIONS SHALL BE
SUBMITTED YO THE ENGINEER FOR
APPROVAL PRIOR TO THE PLACEMENT
OF ANY REINFORCEMENT,
DUCT 5PL10E DETAIL -*-2
1405 BO-0-22 1.5 TG SR 169
STAGE 2 - WIDENING
It AND SR 515 INTERCHANGE °
BENSON R AD BRIDGE 620
PIER 3 CROSSBEAM SECTION AND DETAILS