Loading...
HomeMy WebLinkAboutT-2692B5• i • PIER 4 RETAINING WALL LOCATION PLAN C55 TKA.NSPIOH FENCING-\ TOP OF PEOF5tRIAN PARRIED -, MT. ST, HELENS PIGMENTED REALER 70 P -O" BCLOW FIN15HE0 GRADE WALL WORKLINE a L "N t FINISHED GSAD£ IN FRONT OF WA ACH SLAP ,OF OF 300CRADE SEE WSDOY STANDARD PCA.V G -4 FOR SACKFUL REQUIREMENTS HEEL GRAVFL SACKFHL FOR DRAINS. SEE ALT. ORNNAGE DETAIL ON WSDOT STANOARO PLAN 0 -R FOR DETAILS BGIIOM OF FOOi1.VG -� TIE �'Y`� - - �, 6' UN DE RV RAIN PPE. TIE AETA!N Nb WA A UNVEAIII C56 YRAb'SITION FENC 46 —� —� TO PIPE HFHINO A61JTMENT 7 - COMPACTED 5'JC:iRADE TOP OF YRAFFIC SRRRiER 8 TYPICAL RETAINING WALL 5ECr10N ELEVATION RETAINING WALL 4L ELEVATION RETAINING WALL 4R N07ES, 1. TO FOOTLNG AMP WALL REINFORCEMENT OESIGN INFORMATION. SEE WOOD' .STANDARD PLAN 0-10.10-00 FOR REINFORCED CONCRETE RETAINING WALL TYPE L H0INDICATES WALL OES(G.V HEIGHT, 2 SEE WSODT STANDARD PAN 0 -4 (CONDITION A WITH 6E0i XTLE) FOR WALL ORAMAGE AND BACKFILL REQUIREMENTS. OOTING ELEVATIONS AND SUBSTKOCTUAE PETALS ARE 5UBJ T TO CHANGE DEPE.NOIN6 UPON FOUNDATION MATERIAL ENCGUN FRFD REINFORCING STEEL FOR 100TMG5 AND WALLS SHALL NOT 5E CJ! UNTIL FINAL ELEVATIONS HAVE PEEN PETTRMINED AND FOOTINO DETAILS HAVE BEEN MODIFIED, IF NECES'vARY. 4. THE ALIOWALILE DESION BOIL PRESSURE FOR FOOLISH PESfON IS 4000 T 5. ALL PILUEN'51OH5 AND ELEVATIONS SHALL DE VERIFIED IN THE FIELD BY THE CONTRACTOR. 8. ALL CONCRETE SHALL BE CLA55 4000. T CURTAN WALLS NOT SHOWN, y EOTTOM OF TT�m »..TT�e�.�o�.��oo���.��-- .�.o -• _. ON PEN 4 CilAYA1N WALL. z FOOTING ELEf. }} T FOR DETAILS, 5E PIER 4 BGYYGM OF NO. ISSUE DATE �`,.�U 5ECT OH5 AND G TAILS" O-2d {T"PJ ---'"" ~ ~0 e...��«< :.we..� e }} FCQIiNG CHECKED BY DESIGN APPROX. FINAL \� ELEV. BT GRGUM1✓ LINE _. _ .5 EXfSYINO '� -+�_� AR., FINAL m GROUND LINF1 GR'JJNG LIME MANFDER: __ _ ____ _ a _...1 - _ __ 5OTTOM OF F OTINO J. BAUNAN TEXISTINO p ELEV. 950 --- ---- -- ORCLMD LINE B" -29 ______ ___ FOGYMG DESIGN m ELEV. IMlS ELEVATION RETAINING WALL 4L ELEVATION RETAINING WALL 4R N07ES, 1. TO FOOTLNG AMP WALL REINFORCEMENT OESIGN INFORMATION. SEE WOOD' .STANDARD PLAN 0-10.10-00 FOR REINFORCED CONCRETE RETAINING WALL TYPE L H0INDICATES WALL OES(G.V HEIGHT, 2 SEE WSODT STANDARD PAN 0 -4 (CONDITION A WITH 6E0i XTLE) FOR WALL ORAMAGE AND BACKFILL REQUIREMENTS. OOTING ELEVATIONS AND SUBSTKOCTUAE PETALS ARE 5UBJ T TO CHANGE DEPE.NOIN6 UPON FOUNDATION MATERIAL ENCGUN FRFD REINFORCING STEEL FOR 100TMG5 AND WALLS SHALL NOT 5E CJ! UNTIL FINAL ELEVATIONS HAVE PEEN PETTRMINED AND FOOTINO DETAILS HAVE BEEN MODIFIED, IF NECES'vARY. 4. THE ALIOWALILE DESION BOIL PRESSURE FOR FOOLISH PESfON IS 4000 T 5. ALL PILUEN'51OH5 AND ELEVATIONS SHALL DE VERIFIED IN THE FIELD BY THE CONTRACTOR. 8. ALL CONCRETE SHALL BE CLA55 4000. T CURTAN WALLS NOT SHOWN, y NO. ISSUE DATE ISSUE RECORD - DESCRIPTION DESIGNED BY ENTERED BY CHECKED BY DESIGN - MANFDER: 1 I I( � 1 1 1 1 I J. BAUNAN I -S TO SR 1SS B" -29 DESIGN S ® TASK L£aD: x STAGE 2 - WIDENING MOD"! REMUED KOUAN D. xe$DERBDN P.DUENTxEa P.$UENDLER !176324 l W$$hlBgtoB St$fe AND SR S1S INTERCHANGE _ 551 08N #IIm RFI Rd1 ®R£YIiED RW UPIDIN ®0.91N �TA16 HDUAN K6p1ENY8ON P.BUEXTIER pACN0.DE: D$p$a6nont OP Tn@nspolffitlon " ®m® @ 1.742 RFIFA$ED FDR CDNSTRUCTIDX -@/L E. NBI8DX &XENDCR@OX P.DY @XTH@R \ \ BENSON ROAD BRIDGE �`�- A &WB@ FlNEL DEBIDN �L E. NRJON T.6FLB P.DUENIXER PIER n RETAINING WALL DETAILS er.