Loading...
HomeMy WebLinkAboutT-2692CEW NOT AS : 1, ALL E9GE5 OF ORISGE APPROACH SLAB SHALL BG -Oy-54 I HAVE z" KAOU EXCEPT THE LONGITUDINAL Na — SPAY AP4 � 46 8AR5 AND APB M ACUTE CORNERS 1%" RADIUS EDGE SHALL BE PROVIDED. 05 HBACK SANE LINES AND SHALL BE CONSTRUCTED AND OF S PAVEMENT SEAM BR5 '-ADD 15 x 5' -0" SOT. MAT ACRD_ SPACES W/ 1101 JOINT 35 E r SEE 'LAYOUP'FOR CARVE DATA, L PIER 4 APPROACH 5LA13 P82 sA # Arz �2` 46 , LONGITUDINAL BAR who // x% f'B9R5 9 9" /I %%IAPtE X44 ®t' -E` TUCN WITH RdUGHENEO SU RFACE Q j f 5 A. 6 AP �MA4 1-E FINISH GRADE X. TOP OF !J >�510EWALK %LAP2 IF &6 LONGITUDINAL Bhx �xx g2 g; XIVOE TOP OF BRIDGE APPROPCH SLAG NOT AS : 1, ALL E9GE5 OF ORISGE APPROACH SLAB SHALL HAVE z" KAOU EXCEPT THE LONGITUDINAL Na — EDGE OF THE FUCEEDING POUR OF A LONCKUDINAt CON5TRUL'TION JOINT. WHERE A 1%" RADIUS EDGE SHALL BE PROVIDED. 2. LONGITUDINAL JOINTS 54ALL 0£ PLACED ON MuruvER: SANE LINES AND SHALL BE CONSTRUCTED AND SEALED IN ACCORDANCE WITH STANDARD S SPECIFiCA:NO.N SEC'.'ION 5&0.-3(B. .AxNTS MAY BE EITHER A SAWC T CRACK CONTROL .IdiNT OR A CONSTRU„TiON JOINT. T -' TN —R - -® w SAWCUY JOINTS DNA" TERMINATE r D' BEFORE API5 g1C6 dR REACHING COBB OF SLAB AND MUST BE SAW CUT AS 500H AS P055IBLE AFTER PLACEMENT OF CONCRETE. 5" (TYP.) x API ®Y5 API9 i'i qpp QR45 TRANSVER5E 5AR5 / 1 -[AFT H LONGITUDINAL BART rR5E BARS J r x AF3 85 TRANSVER5E BAR 2 -WIDENG LONGITUQINAL x YP.P3 CS TRANSVERSE OAR AP �]48 LONGTUONAL OAR CRACK CONTROL JOINT OAR MARKS. r. WEKTHER SEE NOTE 2 �^ SECT ION C pND SR 51S INTERCHANGE SECT ION Q 2'4 FIRST PLACEMENT xx OMITTED ON PLAN FOR CLARITY. MIN. P C[R. - FA 7#5 Dap8ThnanB of TnHnBPO(faflOD TRAFFIC BARRIER SHEETS. _ -BACK OF P. DIIENTHER `'� jAP31 16 PACKAGE: lam.- / PAVEMENT SEAT 10!QTN9 RELEFEED FIXi CDNBIRUMO. -iA E. NELSON BRIDGE I APPROACH SLAB LONGITUQINAL RFC Zp CON57RUCTION JOINT SEE NcrE + a 2 A '-ADD 15 x 5' -0" SOT. MAT ACRD_ SPACES W/ 1101 JOINT 35 E r SEE 'LAYOUP'FOR CARVE DATA, L PIER 4 APPROACH 5LA13 P82 sA # Arz �2` 46 , LONGITUDINAL BAR who // x% f'B9R5 9 9" /I %%IAPtE X44 ®t' -E` TUCN WITH RdUGHENEO SU RFACE Q j f 5 A. 6 AP �MA4 1-E FINISH GRADE X. TOP OF !J >�510EWALK %LAP2 IF &6 LONGITUDINAL Bhx �xx g2 g; XIVOE TOP OF BRIDGE APPROPCH SLAG MA HMA ROAQWAY JOINT QETAIL SAWCUT SHALL BE FILLED WITH HOT -POURED COMPONENT IN ACCORDANCE WITH STANDARD SPECIFICATION SECTION 9 -04.2 I) AND SEPLEO IN ACCORDANCE WITH STANDARD SPECiEICATIOG .SECTION 5- 053(6)8 SEE FINNED ANCHOR ✓EYNL AP5 $'F5 BACK OF PAVEMENT SEAT ®Y5 BRIDGE APPROACH sun -LoJ46 4nr3 a5 5U9FAC;NG BASE COJ95E COMPACTED DEPTH LONGITUQINAL SECTION AP9`9 X5 0 Or CENTERS, PLACED IN ABUTMENT (BARE MAY BE FIELD SENT) SUPERSTRUCTURE BEE "HMA ROADWAY JOINT L ABJTMENT o• J� , Na — APPROACH 5LAO EDGE III' I' —I I: MuruvER: S FORMED BRIDGE ^- T -' TN —R - -® w APPROACH API5 g1C6 dR I -5 TO Sft 159 SLAB EDGE x API ®Y5 API9 i'i /% iAP? ®45 x `TRANS TRANSVER5E 5AR5 / iA�YS �Y6 OR AP19 ®46 ,I`x -[AFT H LONGITUDINAL BART rR5E BARS J r x AF3 85 TRANSVER5E BAR 2 -WIDENG x YP.P3 CS TRANSVERSE OAR AP �]48 LONGTUONAL OAR x SEE APPROACH SLAB PLANS FOR OAR MARKS. r. WEKTHER �^ SECT ION C pND SR 51S INTERCHANGE SECT ION Q xx OMITTED ON PLAN FOR CLARITY. SEE PEDESTRIAN CARRIER OR .ee. Dap8ThnanB of TnHnBPO(faflOD TRAFFIC BARRIER SHEETS. _ -BACK OF P. DIIENTHER D.HENDEMN H.DUAN PACKAGE: lam.- / PAVEMENT SEAT 10!QTN9 RELEFEED FIXi CDNBIRUMO. -iA E. NELSON BRIDGE I APPROACH SLAB BENSON ROAD BRIDGE RFC Zp EXPAN &ON JOINT A OFF SHEET N"-OLa4 (%- CONSTRUCTION JOINT �'-+- K" SAWCUT JOINT P. GUENTHER FOR PEYP.ILS / WITH 6LA55 U FINi5H MA HMA ROAQWAY JOINT QETAIL SAWCUT SHALL BE FILLED WITH HOT -POURED COMPONENT IN ACCORDANCE WITH STANDARD SPECIFICATION SECTION 9 -04.2 I) AND SEPLEO IN ACCORDANCE WITH STANDARD SPECiEICATIOG .SECTION 5- 053(6)8 SEE FINNED ANCHOR ✓EYNL AP5 $'F5 BACK OF PAVEMENT SEAT ®Y5 BRIDGE APPROACH sun -LoJ46 4nr3 a5 5U9FAC;NG BASE COJ95E COMPACTED DEPTH LONGITUQINAL SECTION AP9`9 X5 0 Or CENTERS, PLACED IN ABUTMENT (BARE MAY BE FIELD SENT) SUPERSTRUCTURE BEE "HMA ROADWAY JOINT L ABJTMENT o• aE ®lam Na ^ - MuruvER: a. saURAN J."UN w w.aH I -5 TO Sft 159 �BGO-S TABK LEADSTAGE 2 -WIDENG r. WEKTHER Washington Stato pND SR 51S INTERCHANGE .ee. Dap8ThnanB of TnHnBPO(faflOD OI'NAT ACROSS LONan. JOINT P. DIIENTHER D.HENDEMN H.DUAN PACKAGE: 0 10!QTN9 RELEFEED FIXi CDNBIRUMO. -iA E. NELSON D, ....E.. P. GUEMXER BENSON ROAD BRIDGE RFC Zp 7524 A BMpM FROM. DESIGN -3A E. NELSON T. SMA P. GUENTHER ..... „.�.. APPROACH SLAB DETAILS (2 OF Y) 1 mo:>s