Loading...
HomeMy WebLinkAboutT-270315Figure I Details for vaults J02, iO3, J04,105, and J06 City's Contractor Responsibility: This vault is a jn_n Linn vault and does not ha_nge in dies —inns hetween manufacturer. Vault excavation should be for the dimensions shown in this figure. One (1) ground plate is to be installed at a minimum depth of 5 feet with a 92 bare cooper wire extended into the vault as shown in this figure. Puget Sound Energy will provide the ground plate and 92 bare cooper ground wire. Reference CONDUIT INSTALLATION DETAILS. 2,200 Ids Grounding pigtail for teleohone and N #2 bare copper 11,500 /i fl ` (2) Ground Plates Buried 5' Min 12,280 1 i 0 O \ u' .Figure 2 Below grade,12 kV and 34 kV Figure 5 i Details for vaults T04,TO7, and TOS City's Contractor Responsibility: This vault is a transformer vault and does not change in dimensions between manufacturer. Vault excavation should be for the dimensions shown in this figure. One (1) ground plate is to be installed at aminimum depth of 5 feet with a #2 bare cooper wire extended into the vault as shown in this figure. Puget Sound Energy will provide the ground plate and #2 bare cooper ground wire. Reference CONDUIT INSTALLATION DETAILS. 1557 Lbs- 20" 4' -0" 4 .a. 3..5" 3250 Lbs — j Buried . S'Min 0 00 j 7Vo- SeI -27n3 Figure 2 Details for vaults VOland V02. City's Contractor Responsibility: This vault is a 'large pulling vault and does not change in dirnn-in- h twee -., manufacturer. Vault excavation should be for the dimensions shown in this figure. With 4 -12" additional rises at each manhole. Set vault to match sidewalk grade. Two (2) ground plates are to be installed at a minimum depth of 5 feet with a #2 bare cooper wire extended into the vault as shown in this figure. Puget Sound Energy will provide the ground plate and #2 bare cooper ground wire. Reference CONDUIT INSTALLATION DETAILS Figure 3 Details for vaults V03. City's Contractor Responsibility: This varin is a i e ul 'lin ''°-- atg p g r -` age ---:- 1: dim -$ions ,,.,... --- manufacturer. Vault excavation should be for the dimensions shown in this figure. Set vault to 2" above landscape grade. Two (2) ground plates are to be installed at a minimum depth of 5 feet with a #2 bare cooper wire extended into the vault as shown in this figure. Puget Sound Energy will provide the ground plate and #2 bare cooper ground wire. Reference CONDUIT INSTALLATION DETAILS - ---- -1 JJJJJJJJ JJJJJJ JJJJJJ) J JJJJJJJJ) JJ H20 'Full Traffic' )JJJJJJ J..JJ J J__._ JJJJJJJJJJ JJJJ 11,500 IbS J JJJJJJJJ) J JJJ rated manhole ..JJJJ )JJJJ JJJJJJJ- Cover . 42 "Dia J JJ J J JJJ J JJ J JJ J JJJ: JJJJJJJJJJJJJJ •JJJJJJJJJJJJJJJJ '.J J1J_ JJJJJJJJJJJJJ 4JJJJJJJJ.J .JJJJJJ___ JJJJJJJJJJ - JJJJJJ ?JJJ_.JJ_JJf_:JJ_,___JJ JJ_ 'JJJ JJJJ. - \JJJJJJ' J (2) Ground Plates a Buried 5' Mm e 12,2801bs I 0 i 0 Srii #2 CU . _ \ 0 D 0 0 \\ 17' -10" Min b D/ 0 n 11'3" Min Fi \` 'I, \ `\\ 11-10" Ma F u Figure 4 Details for handhole H04, HJ H06, and H08. V City's Contractor Responsibility: These concrete handholes are for low voltage secondary and service conductor. It is rated. u _ • -.•tar �aFfic Thie handhole H2O loading and may be installed in areas wim incid -1 v�hi does not change in dimension between manufacturer. Vault excavation should be for the dimensions shown in this figure', Set handholes, flush with concrete sidewalk and asphalt parking lot. I Sat handhole flush to final grade teal Door I-,' I 2' 1'1 i,'I I'1i LYk. •IY. s.)G %'✓' :.4vk` 7B i'=_i'i __i'i' N,`u.' v1wc ✓c`.. y 12 1895 Lbs l 1 0 SeMce conductors n duct (1 Install PVC bellends and grout into wall Conduits and conductors shall enter from ends of handhole through knockouts provided T- 7703/5 Vault Details CALL 1 -800- 424 -5535 2 BUSINESS DAYS BEFORE YOU DIG v-10"Min � MMv/ Details for vaults T06 City's Contractor Responsibility: \ This minipad handhole is for a transformer and does not change in dimensions between manufacturer. This handhole has a 21 "x24" access hole. Locate handholes behind sidewalk on city right -of -way. Set and level handhole so that the top surface is 2" above VAULT INSTALLATION DETAILS finished grade. Vault excavation should be for the dimensions shown in this figure. This handhole is self grounding and does not require additional ground plates or bare copper wire. CITY'S CONTRACTOR RESPONSIBILITY: '.Route all conduits through bottom center of handhole. Assemble conduit elbows ' (24 "radius) into handhole per CONDUIT INSTALLATION DETAILS. Primary conduit I. Contractor will install grounding plates at a minimum of 5' depth and #2 Bare CU elbows shall be installed on right side front strut and secondary conduit elbows on left wire,according to details and notes. #2 CU wire is installed into vault with a small side of rear stmt. The left side of front maybe used for extra secondary conduit elbows. chisel hole which is then sealed with either silicon sealant or grout. Puget Soundl Energy to install full grounding loop. Terminating the conduits will involve using the following material: 2. Note the weight of each piece of vault. Vaults will be delivered by manufacturer' and I Clamps for 2" and 3" IPS conduit. coordination islrequired to set these vaults. City's contractor will need to provide any 2 Nut %z" Spring Chan Strut. cranes or booms to set these vaults. 3 Cap screw V2" .x I" Everdur: 4 Washer %:" Bolt Sized. 3. Note the dimensions of each vault. Depending upon in nominal vault size 5 5 Washer 2 -I/4" Sq Flat 3/16. -5 /8 ". will vary. Puget Sound Energy Inspector will provide exact dimensions before Temporary Conduit Plugs. delivery and contractor into excavate vault hole to maximum dimensions shown in Us detail. Reference CONDUIT INSTALLATION DETAILS. 4. All large power vaults are to be set with bottom section or floor of vault level. Note: PSE will install TO and break into primary J -Box with new conduit run. City Covers are to be adjusted flush to sidewalk or road profile. Vaults are to be set 2" contractor will provide vault excavation. ., above finished ,rude and to profile in landscaped areas. Temporary T conduit 5. City's contractor is required to provide all surveying necessary for proper alignment Plug © and grade elevation. Vaults are to be set according to City of SeaTac requirements. Structural bedding material may be needed to avoid vault settling or to provide alevel excavation. Any work required to reset vaults due to incorrect setting depth will be at full cost to contractor. sltit _ I y •. . -- - -- ' _ _ all _ _ _ _ Install mastic sealant between th e sections of multi section vaults Sealant is usually provided by the manufacturer. PUGET ['SE D 35" _ y, ••• i 7. All conduits are to be routed or installed according to the Conduit Installation Details. " v _. _ 42" \ i FIR 11�� 10 Figure 4 Details for handhole H04, HJ H06, and H08. V City's Contractor Responsibility: These concrete handholes are for low voltage secondary and service conductor. It is rated. u _ • -.•tar �aFfic Thie handhole H2O loading and may be installed in areas wim incid -1 v�hi does not change in dimension between manufacturer. Vault excavation should be for the dimensions shown in this figure', Set handholes, flush with concrete sidewalk and asphalt parking lot. I Sat handhole flush to final grade teal Door I-,' I 2' 1'1 i,'I I'1i LYk. •IY. s.)G %'✓' :.4vk` 7B i'=_i'i __i'i' N,`u.' v1wc ✓c`.. y 12 1895 Lbs l 1 0 SeMce conductors n duct (1 Install PVC bellends and grout into wall Conduits and conductors shall enter from ends of handhole through knockouts provided T- 7703/5 Vault Details CALL 1 -800- 424 -5535 2 BUSINESS DAYS BEFORE YOU DIG SCANNED FES 15 1002 m N oO o a �m � N C ran w ;1 t, PUGET ['SE D ••• SCANNED FES 15 1002 m N oO o a �m � N C ran w ;1 t,