CONSTRUCTION NOTES
GENERAL NOTES
ch
_ rn
BREAKER
.1f
1 All work shall be in accordance with the City of Renton Standards Specifications and
Distribution on 25' Davit Pole with 6' arm. Also install WSDOT Type I
®
TYPE 11 JUNCTION BOX
these plans.
CL
Lighting
2
The locations of features shown are approximate and shall be verified in the field by
2" the contractor as necessary.
Install luminoire
¢--�
LUMtNAtRE AND POLE
2"
(Schedule 40)
photocell on #2.
®
SERVICE CABINET
3 Install all street lighting materials shown on the plans, except where noted. All materials
Service Cables (3 - #2's) and Conduit (2' Schedule 40) shall connect from
- --
CONDUIT
shall be new and of the best available grade or quality, except where noted.
Service Cabinet to nearest Puget Energy power source_
A2
ZQ
4 The contractor shall submit a request to the City of Renton for materials approval at
Install Service Cabinet at Sta. 3 +14, 22t L
\3J
J
the earliest possible date-
Remove existing luminaire.
- - --
r)
b
z
5 All work shall be consistent with utility agency requirements. The contractor shall contact
O
all pertinent utility agencies 48 hours before commencing work and shall coordinate the
0
t-
work with the utilities throughout the project.
Z
g
Q
Z
The contractor shall be responsible for any damage to existing utilities. The contractor
6.
shall notify the affected utility company and the City immediately upon damage.
Y
�
7 The contractor shall notify the City of Renton Field Inspection Division (277 -5570) for
inspection purposes, 24 hours before commencing work. No work shall be covered until
it has been examined by the engineer.
8 All conduit shall be PVC Schedule 40 unless noted otherwise.
9 All conduit cover shall be 24 inches. ,
o
ENCHMARK
NE 1/4,
S 1/4, JEV.T. TWi e23Nss RGE.5E.y
W.M.
CONDUCTOR
CONSTRUCTION NOTES
LEGEND
�l
Install new flat lens cobra head 1OOW HPS, 24OV, Medium Cutoff Type III
BREAKER
TYPE I JUNCTION BOX
2"
(Schedule 40)
Distribution on 25' Davit Pole with 6' arm. Also install WSDOT Type I
®
TYPE 11 JUNCTION BOX
2"
(Schedule 80)
Junction Box (See Standard Pion J -11o) and pod foundation.
Lighting
2
2"
(Schedule 40)
Install luminoire
¢--�
LUMtNAtRE AND POLE
2"
(Schedule 40)
photocell on #2.
®
SERVICE CABINET
3
Service Cables (3 - #2's) and Conduit (2' Schedule 40) shall connect from
- --
CONDUIT
6'
Service Cabinet to nearest Puget Energy power source_
A2
WIRE NOTE
4O
Install Service Cabinet at Sta. 3 +14, 22t L
\3J
CONSTRUCTION NOTE
6'
Remove existing luminaire.
- - --
R.O.W.
®� y._ IN POWER POLE / ; --
3 ELEV = 396.33�sbd /' 3
1 r c
t I I I
t I I i t
I 18 1 I€
1 i
3
5 2
4 13 12
CURB 3 +00
E-�
6 /
#1 /
O i
a /a
w d \ �.
o
m
f
z
0
e N
w
a �
Z
a
wz
F z z
4o 1
W
3
of
to
Qy
Or
a
WIRING SCHEDULE
RUN
CONDUIT
CONDUCTOR
COMMENTS
NO.
SIZE
BREAKER
I
BREAKER
Al
2"
(Schedule 40)
2 -¢f8 AWG (USE -XLP)
Lighting
J�Aq�
2
2"
(Schedule 80)
2 -#8 AWG (USE -XLP)
Lighting
2
2"
(Schedule 40)
2 -- AWG (USE -XLP)
1 -#8 Bare Ground
Ground
Ground
A
2"
(Schedule 40)
2 - #8 AWG (USE -XLP)
3- 10 (USE -XLP)
1 -8 Bare Ground
Lighting J
Photocell
Ground
3
2"
2"
(Schedule 40)
OPEN
2#8 AWG (USE -XLP)
3 -#10 (t)SE -XLP)
Spore
Lighting
Photocell
10 0 10 20
SCALE IN FEET
1 \
ni
4 CURB
- - - - - ; - ---- - - - - - - - ------ - - - - -- `
W
} w
`n
}
w
y �
` J
CONTACTOR CABINET
SERVICE &
MAIN
BRANCH
CONTACTOR
COMMENTS
CIRCUIT No_
BREAKER
I
BREAKER
1
21108
Service
100 amps
—
—
SERVICE CABINET
2
21116
3 +22
it 0022
A- 1/240)
—
15 amps
30 amps
3
POLE SCHEDULE -
POLE
NO.
POLE
I.D. IF
POLE
LOCATION
POLE
OFFSET
MOUNTING
HEIGHT
ARM
LENGTH
CIRCUIT
NO-
COMMENT
1
21108
1 +50
15' LT
25'
6'
A -1
2
21116
3 +22
32' LT
25'
6'
A -1
3
21126
4 +57
22' RT
25'
6'
A -1
4
21138
5 +73
65' LT
25'
6'
A- i
i