HomeMy WebLinkAboutT-273402M 1 ' 4 00 c� 1 x- i G a a 8 NE 1/4, S 1/4, JEV.T. TWi e23Nss RGE.5E.y ii CONDUCTOR CONSTRUCTION NOTES GENERAL NOTES ch _ rn BREAKER .1f 1 All work shall be in accordance with the City of Renton Standards Specifications and Distribution on 25' Davit Pole with 6' arm. Also install WSDOT Type I ® TYPE 11 JUNCTION BOX these plans. CL Lighting 2 The locations of features shown are approximate and shall be verified in the field by 2" the contractor as necessary. Install luminoire ¢--� LUMtNAtRE AND POLE 2" (Schedule 40) photocell on #2. ® SERVICE CABINET 3 Install all street lighting materials shown on the plans, except where noted. All materials Service Cables (3 - #2's) and Conduit (2' Schedule 40) shall connect from - -- CONDUIT shall be new and of the best available grade or quality, except where noted. Service Cabinet to nearest Puget Energy power source_ A2 ZQ 4 The contractor shall submit a request to the City of Renton for materials approval at Install Service Cabinet at Sta. 3 +14, 22t L \3J J the earliest possible date- Remove existing luminaire. - - -- r) b z 5 All work shall be consistent with utility agency requirements. The contractor shall contact O all pertinent utility agencies 48 hours before commencing work and shall coordinate the 0 t- work with the utilities throughout the project. Z g Q Z The contractor shall be responsible for any damage to existing utilities. The contractor 6. shall notify the affected utility company and the City immediately upon damage. Y � 7 The contractor shall notify the City of Renton Field Inspection Division (277 -5570) for inspection purposes, 24 hours before commencing work. No work shall be covered until it has been examined by the engineer. 8 All conduit shall be PVC Schedule 40 unless noted otherwise. 9 All conduit cover shall be 24 inches. , o ENCHMARK NE 1/4, S 1/4, JEV.T. TWi e23Nss RGE.5E.y W.M. CONDUCTOR CONSTRUCTION NOTES LEGEND �l Install new flat lens cobra head 1OOW HPS, 24OV, Medium Cutoff Type III BREAKER TYPE I JUNCTION BOX 2" (Schedule 40) Distribution on 25' Davit Pole with 6' arm. Also install WSDOT Type I ® TYPE 11 JUNCTION BOX 2" (Schedule 80) Junction Box (See Standard Pion J -11o) and pod foundation. Lighting 2 2" (Schedule 40) Install luminoire ¢--� LUMtNAtRE AND POLE 2" (Schedule 40) photocell on #2. ® SERVICE CABINET 3 Service Cables (3 - #2's) and Conduit (2' Schedule 40) shall connect from - -- CONDUIT 6' Service Cabinet to nearest Puget Energy power source_ A2 WIRE NOTE 4O Install Service Cabinet at Sta. 3 +14, 22t L \3J CONSTRUCTION NOTE 6' Remove existing luminaire. - - -- R.O.W. ®� y._ IN POWER POLE / ; -- 3 ELEV = 396.33�sbd /' 3 1 r c t I I I t I I i t I 18 1 I€ 1 i 3 5 2 4 13 12 CURB 3 +00 E-� 6 / #1 / O i a /a w d \ �. o m f z 0 e N w a � Z a wz F z z 4o 1 W 3 of to Qy Or a WIRING SCHEDULE RUN CONDUIT CONDUCTOR COMMENTS NO. SIZE BREAKER I BREAKER Al 2" (Schedule 40) 2 -¢f8 AWG (USE -XLP) Lighting J�Aq� 2 2" (Schedule 80) 2 -#8 AWG (USE -XLP) Lighting 2 2" (Schedule 40) 2 -- AWG (USE -XLP) 1 -#8 Bare Ground Ground Ground A 2" (Schedule 40) 2 - #8 AWG (USE -XLP) 3- 10 (USE -XLP) 1 -8 Bare Ground Lighting J Photocell Ground 3 2" 2" (Schedule 40) OPEN 2#8 AWG (USE -XLP) 3 -#10 (t)SE -XLP) Spore Lighting Photocell 10 0 10 20 SCALE IN FEET 1 \ ni 4 CURB - - - - - ; - ---- - - - - - - - ------ - - - - -- ` W } w `n } w y � ` J CONTACTOR CABINET SERVICE & MAIN BRANCH CONTACTOR COMMENTS CIRCUIT No_ BREAKER I BREAKER 1 21108 Service 100 amps — — SERVICE CABINET 2 21116 3 +22 it 0022 A- 1/240) — 15 amps 30 amps 3 POLE SCHEDULE - POLE NO. POLE I.D. IF POLE LOCATION POLE OFFSET MOUNTING HEIGHT ARM LENGTH CIRCUIT NO- COMMENT 1 21108 1 +50 15' LT 25' 6' A -1 2 21116 3 +22 32' LT 25' 6' A -1 3 21126 4 +57 22' RT 25' 6' A -1 4 21138 5 +73 65' LT 25' 6' A- i i SCANNED OCT - 81999 413. T- z73uer W, j 273�i e f SCANNED N0 -) 1998 T�