Loading...
HomeMy WebLinkAboutT-275708Lzz z I- O < W cn 0 O H U W Of X W W W N z 0 V C) z �W W W I- Z O Z W - I- F >Q oco Q= z Q + Z Wa zN W Q O A 0 < <i W Z <i ' V O Y J n° o� r_ N O 'E 3� E_ a z U _ E- � 4l � W a a .y 'E �E r C_N it C O, C O y a� mi �0 TRo- Q' -s't' SCALE IN FEET 20 10 0 20 40 HORIZ. OAKESDALE AVENUE SW EXTENSION —PHASE 78 & 2 ""'G NO. E8 ILLUMINATION AND sHEEr INTERCONNECT PLAN 5� of 6g GENERAL ILLUMINATION NOTES 1. CONSTRUCT CONCRETE PAD FOR PROPOSED STREET LIGHTING AND JUNCTION BOX PER CITY OF RENTON STANDARD PLAN J014 AND J015. 2. ALL PROPOSED ILLUMINATION CONDUIT RUNS (TRENCH) SHALL BE LOCATED 6' FROM BACKOF CURB EXCEPT AT WALL. 3. REFER TO SIGNAL P'_ ^.N FOR ILLUMINATION CONDUIT AT SIGNALIZED INTERSECTION. 4. CONSTRUCT LIGHTING UNDERGROUND SYSTEM PER CITY OF RENTON STANDARD PLAN J007. 5. ALL LUMINAIRE POLE BASES REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR. ALL OTHER UTILITY ITEMS REMOVED SHALL BECOME THE PROPERTY OF THE CITY (EXCEPT WHEN WORK IS DONE BY OTHERS) AND SHALL BE SALVAGED IN ACCORDANCE WITH THE SPECIFICATIONS. ❑ILLUMINATION CONSTRU-CT'^N' MOTES 1. FURNISH AND INSTALL ONE COBRA HEAD LUMINARE WITH POWER DOOR AND MEDIUM TYPE III CUTOFF OPTICS, 400 WATT HIGH PRESSURE SODIUM LAMP, AND FIXED BASE TYPE. MOUNTING HEIGHT AND ARM LENGTH SHALL BE AS SHOWN IN ILLUMINATION SCHEDULE. CONSTRUCT FOUNDATION PER WSDOT STD. PLAN J -1b AND THE SCHEDULE BELOW. FOUNDATION DEPTH SHALL BE AS INDICATED IN THE ILLUMINATION SCHEDULE. INSTALL TYPE I JUNCTION BOX ADJACENT TO LUMINAIRE PER CITY OF RENTON STANDARD PLAN J008. ROLL # 167 CONDUIT AND WIRING SCHEDULE RUN ARE BASED ON: NO. INFORMATION PROVIDED BY W &H PACIFIC SURVEY 1997 P• LQt, SI THIS WAS THE INFORMATION AVAILABLE AT THE TIME OF PLAN PREPARATION. CONDUIT CONDUCtTORS 1 2" PVC SCH 40 2 — #6, 1 — #8 GROUND — r - --� [)II i .i�� Iw �a I T_AF "'708 & f _l_J NOTE: THE EXISTING TOPOGRAPHIC AND PHYSICAL FEATURES SHOWN ON THESE PLANS ARE BASED ON: INFORMATION PROVIDED BY W &H PACIFIC SURVEY 1997 P• LQt, SI THIS WAS THE INFORMATION AVAILABLE AT THE TIME OF PLAN PREPARATION. �� oFnasq� e ACTUAL CONDITIONS MAY BE DIFFERENT. THE CONTRACTOR MAY ENCOUNTER %� VARIATIONS BETWEEN ACTUAL CONDITIONS AND THOSE SHOWN. THESE VARIATIONS WILL NOT BE THE BASIS FOR A CLAIM OR EXTRA COMPENSATION. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ENTRANCO. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES peesiuxeu s� °��� YGD BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. SCMNEO uCT 4 2W